Totalenergies Se · EURONEXT:TTE

Totalenergies — Total — Investor Day (September 2014)

37 slides from Totalenergies's investor day presentation, September 2014

  1. Slide 1: Outlook & objectives

    2014 Outlook & objectives September 2014 2014 Outlook & objectives – total.com 1

  2. Slide 2: Market environment

    Market environment ZONE D’IMAGE 2014 Outlook & objectives – total.com 2

  3. Slide 3: Evolving energy mix

    Evolving energy mix Energy mix Mboe/d +21% 3% Hydro 5% Solar, wind, other Growing long term demand 300 10% Biomass led by emerging countries 6% Nuclear 22% Coal Diversified energy mix 200 • Oil to remain primary energy source • Gas to replace coal as 2nd energy source 25% Natural gas • Rapid growth

  4. Slide 4: Industry challenge to satisfy oil demand

    Industry challenge to satisfy oil demand Oil supply-demand Mb/d Oil demand Continued long term growth in oil +0.6% demand, despite increased energy CAGR efficiency Marginal supply requires high technology, continuous innovation North and significant investment America Decline ~50 Mb/d of Geopolitica

  5. Slide 5: Strong growth in LNG demand

    Strong growth in LNG demand LNG supply-demand Mt/y LNG demand +5% Demand mainly driven by Asian growth CAGR 500 Potential RoW Need to double current supply by 2030 projects Russia Africa 40% of potential projects in new LNG North America producing countries Sanctioned 250 Attractive long term pricin

  6. Slide 6: Challenging cost environment

    Challenging cost environment Rising costs UCCI and UOCI* Brent Inflation lower but current cost levels Base 100 in 2000 $/b unsustainable Capital discipline and project selectivity critical Systematic response from Total • Disciplined capital allocation • Controlling Capex • Opex reduction program 2

  7. Slide 7: Outlook

    Outlook ZONE D’IMAGE 2014 Outlook & objectives – total.com 7

  8. Slide 8: Safety, a core value

    Safety, a core value Improving safety performance while increasing activity 530 Million man-hours 450 1.6 TRIR 0.9 LTIR Significant and steady decrease in injury rates • 2013 TRIR: -57% vs 2008 • 2013 LTIR: -56% vs 2008 Shared safety standard for employees and contractors Priority to safety not comp

  9. Slide 9: Improving environmental performance

    Improving environmental performance Energy efficiency Annual improvement target of 1.5% Continuous flaring Discharges to water Mm3/d kt, onshore and coastal 15 0.4 2013 2013 2005 2014 target 2011 2017 target Close to achieving target On track to reduce discharges to reduce flaring by 50% to water by

  10. Slide 10: Prioritizing cash flow generation

    Prioritizing cash flow generation Free cash flow* B$ Transitioning from intensive investment to cash flow generation 15 Growing cash flow from operations Upstream • Cash accretive Upstream start-ups net growth 10 • Increased contribution from Downstream, Downstream in a weaker European environment r

  11. Slide 11: Transforming Total's profile by 2017

    Transforming Total’s profile by 2017 Upstream share of Production growth capital employed Mboe/d 80% 2017 2.8 2017 On course in all segments to change 2007 2007 the Group’s profile by 2017 • Upstream start-ups driving growth in cash flow • R&C restructuring to improve profitability R&C European M&S

  12. Slide 12: Upstream

    Upstream ZONE D’IMAGE 2014 Outlook & objectives – total.com 12

  13. Slide 13: Committed to stronger performance in Upstream

    Committed to stronger performance in Upstream Capital discipline Project execution Cost reduction • Strict selection criteria • Delivering projects • Retaining top-tier position for new projects on-time and on-budget in technical costs • Portfolio management • Growing production • Reducing Opex and

  14. Slide 14: Creating value through capital discipline

    Creating value through capital discipline Leveraging Kaombo experience for future projects 20 B$ Promoting “good enough” designs 0.75 B$ 16 B$ Optimizing contractual strategy 0.5 B$ From local content to in-country value Sanctioning projects at 100 $/b and assessing short plateau projects at 80 $/b

  15. Slide 15: Strong project management track record

    Strong project management track record Schedule and budget performance from sanction to start-up for Total operated projects* % variation Budget Industry facing delays and cost overruns Implementing solutions to retain competitiveness 10% Average Usan Akpo • Minimize change orders post-sanction CLOV

  16. Slide 16: Reducing Opex in a leaner Upstream

    Reducing Opex in a leaner Upstream 2015-17 Upstream Opex reduction Contribution to operating results M$ 800 Other Major bottom-up efforts from all affiliates Supply chain 75% from top-5 affiliates Technical 400 15% cost reduction on operated assets Contribution starting 2015 Structure costs Designed

  17. Slide 17: Building on a new wave of start-ups

    Building on a new wave of start-ups Laggan- Offshore installations and pipelines complete Status of major projects contributing to 2017 production Tormore Upside from Edradour and Glenlivet 2014-17 start-ups, % EPC progress Start-up CLOV 12 June 2014 Ofon 2 4Q 2014 Laggan-Tormore 1Q 2015 Eldfisk 2 1

  18. Slide 18: New project start-ups fueling cash flow growth

    New project start-ups fueling cash flow growth Production Adding 0.6 Mboe/d of cash accretive ~2.8 production from 2014-17 start-ups Mboe/d • ~50 $/boe cash flow from operations 2.3 • 2/3 Total-operated projects 2.1 Mboe/d Start-ups Mboe/d 0.6 Mboe/d • 1/3 deep offshore projects Revised forecast imp

  19. Slide 19: Deep offshore and LNG at the core of Upstream

    Deep offshore and LNG at the core of Upstream Industry leader in deep offshore Robust global LNG position IRR* 25 years Peak production (kb/d) Net cash flow (B$) • 10% of Total’s production, • 20% of Total’s production, >25% of 2013 Upstream results >25% of 2013 Upstream results • High tech and high

  20. Slide 20: Completing 2012-14 exploration program

    Completing 2012-14 exploration program Main ongoing wells Key 2015 wells 2014-15 unconventional wells Russia South Tambey Qatar Block BC Ivory Coast San Pedro Angola Kwanza Brazil Libra Argentina South Africa Vaca Muerta Block 11B/12B Defining new road map for post 2014 2014 Outlook & objectives – t

  21. Slide 21: Major contributors to post 2017 production

    Major contributors to post 2017 production Long plateau project Deep offshore Yamal LNG Fort Hills 450 kboe/d (20%) 180 kb/d (39.2%) Utica 400 kboe/d (25%) Kashagan Ph 1 Surmont* 370 kb/d (16.8%) 255 kb/d (50%) Egina 200 kb/d (24%) Uganda* Elk-Antelope* 230 kb/d (33.3%) 150 kboe/d (31.1%) Libra* 1,4

  22. Slide 22: Downstream

    Downstream ZONE D’IMAGE 2014 Outlook & objectives – total.com 22

  23. Slide 23: Redeploying Refining & Chemicals capital

    Redeploying Refining & Chemicals capital Refining & Petrochemicals capital employed Lowered European breakeven point B$ thanks to synergies and efficiency programs • ERMI scenario revised to 25 $/t 15 Ongoing reduction of European exposure Asia, • 2011-14 capital employed reduced by 30% Middle East

  24. Slide 24: Delivering profitability target as planned

    Delivering profitability target as planned Synergies Efficiencies 12% with +2.5% 13% ERMI 25 $/t Portfolio changes +2.5% 11.5% target 2014 Major projects Specialty on main chemicals 10% in 2013 platforms +0.5% +1.5% 6% Port Arthur Cepsa Normandy Dunkirk 400 M$ Qatar Resins in 2014 out Satorp Fertili

  25. Slide 25: Creating value in Marketing & Services

    Creating value in Marketing & Services M&S share of capital employed in growth areas excl. New Energies 70% Investing to expand and rebalance M&S • Organic Capex peaking in 2014 • Repositioning toward growth areas and adapting in Europe 2012 2013 2017 Growing while generating high profitability • Ta

  26. Slide 26: Corporate

    Corporate ZONE D’IMAGE 2014 Outlook & objectives – total.com 26

  27. Slide 27: Capex control and capital efficiency

    Capex control and capital efficiency Group organic Capex Transitioning out of an intensive 28 B$ investment phase 26 B$ 25 B$ 24 B$ Under Optimizing Capex to meet strict study investment criteria Producing and Better capital allocation through sanctioned asset sales and cancelled projects Downstream

  28. Slide 28: 2 B$ Opex savings by 2017

    2 B$ Opex savings by 2017 2015-17 Opex reduction Contribution to operating results and cash 2 B$ Corporate M&S 1.4 B$ Necessary initiative in all segments R&C Quick wins yielding 40% of total savings starting 2015 Upstream Opex savings of 4 B$ cumulative over 3 years 2015 2016 2017 Operating results

  29. Slide 29: Reshaping portfolio and unlocking value

    Reshaping portfolio and unlocking value 2010-to-date asset sales Simplifying portfolio High-grading portfolio embedded into Group strategy Monetizing non-core Adapting assets Successfully implementing asset sales downstream • Strong valuation track record Other • 16 B$ since 2012, well within 2012-1

  30. Slide 30: Strong balance sheet maintained through intensive investment period

    Strong balance sheet maintained through intensive investment period Strong balance sheet Share of non-producing assets B$ in total capital employed Net debt 50% 25% Equity Gearing 23% 22% 23% 27% 2007 2010 2014 2017 2011 2012 2013 June 2014 20-30% target range for gearing Non-producing capital emplo

  31. Slide 31: Committed to competitive shareholder return

    Committed to competitive shareholder return Competitive track record for increasing dividend €/share 2.38 Dividend doubled over the past 10 years x2 Steady dividend increase through Brent and investment cycles 1.18 Dividend policy 50% average payout ratio Buying shares to mitigate dilution from empl

  32. Slide 32: Conclusion

    Conclusion ZONE D’IMAGE 2014 Outlook & objectives – total.com 32

  33. Slide 33: Staying the course to transform Total

    Staying the course to transform Total Safety, a core value Addressing macroeconomic changes and a challenging geopolitical context Implementing our strategy • Growing Upstream and improving efficiency • Strengthening R&C profitability • Expanding and rebalancing M&S Creating value through capital di

  34. Slide 34: Appendix

    Appendix ZONE D’IMAGE 2014 Outlook & objectives – total.com 34

  35. Slide 35: Six major platforms shaping the future of R&C

    Six major platforms shaping the future of R&C Port Arthur Daesan • 90% ethane and LPG • New condensate cracked in 2014 splitter and aromatic • Connected to domestic units started-up ahead supply infrastructure of schedule (July 2014) • Ethane cracker project Normandy Antwerp Satorp Qatar • Moderniza

  36. Slide 36: Portfolio of major projects

    Portfolio of major projects Capacity Production Project Country Project (kboe/d) Share Op Status 2014 CLOV Angola Deep offshore 160 40%  Prod. Ofon 2 Nigeria Liquids/gas 70 40%  Dev. West Franklin Ph.2 UK Gas/cond. 40 46.2%  Dev. Laggan-Tormore UK Deep offshore 90 80%  Dev. Eldfisk 2 Norway Liqu

  37. Slide 37: Disclaimer

    Disclaimer This document may contain forward-looking information on the Group (including (ii) Inventory valuation effect objectives and trends), as well as forward-looking statements within the meaning of the The adjusted results of the Refining & Chemicals and Marketing & Services segments Private

Total — Investor Day (September 2014) on 6ix