Roxgold — Technical Presentation (April 2014)

23 slides from Roxgold's technical presentation, April 2014

  1. Slide 1: Yaramoko Gold Project Feasibility Study Conference Call

    TSX-V: ROG Yaramoko Gold Project Feasibility Study Conference Call April 2014 www.roxgold.com

  2. Slide 2: Cautionary Statement

    Cautionary Statement TSX.V: ROG This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of inferred and indicated mineral resources and probable mineral reserves

  3. Slide 3: Project Development Progression

    Project Development Progression TSX.V: ROG  Delivering on Key Milestones  On Track for Continuing Project Development Goals Q3/Q4 2014 Q1/Q2 2014 - Permitting: ESIA & Mining Convention - Feasibility Study Delivered - Financing 2013 - Continuing Regional - Detailed Engineering - Preliminary Economi

  4. Slide 4: Feasibility Study Economic Highlights

    Feasibility Study Economic HighlightsTSX.V: ROG Pre – tax $1,100/oz $1,300/oz $1,500/oz NPV5% ($M) $201 $300 $406 IRR (%) 38.8% 53.7% 68.8% Payback (Years) 2.2 1.5 1.1 After – tax $1,100/oz $1,300/oz $1,500/oz 5% NPV ($M) $168 $250 $337 IRR (%) 35.2% 48.4% 61.5% Payback (Years) 2.4 1.6 1.2 After-Tax

  5. Slide 5: Not All Ounces Are Created Equal

    Not All Ounces Are Created Equal TSX.V: ROG Margin Cash Cost Summary LOM LOM $1,400 ($/oz) ($/tonne) $1,300 Mining $242 $86 $1,200 Processing $89 $32 $1,100 G&A $61 $22 $1,000 Margin: $710 Refining $10 $4 $900 $800 Cash operating Cost $402 $144 All-in Costs: Royalties $65 $23 $700 $590/oz $600 Total

  6. Slide 6: All-in Sustaining Cash Cost Comparison

    All-in Sustaining Cash Cost Comparison TSX.V: ROG All-in sustaining cash cost curve for African Gold Producers 2,000 Yaramoko Gold Project – lowest 5% of projects by cost in Africa 1,800 1,600 1,400 US$/oz 1,200 1,000 800 600 Roxgold 400 200 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Koz 2015E US$1

  7. Slide 7: Highest Grade Undeveloped Deposit Worldwide

    Highest Grade Undeveloped Deposit Worldwide TSX.V: ROG Top 20 Undeveloped Gold Deposits Worldwide by Grade (g/t Au)* g/t Au • Yaramoko ranks among the highest grade undeveloped gold deposits in the world with a resource 18 grading over 15 g/t Au in the indicated category 16 14 12 10 8 6 4 2 0 * Sour

  8. Slide 8: Pre-Production Capital Costs

    Pre-Production Capital Costs TSX.V: ROG Pre-Production Capex Low Pre-Production Capex $5.7M Tailings & Water Storage $1.8M First Fills  Total Pre-Production Capital of $106.5 million $8.5M Owner’s Costs $30.7M Underground Development Capex Peer Comparison $8.7M Power Line $450 $400 $350 $8.7M $300

  9. Slide 9: Production Metrics

    Production Metrics TSX.V: ROG LOM Average mine production (tpd) 750 Average annual gold production (oz) 99,500 Average mill feed grade (g/t) 11.59 Tonnes Processed (Mt) 2.036 Average gold recoveries (% Au) 96.9 Total Gold Recovered (oz) 735,430 Life of Mine Production & Grade Profile 140,000 16 120,

  10. Slide 10: Mining Philosophy

    Mining Philosophy TSX.V: ROG  Extraction to be completed with long hole retreat mining with cemented waste rock backfill  Dual declines, minimizing footwall development allows for access to multiple mining faces at all times. Provides secondary egress for large part of mine  Allows for efficient

  11. Slide 11: Mineral Reserves

    Mineral Reserves TSX.V: ROG Effective April 22, 2014 Ore Type Probable Mineral Reserves Tonnes Au (g/t) Au Oz Crown Pillar 98,000 23.46 74,000 Development 440,000 11.75 166,000 Stope 1,459,000 11.07 519,000 Total/Avg. 1,996,000 11.83 759,000 • The mineral reserves calculation for the feasibility stu

  12. Slide 12: Simplified Flow Sheet

    Simplified Flow Sheet TSX.V: ROG Excellent Metallurgy 33.75 tph @ Throughput 91% Ave ROM Pad Crushing Circuit SAG Mill Grind Size (P80) 90 micron Gravity Concentration Design Bond Ball 17.5 kWh/t Work Index CIL Testwork (Carbon In Leach) Range: 55 - Gravity Gold ICC Recovery 90% (Intensive Cyanidati

  13. Slide 13: Power Supply

    Power Supply TSX.V: ROG  Significant opportunity to improve operating costs through the integration of reliable grid power  Opportunity is driven by 17.1c/kWhr vs 45c/kWhr differential between diesel and government gazetted grid tariff  Cost savings over diesel-generated electricity are estimated

  14. Slide 14: Opportunities & Impacts

    Opportunities & Impacts TSX.V: ROG OPPORTUNITY IDENTIFIED IN PEA IMPACTS • A geotechnical study with results to feed into  Achieved, significant reduction in footwall an optimized mine plan including reductions in development via incorporation of twin footwall and lateral development decline • Deta

  15. Slide 15: Opportunities for Further Optimization

    Opportunities for Further Optimization TSX.V: ROG Paste Backfill: • The use of paste backfill versus cemented rock backfill • Patterson and Cooke in Ontario, Canada are currently conducting a study to evaluate the use of this strategy. • Potential benefits include reduced overall costs due to lower

  16. Slide 16: Resource Estimate

    Resource Estimate TSX.V: ROG Effective April 22, 2014 Grade Cut -off Resource(1) Metal (capped) Category Tonnes Au g/t Au Oz >5.0g/t Indicated 1,600,000 15.80 810,000 Inferred 840,000 10.26 278,000 • This resource was based on a wireframe that was constructed to account for the entire width of the s

  17. Slide 17: 55 Zone Long Section – Open for Expansion

    55 Zone Long Section – Open for Expansion TSX.V: ROG www.roxgold.com

  18. Slide 18: Regional Exploration

    Regional Exploration TSX.V: ROG Regional Exploration Upside:  $5 million budgeted towards regional exploration in 2014  Targets:  Bagassi South  Haho  109 Zone  Boni Shear  Niankongo • Three drill rigs currently exploring at Yaramoko www.roxgold.com 18

  19. Slide 19: Bagassi South

    Bagassi South TSX.V: ROG Bagassi South: • Primary Target for H1 exploration • Multiple high grade intersections over a strike length approaching 300m and down to 200 vertical metres • Recent highlights include:  19.94 gpt gold over 3.7m including 43.7 gpt over 1.7m in hole YRM- 14-BG-037  16.24 gp

  20. Slide 20: Conclusion

    Conclusion TSX.V: ROG 2014: Continuing Development Detailed Engineering – Q2 2014 Project Financing – Q2/Q3 2014 Finalize Permitting – Q3 2014 Regional Exploration – Ongoing Underground Development – Q4 2014 www.roxgold.com 20

  21. Slide 21: Q&A

    TSX.V: ROG Q&A www.roxgold.com

  22. Slide 22: Resource Estimate

    Resource Estimate TSX.V: ROG Effective Date: April 22, 2014 Yaramoko Probable Mineral Reserve Cut –off Reserve Grade (capped) Metal Category Tonnes Au g/t Au Oz Crown Pillar 98,000 23.46 74,000 >5.0g/t Development 440,000 11.75 166,000 Probable Stope 1,459,000 11.07 519,000 Total 1,996,000 11.83 759

  23. Slide 23: Mineral Resource Estimate Parameters And Method

    Mineral Resource Estimate Parameters And Method TSX.V: ROG • An outer wireframe representing the widest geological contacts was created from logging data and core photos • High grade sub domains were modelled within this with a shallow westerly plunge of about 28⁰. These were only modelled for the u