Ranchero Gold Corp · TSXV:RNCH
Ranchero Gold — Investor Presentation (January 2022)
31 slides from Ranchero Gold's investor presentation, January 2022

Slide 1: Corporate Presentation — January 2022
TSX-V: RNCH CORPORATE PRESENTATION — JANUARY 2022 lar

Slide 2: Disclaimers
g & ze & 3 2 4 CORPORATE PRSENTATION DISCLAIMERS All amounts in C$ unless otherwise noted Forward Looking Statements: Th peserton hos been prepared by he Compary oe or femationpupoes Pospecive neo houd pay prior terion the nfmaton unde he heading oswatdocking denen’ and he fomaion coined in Append A

Slide 3: Ranchero Gold Corp.
RANCHERO GOLD CORP. Newly Modern day established TSX-V historical listed gold production of explorer ~3.0 Moz

Slide 4: Investment Highlights
INVESTMENT HIGHLIGHTS 9 N BA Gra Z Le Largest Neighbors with Key infrastructure Surface rights | Opportunity to unexplored claim Senior and already in place for exploration © participate at the blocks in a Intermediate | and production S ground floor level prolific gold Gold Producers finalized dist

Slide 5: Developing World-Class Gold Belt
DEVELOPING WORLD-CLASS GOLD BELT Ranchero is focused on a highly prospective and fast growing subsection of the belt > Sierra Madre Occidental Gold Belt - A prolific gold belt with 35 major mining operations with past production with 80 Moz gold and 2 Boz silver! > Mexico — Located in the pro-mining

Slide 6: Santa Daniela
TSX-V: RNCH g & ze & 3 2 4 CORPORATE PRSENTATION SANTA DANIELA 22,267 hectare property | 100% ownership oe? ae ‘Agnico Eagle inc. Concessions I Miora Alamos Co. (J Otter mining Concessions: “FE Prncipl Mines in Pratucion “a. Bohraion Pots InAdvence Sie a Teget aie Anu o 5 0 2 — hen Sobrces En HERE,

Slide 7: Key Infrastructure Already in Place
= 5 z fas CORPORATE PRSENTATION KEY INFRASTRUCTURE ALREADY IN PLACE Substantially lowers capital intensity of Santa Daniela Road Access Water Power Water rights for two Existing power line Direct access to million cubic meters runs through Santa Daniela from per year acquired reduces future Hermosil

Slide 8: Well Defined Path to Producer Status
WELL DEFINED PATH TO PRODUCER STATUS Significant value creation opportunity through project development Production Decision Project Economics Resource Definition z Systematic Drilling z Exploration z of Santa Daniela 47 high priority exploration Progress to producti targets establish partnershi

Slide 9: Fostering a safety culture free of accidents
g§ & z < Ss Zz < CORPORATE PRSENTATION Fostering a safety culture free of accidents Emergency Response Plan in place Workplace risk assessments per job category Continual review to assess safety conditions Drug and Alcohol Policy Health and Safety Policy COVID-19 PROTOCOLS - Successfully completed m

Slide 10: Systematic Exploration Program
& < 3 s 10 Historical Work > 17,000m of CSAMT Survey completed only on eastern claim block > Induced Polarization Survey at Mesas Coloradas > Ground Magnetometry Survey completed at Maiz Azul > Limited drilling completed by previous operators > 3,800m on three prospects Gg Lie > Machin Reconnaissanc

Slide 11: Drilling at Santa Daniela
g & ze & 3 2 4 CORPORATE PRSENTATION 11 DRILLING AT SANTA DANIELA Highlights exploration potential at Maiz Azul > Well understood Low Sulphidation Epithermal System > La Colmena Zone > 350m x 75m where historic drilling intercepted up to 1.56 g/t Au over 37m > La Cascada Zone > largest zone at 650m

Slide 12: Maiz Azul Three Principal Targets
PRSENTATION CORPORA\ 12 Maiz Azul Three Principal Targets e t Phase1: Initial drilling at Maiz Azul (3,000m) Phase 2: Data compilation & review/ New target definition Phase 3: Expansion and resource definition drilling

Slide 13: Three Principal Targets
x= 3 z x % @ Three Projected Mineralization Proposed Drill Hole

Slide 14: Maiz Azul - La Colmena
MAIZ AZUL - LA COMENA = is] z a 2 PHASE 1 DRILLING Q1 2022 results include > MA2I1-010: Results Pending > MA2I1-011: Results Pending X Structure La Cascada La Colmena z < Zz sete LEGEND @ Projected 7 100m Mineralization il — @ Proposed Drill | | Hole 4h £ i i—_ 14

Slide 15: Maiz Azul - La Cascada
MAIZ AZUL - LA CASADA = is] z a 2 PHASE 1 DRILLING Q1 2022 results include: > MA2I1-017-21: Results Pending X Structure La Cascada La Colmena 4 =z 3 i isi - ii H H # E < ~ ) coe — oval = Deca = 7 a S —— 7 ory Aneste LEGEND \ won ¥ @ Projected 100m X Mineralization = MA21-017 @ Proposed Drill foot :

Slide 16: Maiz Azul - X Structure
MAIZ AZUL - X STRUCTURE = is] z a 2 FUTURE DRILLING Follow up drill program: >» MA22-XS: Results expected in H2 2022 X Structure La Cascada La Colmena 4 2 x : i i i NE i 3 : i _ 3 oom + = = g PAN oS oom, “4 coon i il oma 1 ~s TEGEND xesmuorne || < @ Projected 100m | Mineralization om MA223 @ Propose

Slide 17: High Priority Targets
CORPORATE PRSENTATION 17 HIGH PRIORITY TARGETS Largely unexplored land package outside of Maiz Azul > Analysis of ASTER and Landsat Imagery > 47 additional exploration targets identified > Targets based on evidence of hydrothermal alteration and structural patterns > Follow-up field visits underway

Slide 18: Nearby Gold Resources
1.83Moz 1.14Moz 1.23Moz (Inferred) 0.89Moz (M&I) (M&I) (M&I) Including 1.09Moz Including Including 0.80Moz 0.38Moz (Inferred) 0.41Moz 0.19Moz (Inferred) (P&P) (P&P) (P&P) 18

Slide 19: Simple flowsheet with low capital intensity
TSX-V: RNCH x 8 s & ze & 3 Z 4 CORPORATE PRSENTATION 19 at aw et Simple flowsheet with low capital intensity Mulatos gold mine (Alamos Gold) 150,000 oz/year under a 16,500 tpd mining rate La India gold mine (Agnico Eagle) 85,000 oz/year under a 20,000 tpd mining rate Dolores gold/silver mine (Pan Am

Slide 20: Upcoming Catalysts
TSX-V: RNCH g s & ze & 3 Z 4 CORPORATE PRSENTATION 20 UPCOMING CATALYSTS Strong pipeline of projects and catalysts Completion of RTO and list on TSX-V Planning of inaugural exploration program Commencement of 3,000m drill program Drill results from Santa Daniela in Q1 Prioritization of additional dr

Slide 21: Management
TSX-V: RNCH CORPORATE PRSENTATION 21 MANAGEMENT BILL PINCUS CHIEF EXECUTIVE OFFICER 40+ years in the mining industry Experienced geologist with seven significant discoveries globally Founder, CEO, and Director of Esperanza Resources (acquired by Alamos Gold) Fluent in Spanish BRIAN SZETO PRESIDENT 2

Slide 22: Board of Directors
BOARD OF DIRECTORS TSX-V: RNCH x 8 s & ze & 3 Z 4 <> GUSTAVO MARTYN BILL PINCUS STEVE BRIAN SZETO Zz re) 2 MAZON BUTTENSHAW DIRECTOR RISTORCELLI DIRECTOR Z CHAIRMAN OF THE BOARD DIRECTOR DIRECTOR 2 > 40+ years in the mining > 20+ years in the mining g > Founder of Ranchero ; industry > /ercomtanten!

Slide 23: Capital Structure & Ownership
= is] z a 2 CORPORATE PRSENTATION 23 CAPITAL STRUCTURE & OWNERSHIP CAPITAL STUCTURE (AS AT DECEMBER 31, 2021) TSX VENTURE EXCHANGE SGI Shares outstanding 65,7 million Options! 0.3 million Warrants Nil PSUs/RSUs/DSUs Nil Fully diluted shares 66.0 million Market Capitalization? $18 million KEY SHAREHO

Slide 24: Substantial Value Proposition
SUBSTANTIAL VALUE PROPOSITION Re-rating opportunity on the horizon x 8 & ze & 2 Market SM z arke Cap $1,190 z Q < zZ 2 s 2 8 $277 $006 $200 $168 $128 59 Ranchero: $ sol $44 $18 Orla liberty Minera Gold Integra Freegold = West Vault —_ Elevation Revival Ranchero Standard Mining Gold 24

Slide 25: Revaluation Opportunity
= 5 z fas CORPORATE PRSENTATION 25 REVALUATION OPPORTUNITY” ~* Significant rerating opportunity as the Company transitions to a Producer 500 Consensus Estimate NAV of Mulatos $600M ($9.13/sh) 400 300 200 Acquisition of Grayd Resource $275 M 100 ‘ $18M Revaluation ($4.19/sh) 5 secon Opportunity as pp

Slide 26: Ranchero By The Numbers
TSX-V: RNCH g & ze & 3 2 4 CORPORATE PRSENTATION 26 RANCHERO BY THE NUMBERS””’* The Team, the Neighborhood, the Opportunity | | 175 Years 10+ Moz Board & Management experience ("Yl 490, 000 oz/yr 2 Annual production from region 7.3 Gold Resources 91 oz Moz In nearby concessions Notes: 1} Company Rep

Slide 27: Appendices
> APPENDICES “

Slide 28: ESG & Diversity
x 8 s & ze & 3 Z 4 CORPORATE PRSENTATION 28 ESG & DIVERSITY Committed to the Environment and our Communities whilst fostering best practices in Corporate Governance and Diversity Social Governance Diversity Establish best environmental practices for drillers > Long-term surface-rights agreement with

Slide 29: Santa Daniela Project Timeline
g & ze & 3 2 4 Grupo Mulatos de Sonora conducts reconnaissance work Id mineralization Cabarete at Santa Daniela discovered by the Spaniards Zz Q < a Artisanal mining took 2 Mazon Family & place throughout Santa aneent 2 Daniela acquires Santa & ' Daniela 2 5 g Source: Technical Report and Company Re

Slide 30: Information Regarding Scientific and Technical Information
30 INFORMATION REGARDING SCIENTIFIC AND TECHNICAL INFORMATION + The scientific and technical information included in this document has been reviewed and approved by William ‘Bill’ Pincus, a “qualified person” within the meaning of NI 43-101. Mr. Pincusis not independent of the Corporation within the

Slide 31: Ranchero Gold Corp. contact
TSX-V: RNCH JANUARY 2022 Ranchero Gold Corp. 910-800 West Pender Street Vancouver, British Columbia V6C 2V6 z Q < a 2 = 2 5 3) Email: info@rancherogold.com
Source: Internet Archive copy of rancherogold.com


