Vault Minerals Limited · ASX:VAU

Vault Minerals — Red 5 — Sydney Mining Club (June 2009)

32 slides from Vault Minerals's conference presentation, Jun 5, 2009

  1. Slide 1: Siana Gold Project - Philippines

    For personal use only RED 5 Limited Siana Gold Project - Philippines Sydney Mining Club 4 June 2009 Lance Govey – Executive Director Technical RED5 Limited

  2. Slide 2: Red 5 - at a glance

    Red 5 - at a glance…. For personal use only RED – ASX (01 June): 8.8 cents Market Cap (01 June): $58.0m Issued Shares: 659.2m Cash at 31 Mar 09: A$23.9m Enterprise value A$34 (per Resource oz) Largest Shareholders: Mathews Capital 19.5% AngloGold Ashanti 10.2% R Stanley 8.0% RED5 Limited

  3. Slide 3: Highly prospective location

    Highly prospective location For personal use only ƒ 100 million oz equivalent potential in Surigao del Norte ƒ Excellent local infrastructure ƒ Strong Community support (history of mining) ƒ Strategic land position ƒ Secure form of mining title (Mineral Production Sharing Agreement) ƒ Red 5 in Phili

  4. Slide 4: Momentum increase

    Momentum increase… For personal use only Last 3 months: ƒ Reserves doubled with underground resource upgrade ƒ Positive feasibility study complete, Board review in progress ƒ Environmental Compliance Certificate issued ƒ Mapawa MPSA granted – satellite Resource potential … business de-risked RED5 Li

  5. Slide 5: Probable Ore Reserves

    Probable Ore Reserves For personal use only Stockpile Open Pit Underground Total* Tonnes 0.08 3.1 1.94 5.1 Au g/t 1.33 3.42 5.82 4.3 Ag g/t 10.67 8.71 9.08 8.9 Ounces Au 3,549 341,000 363,000 708,000 Ounces Ag 28,000 870,000 566,000 1,465,000 *contains minor rounding errors ƒ 88 diamond drillholes f

  6. Slide 6: Long term mine plan

    Long term mine plan For personal use only Stockpile Open Pit Underground Total (Long term mine plan) Tonnes 0.08 3.10 3.36 6.55 Au g/t 1.33 3.42 5.83 4.6 Ag g/t 10.67 8.71 9.12 8.9 Ounces Au 3,549 341,000 630,000 975,000 Ounces Ag 28,000 870,000 986,000 1,885,000 RED5 Limited

  7. Slide 7: Resource still open

    Resource still open… For personal use only RED5 Limited

  8. Slide 8: Feasibility study update

    Feasibility study update… For personal use only ƒ Plant and infrastructure costs updated ƒ Open pit design and costs updated ƒ In country contractors/suppliers used where possible ƒ Modified waste dump design ƒ Tailings dam detailed design ƒ Underground mine design completed - drill and blast and ro

  9. Slide 9: Consultants to the study

    Consultants to the study… For personal use only ƒ Resource estimation - Hellman & Schofield, Cube Consulting, Perth ƒ Geotechnical - Mining One, Melb, Peter O’Bryan & Associates, Perth ƒ Hydrology - Meyer Water & Environmental Solutions, Perth ƒ Open Pit mine design - RSG Global (Coffey Mining), Per

  10. Slide 10: Site layout

    Site layout For personal use only RED5 Limited

  11. Slide 11: Project financials (pre-tax)

    Project financials (pre-tax) For personal use only Base case: ƒ 750,000 tpa ƒ Gold US$800/oz Silver US$10/oz ƒ NPV > US$ 100 million ƒ IRR > 30% RED5 Limited

  12. Slide 12: Costs

    Costs For personal use only CAPEX ƒ Cost to first gold reduced from September 2008 estimate (US$73 million) with decreased steel prices, fuel and EPCM costs ƒ March 2009 estimate similar but now includes working capital (US$10 million) OPEX ƒ Life of mine US$350 per ounce cash cost RED5 Limited

  13. Slide 13: Gold recovery

    Gold recovery For personal use only Gravity and CIL leach: • open pit - 85 %, 1.2 kg/t CN • underground LZN - 88 %, 2.2 kg/t CN • underground HZN - 84 %, 2.4 kg/t CN Gravity, Zn flotation, cons and tail leach: • underground HZN – 83.4 %, 2.45 kg/t CN RED5 Limited

  14. Slide 14: Underground mining

    Underground mining For personal use only ƒ Underhand cut and fill (top down) ƒ Road header in ore (more productive in soft ground than conventional drill and blast, with additional benefit of less explosive on site) ƒ Drill and blast for hard material ƒ Paste fill ground support RED5 Limited

  15. Slide 15: Why underhand cut and fill?

    Why underhand cut and fill? For personal use only ƒ Safe workplace for entry style mining ƒ High mining recoveries ƒ Low dilution ƒ Independent of rock break technique RED5 Limited

  16. Slide 16: Underhand cut and fill

    Underhand cut and fill For personal use only RED5 Limited

  17. Slide 17: Underground design parameters

    Underground design parameters For personal use only ƒ Access via a 5m by 5m, 1:7 decline in porphyry and basalt units ƒ Portal located 90 metres above final pit floor ƒ 50 tonne trucks ƒ Level spacing 40m (ramps 20m up 20m down) RED5 Limited

  18. Slide 18: Underground design

    Underground design For personal use only RED5 Limited

  19. Slide 19: Requirements to operate

    Requirements to operate… For personal use only ƒ Environmental Compliance Certificate granted ƒ Feasibility study under review by MGB In preparation: ƒ SDMP – Social Development Management Plan ƒ EPEP – Environmental Protection and Enhancement Programme ƒ FMRDP – Final rehab and decommissioning plan

  20. Slide 20: Strong community support

    Strong community support… For personal use only Clean water project RED5 Limited

  21. Slide 21: ...through health assistance

    ...through health assistance For personal use only RED5 Limited

  22. Slide 22: … welfare

    … welfare For personal use only RED5 Limited

  23. Slide 23: … education programmes

    … education programmes For personal use only RED5 Limited

  24. Slide 24: …and agricultural assistance

    …and agricultural assistance For personal use only RED5 Limited

  25. Slide 25: Implementation

    Implementation For personal use only ƒ Permitting and finance 3rd Qtr 2009 ƒ Plant construction commences 4th Qtr 2009 ƒ Open pit commences 1st Qtr 2010 ƒ First gold production Dec 2010 ƒ Underground portal commences 1st Qtr 2013 ƒ Underground ore production 3rd Qtr 2013 RED5 Limited

  26. Slide 26: Opportunities

    Opportunities For personal use only ƒ Further underground extensions - 3m at 31.6 g/t, 5m at 25.4 g/t Au ƒ Mapawa satellite ore - 3-4 Mt potential ƒ Zinc concentrate production - bi-product credit potential RED5 Limited

  27. Slide 27: MAPAWA Gold Project

    MAPAWA Gold Project For personal use only ƒ Exciting milestone achieved with approval and registration of MPSA 280-2009-XIII ƒ Located 30 km north of Siana ƒ 1,482 hectares, highly prospective for gold and potentially, base metals ƒ Strengthened regional gold exploration portfolio ƒ Gold intersected

  28. Slide 28: LSY prospect

    LSY prospect For personal use only RED5 Limited

  29. Slide 29: Summary

    Summary For personal use only ƒ Technically and economically viable project ƒ 10 year operating life delivering 850,000 recovered ounces of low cost production ƒ Upside with Mapawa licence grant ƒ Community acceptance and environmentally benign ƒ Knowledgeable supportive shareholder base ƒ Financing

  30. Slide 30: Market comparison

    Market comparison For personal use only Source: BGF Equities RED5 Limited

  31. Slide 31: Contact details

    Contact details For personal use only ƒ Level 2, 35 Ventnor Avenue ƒ West Perth, Western Australia 6005 ƒ PO Box 1911 West Perth, WA 6872 ƒ Ph: + 61 8 9322 4455 ƒ Fax: + 61 8 9481 5950 ƒ Web Site: www.red5limited.com ƒ Email: info@red5limited.com RED5 Limited

  32. Slide 32: Competent persons

    Competent persons For personal use only The information in this Public Report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on, and accurately reflects, information compiled by Mr G C Edwards, Mr A L Govey and Mr W Darcey who are full-time employees of Red 5 Limited