Roxgold — Technical Presentation (April 2014)
23 slides from Roxgold's technical presentation, April 2014
Slide 1: Yaramoko Gold Project Feasibility Study Conference Call
TSX-V: ROG Yaramoko Gold Project Feasibility Study Conference Call April 2014 www.roxgold.com
Slide 2: Cautionary Statement
Cautionary Statement TSX.V: ROG This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of inferred and indicated mineral resources and probable mineral reserves
Slide 3: Project Development Progression
Project Development Progression TSX.V: ROG Delivering on Key Milestones On Track for Continuing Project Development Goals Q3/Q4 2014 Q1/Q2 2014 - Permitting: ESIA & Mining Convention - Feasibility Study Delivered - Financing 2013 - Continuing Regional - Detailed Engineering - Preliminary Economi
Slide 4: Feasibility Study Economic Highlights
Feasibility Study Economic HighlightsTSX.V: ROG Pre – tax $1,100/oz $1,300/oz $1,500/oz NPV5% ($M) $201 $300 $406 IRR (%) 38.8% 53.7% 68.8% Payback (Years) 2.2 1.5 1.1 After – tax $1,100/oz $1,300/oz $1,500/oz 5% NPV ($M) $168 $250 $337 IRR (%) 35.2% 48.4% 61.5% Payback (Years) 2.4 1.6 1.2 After-Tax
Slide 5: Not All Ounces Are Created Equal
Not All Ounces Are Created Equal TSX.V: ROG Margin Cash Cost Summary LOM LOM $1,400 ($/oz) ($/tonne) $1,300 Mining $242 $86 $1,200 Processing $89 $32 $1,100 G&A $61 $22 $1,000 Margin: $710 Refining $10 $4 $900 $800 Cash operating Cost $402 $144 All-in Costs: Royalties $65 $23 $700 $590/oz $600 Total
Slide 6: All-in Sustaining Cash Cost Comparison
All-in Sustaining Cash Cost Comparison TSX.V: ROG All-in sustaining cash cost curve for African Gold Producers 2,000 Yaramoko Gold Project – lowest 5% of projects by cost in Africa 1,800 1,600 1,400 US$/oz 1,200 1,000 800 600 Roxgold 400 200 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Koz 2015E US$1
Slide 7: Highest Grade Undeveloped Deposit Worldwide
Highest Grade Undeveloped Deposit Worldwide TSX.V: ROG Top 20 Undeveloped Gold Deposits Worldwide by Grade (g/t Au)* g/t Au • Yaramoko ranks among the highest grade undeveloped gold deposits in the world with a resource 18 grading over 15 g/t Au in the indicated category 16 14 12 10 8 6 4 2 0 * Sour
Slide 8: Pre-Production Capital Costs
Pre-Production Capital Costs TSX.V: ROG Pre-Production Capex Low Pre-Production Capex $5.7M Tailings & Water Storage $1.8M First Fills Total Pre-Production Capital of $106.5 million $8.5M Owner’s Costs $30.7M Underground Development Capex Peer Comparison $8.7M Power Line $450 $400 $350 $8.7M $300
Slide 9: Production Metrics
Production Metrics TSX.V: ROG LOM Average mine production (tpd) 750 Average annual gold production (oz) 99,500 Average mill feed grade (g/t) 11.59 Tonnes Processed (Mt) 2.036 Average gold recoveries (% Au) 96.9 Total Gold Recovered (oz) 735,430 Life of Mine Production & Grade Profile 140,000 16 120,
Slide 10: Mining Philosophy
Mining Philosophy TSX.V: ROG Extraction to be completed with long hole retreat mining with cemented waste rock backfill Dual declines, minimizing footwall development allows for access to multiple mining faces at all times. Provides secondary egress for large part of mine Allows for efficient
Slide 11: Mineral Reserves
Mineral Reserves TSX.V: ROG Effective April 22, 2014 Ore Type Probable Mineral Reserves Tonnes Au (g/t) Au Oz Crown Pillar 98,000 23.46 74,000 Development 440,000 11.75 166,000 Stope 1,459,000 11.07 519,000 Total/Avg. 1,996,000 11.83 759,000 • The mineral reserves calculation for the feasibility stu
Slide 12: Simplified Flow Sheet
Simplified Flow Sheet TSX.V: ROG Excellent Metallurgy 33.75 tph @ Throughput 91% Ave ROM Pad Crushing Circuit SAG Mill Grind Size (P80) 90 micron Gravity Concentration Design Bond Ball 17.5 kWh/t Work Index CIL Testwork (Carbon In Leach) Range: 55 - Gravity Gold ICC Recovery 90% (Intensive Cyanidati
Slide 13: Power Supply
Power Supply TSX.V: ROG Significant opportunity to improve operating costs through the integration of reliable grid power Opportunity is driven by 17.1c/kWhr vs 45c/kWhr differential between diesel and government gazetted grid tariff Cost savings over diesel-generated electricity are estimated
Slide 14: Opportunities & Impacts
Opportunities & Impacts TSX.V: ROG OPPORTUNITY IDENTIFIED IN PEA IMPACTS • A geotechnical study with results to feed into Achieved, significant reduction in footwall an optimized mine plan including reductions in development via incorporation of twin footwall and lateral development decline • Deta
Slide 15: Opportunities for Further Optimization
Opportunities for Further Optimization TSX.V: ROG Paste Backfill: • The use of paste backfill versus cemented rock backfill • Patterson and Cooke in Ontario, Canada are currently conducting a study to evaluate the use of this strategy. • Potential benefits include reduced overall costs due to lower
Slide 16: Resource Estimate
Resource Estimate TSX.V: ROG Effective April 22, 2014 Grade Cut -off Resource(1) Metal (capped) Category Tonnes Au g/t Au Oz >5.0g/t Indicated 1,600,000 15.80 810,000 Inferred 840,000 10.26 278,000 • This resource was based on a wireframe that was constructed to account for the entire width of the s
Slide 17: 55 Zone Long Section – Open for Expansion
55 Zone Long Section – Open for Expansion TSX.V: ROG www.roxgold.com
Slide 18: Regional Exploration
Regional Exploration TSX.V: ROG Regional Exploration Upside: $5 million budgeted towards regional exploration in 2014 Targets: Bagassi South Haho 109 Zone Boni Shear Niankongo • Three drill rigs currently exploring at Yaramoko www.roxgold.com 18
Slide 19: Bagassi South
Bagassi South TSX.V: ROG Bagassi South: • Primary Target for H1 exploration • Multiple high grade intersections over a strike length approaching 300m and down to 200 vertical metres • Recent highlights include: 19.94 gpt gold over 3.7m including 43.7 gpt over 1.7m in hole YRM- 14-BG-037 16.24 gp
Slide 20: Conclusion
Conclusion TSX.V: ROG 2014: Continuing Development Detailed Engineering – Q2 2014 Project Financing – Q2/Q3 2014 Finalize Permitting – Q3 2014 Regional Exploration – Ongoing Underground Development – Q4 2014 www.roxgold.com 20
Slide 21: Q&A
TSX.V: ROG Q&A www.roxgold.com
Slide 22: Resource Estimate
Resource Estimate TSX.V: ROG Effective Date: April 22, 2014 Yaramoko Probable Mineral Reserve Cut –off Reserve Grade (capped) Metal Category Tonnes Au g/t Au Oz Crown Pillar 98,000 23.46 74,000 >5.0g/t Development 440,000 11.75 166,000 Probable Stope 1,459,000 11.07 519,000 Total 1,996,000 11.83 759
Slide 23: Mineral Resource Estimate Parameters And Method
Mineral Resource Estimate Parameters And Method TSX.V: ROG • An outer wireframe representing the widest geological contacts was created from logging data and core photos • High grade sub domains were modelled within this with a shallow westerly plunge of about 28⁰. These were only modelled for the u