Slide 1: Boral Peppertree Quarry CCC Meeting March 2021
Build something great™ BORAL PEPPERTREE QUARRY March 2021 > Community Consultative Committee (CCC) Peppertree Quarry 1 meeting Marulan
Slide 2: Agenda
Agenda ˃ 1. Welcome and introductions ˃ 2. Confirmation of minutes and actions ˃ 3. Business arising ˃ 4. Correspondence ˃ 5. Operations over the last 3 months ˃ 6. Environmental performance ˃ a. Incidents ˃ b. Complaints ˃ c. Air ˃ d. Noise ˃ e. Blast ˃ f. Water – surface and ground ˃ g. Heritage ˃
Slide 3: Welcome, Minutes and Business Arising
Agenda item 1 – Welcome & Apologies Agenda item 2 – Confirmation of Minutes Agenda item 3 – Business Arising 3
Slide 4: Agenda item 4 – Correspondence
Agenda item 4 – Correspondence December 2020, January, February 2021 ˃ Department of Planning, Industry and Environment ˃ Management plan updates and reviews ˃ Request for information on Blasting ˃ Advice on failure of PM10 HVAS ˃ EPA ˃ Advice on failure of PM10 HVAS ˃ Resource Regulator ˃ audits ˃
Slide 5: Operations
Build something great™ BORAL PEPPERTREE QUARRY 5 > Operations
Slide 6: Operations over the last 3 months
˃ Agenda item 5 - Operations over the last 3 months ˃ Safety ˃ Last injury onsite water to the ear. ˃ Focus on hazard reporting ˃ Overburden ˃ planning works continuing ˃ Pit Update ˃ extension of fixed conveyors ˃ orientation change for extraction - currently south east, moving to north ➢ Drop cut
Slide 7: Environmental Performance
Build something great™ BORAL PEPPERTREE QUARRY 7 > Environmental Performance
Slide 8: Incidents
Agenda item 6 Environmental Performance a. Incidents December 2020, January, February, March 2021 Incidents 2017 – March 2021 8 7 6 5 4 3 2 1 0 Sep-2017 Nov-2017 May-2018 Sep-2018 Nov-2018 Sep-2019 Nov-2019 Jan-2020 Sep-2020 Nov-2020 Jan-2017 Jan-2018 Jan-2019 Jan-2021 Mar-2017 May-2017 Jul-2017 Mar
Slide 9: Complaints
Agenda item 6 Environmental Performance b. Complaints December 2020, January, February, March 2021 Complaints 2017 to March 2021 6 5 4 3 2 1 0 May-2017 May-2018 May-2019 May-2020 Nov-2017 Nov-2018 Nov-2019 Nov-2020 Jan-2017 Sep-2017 Jan-2018 Sep-2018 Jan-2019 Sep-2019 Jan-2020 Sep-2020 Jan-2021 Mar-
Slide 10: Air – Deposited Dust, Onsite NW Boundary
Agenda item 6 Environmental Performance c. Air Peppertree Quarry Deposited Dust 2017 - 2021 Onsite (NW boundary) 30 25 g/m2/month 20 15 10 2.36 5 0 rolling Annual… Nov-2017 Jan-2017 Sep-2017 Jan-2018 Sep-2018 Nov-2018 Jan-2019 Sep-2019 Nov-2019 Jan-2020 Sep-2020 Nov-2020 Jan-2021 Mar-2017 May-2017 J
Slide 11: Air – Deposited Dust, Marulan South Road
Agenda item 6 Environmental Performance c. Air Peppertree Quarry Deposited Dust 2017 - 2021 683 Marulan South Road 10.00 9.00 g/m2/month 8.00 7.00 6.00 5.00 4.00 2.60 3.00 2.00 1.00 0.00 rolling… Sep-2017 Nov-2017 Sep-2018 Nov-2018 Sep-2019 Nov-2019 Sep-2020 Nov-2020 Jan-2018 Jan-2019 Jan-2017 Jan-2
Slide 12: Air – Deposited Dust, Long Point Road Tallong
Agenda item 6 Environmental Performance c. Air Peppertree Quarry Deposited Dust 2017 - 2021 432 Long Point Road, Tallong 20 18 g/m2/month 16 14 12 10 8 6 4 2 1.73 0 rolling… Sep-2017 Nov-2017 Sep-2018 Nov-2018 Sep-2019 Nov-2019 Sep-2020 Nov-2020 Jan-2017 May-2017 Mar-2017 Jul-2017 Jan-2018 Jan-2019
Slide 13: Air – PM10 Annual Average Trend
ug/m3 10.00 15.00 20.00 25.00 30.00 35.00 0.00 5.00 6/01/2019 18/01/2019 5/02/2019 13/02/2019 1/03/2019 19/03/2019 6/04/2019 24/04/2019 12/05/2019 30/05/2019 17/06/2019 c. Air In compliance until change in level. 5/07/2019 23/07/2019 10/08/2019 28/08/2019 15/09/2019 Annual average below goal at the
Slide 14: Air – PM10 24 Hour Performance
ug/m3 50 0 100 150 250 300 350 200 6/01/2019 18/01/2019 5/02/2019 13/02/2019 In compliance 1/03/2019 19/03/2019 6/04/2019 24/04/2019 24 hour goal of 50ugm3 12/05/2019 30/05/2019 17/06/2019 5/07/2019 23/07/2019 c. Air 10/08/2019 28/08/2019 15/09/2019 Annual average below goal at the boundary 3/10/201
Slide 15: Air – TSP Annual Average Trend
In compliance 100.00 200.00 300.00 400.00 500.00 600.00 0.00 4/1/17 15/02/2017 29/03/2017 10/05/2017 21/06/2017 2/08/2017 13/09/2017 Annual Average goal of 90ug/m3 c. Air 25/10/2017 6/12/2017 17/01/2018 running annual average 28/02/2018 Annual average below goal at the boundary 11/04/2018 23/05/2018
Slide 16: Noise – Quarterly Monitoring November 2020 (Day)
Agenda item 6 Environmental Performance d. Noise – quarterly monitoring – November 2020 Receptor ID Description Date Assessment Period Criteria Quarry Noise R8 Pace 30/11/2020 Day 40 36 R17 Myers 30/11/2020 Day 40 26 R2 Bartolo 30/11/2020 Day 40 23 R3 Coopers 1/12/2020 Day 40 25 R17 Myers 1/12/2020
Slide 17: Noise – Night / Evening Monitoring
Agenda item 6 Environmental Performance d. Noise – quarterly monitoring – November 2020 Assessment Receptor ID Description Date Period Criteria Quarry Noise R4 McClean 30/11/2020 Night / evening 35 34 R17 Myers 1/12/2020 Night / evening 35 31 R17 Myers 1/12/2020 Night / evening 35 26 R2 Bartolo 1/12
Slide 18: Noise – Evening Monitoring
Agenda item 6 Environmental Performance d. Noise – quarterly monitoring – November 2020 Quarry Noise Assessment ID Description Date Criteria Period R3 Cooper 1/12/2020 evening 52 32 R4 McClean 1/12/2020 evening 52 28 R8 Pace 2/12/2020 evening 52 24 In compliance 18
Slide 19: Blasts – Over Pressure
Agenda item 6 Environmental Performance e. Blasts Over Pressure 2020 - 2021 140 120 100 80 60 40 20 0 north west boundary north east boundary 683 Marulan sth road Pace criteria 1 criteria 2 ˃ In compliance 19
Slide 20: Blast – Vibration
Agenda item 6 Environmental Performance e. Blast Vibration 2020 - 2021 12 10 8 6 4 2 0 north west boundary north east boundary 683 Marulan sth road Pace criteria 1 criteria 2 ˃ In Compliance 20
Slide 21: Water – Surface
Agenda item 6 Environmental Performance f. Water - surface Quarterly monitoring round undertaken in January – March 2021. Next sample round quarter of April – June 2021 No issues with water supply or quality over the last 3 months 21
Slide 22: Water Samples – pH
Agenda item 6 Environmental Performance f. Water - surface Peppertree Water Samples pH 2012 to 2020 10 9 8 7 6 T1 pH 5 dam 4 lower criteria (6.5) 3 higher criteria (8.5) 2 MSth creek 1 U1 0 ˃ Below guideline for February samples 22
Slide 23: Water Samples – Turbidity
Agenda item 6 Environmental Performance f. Water - surface Peppertree water samples - Turbidity 2012 - 2020 300 250 200 150 NTU 100 50 0 T1 Main dam ANZECC guideline U1 MSth creek ˃ Below guideline for February samples, with the exception of Marulan south creek 23
Slide 24: Water Samples – Total Dissolved Solids
Agenda item 6 Environmental Performance f. Water - surface Peppertree water samples - Total Dissolved Solids 2012 - 2021 0 2 4 6 8 10 12 14 16 18 1400 350 1200 300 1000 250 800 200 mg/l 600 150 400 100 200 50 0 0 date T1 DAM ADWG aesthetic marulan sth creek U1 ˃ Below guideline for February samples
Slide 25: Water Samples – Total Phosphorus
Agenda item 6 Environmental Performance f. Water - surface Peppertree Quarry Total Phosphorus (mg/l) 2012 - 2021 0.6 0.5 0.4 mg/l 0.3 0.2 0.1 0 T1 dam marulan sth creek trigger U1 ˃ Below guideline for February samples with the exception of U1 25
Slide 26: Water Samples – Total Nitrogen
Agenda item 6 Environmental Performance f. Water - surface Peppertree Quarry Total Nitrogen (mg/l) 2014 to 2020 12 10 8 mg/l 6 4 2 0 T1 dam marulan sth creek trigger U1 ˃ Below guideline for October samples - U1 and dam above criteria 26
Slide 27: Water – Environmental Flow
Agenda item 6 Environmental Performance f. Water – environmental flow year total in flow 10% total out flow in compliance Comment Jan-2020 0 0 0.93 yes Feb-2020 125 12.5 597 yes Mar-2020 2 0.2 36.55 yes Apr-2020 2.6 0.26 2.37 yes May-2020 5.7 0.57 2.88 yes Jun-2020 2.2 0.2 2.65 yes Jul-2020 12.2 1.2
Slide 28: Groundwater
Agenda item 6 Environmental Performance f. Groundwater ˃ Monitoring conducted in January 2021. report is still pending ˃ October 2020 results show no changes to the groundwater ˃ Review of the existing wells was undertaken. ˃ Assessment has been made of the existing trigger levels for management ˃ ˃
Slide 29: Groundwater
Agenda item 6 Environmental Performance f. Groundwater 29
Slide 30: Peppertree Site location
Peppertree Site location a | 1 450.031 0857 | -34.7568 | [| 3 150.0298599 | -34.7557 | J 4 | 150.030186 | -34.7566 | t a Groundwater monitoring bores (mAHD) @ Actre @o ned quarry consent boundary \ —_—_=
Slide 31: Heritage
Agenda item 6 Environmental Performance g. Heritage ˃ Collation of Artefacts is continuing 31
Slide 32: Ecology
Agenda item 6 Environmental Performance h. Ecology ˃ No new plantings have occurred ˃ Site visit to Coolumburra property with BCT to assess comeback from bushfires 32
Slide 33: Stakeholder Engagement
Build something great™ BORAL PEPPERTREE QUARRY 33 > Stakeholder Engagement
Slide 34: Stakeholder Engagement
Agenda item 6i – Stakeholder Engagement ˃ Marulan Christmas Fair held with Boral Concrete Agitator in attendance ˃ Installation of fencing at meridian Park 34
Slide 35: Forward Plans
Build something great™ BORAL PEPPERTREE QUARRY 35 > Forward Plans
Slide 36: Operations next 3 months
Agenda item 7 – Operations next 3 months ˃ Dust extraction units are in operation with monitoring of the buildings for dust to be undertaken in the next month. ˃ Construction of water management infrastructure for the South western overburden emplacement to commence ˃ Commencement of new drop cut to
Slide 37: General Business
Build something great™ BORAL PEPPERTREE QUARRY 37 > General Business
Slide 38: General Business – Marulan South State Significant Development
Agenda item 8 – General Business ˃ Marulan South State Significant Development ˃ Draft conditions of consent have been received and discussed with DPIE ˃ Condition A25 Allows for the 1 CCC for both sites ˃ “With the approval of the Planning Secretary, the Applicant may combine the CCC required by th
Slide 39: Thank you for your attendance
Build something great™ BORAL PEPPERTREE QUARRY 39 > Thank you for your attendance.