    Exhibit 99.1 NYSE: TBN, ASX: TBN FY24 Result Presentation Joel Riddle – Managing Director and Chief Executive Officer September 20, 2024 SHENANDOAH SOUTH 2 WELLPAD, NORTHERN TERRITORY, AUSTRALIA

  2. Slide 2: Disclaimer

    Disclaimer The information in this presentation includes “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), which include statements

  3. Slide 3: FY24 highlights

    Tamboran Resources Corporation (NYSE: TBN, ASX: TBN) FY24 highlights Achieved the highest normalized flow Signed a 15.5-year Binding Gas Sales 1 rates from the Beetaloo Basin to date Agreement with the Northern Territory 1 4 from the Shenandoah South 1H (SS-1H) Government for proposed SS Pilot Proje

  4. Slide 4: Australian East Coast gas market on track for potential shortfalls

    Australian East Coast gas market on track for potential shortfalls Gas remains important for Australia’s energy independence | Prices >280% Henry Hub pricing ACCC East Coast gas supply/demand forecast − Using forecast production from producers, the recent ACCC 3 (including Domestic & LNG SPAs via Gl

  5. Slide 5: Tamboran's proposed Beetaloo Basin development strategy

    Tamboran’s proposed Beetaloo Basin development strategy 1 Aspiration to grow Beetaloo Basin gas production to 2 Bcf/d (gross) as early as 2030 to supply NT, East Coast and Asia Pacific markets Phase 4 – NTLNG (2035+) Potential additional volumes to NTLNG 2 Bcf/d (~780 MMcf/d net TBN) Phase 3 – NTLNG

  6. Slide 6: Strategic Partnerships in place to accelerate Beetaloo and LNG development

    Tamboran’s Strategic Partnerships in place to accelerate large scale Beetaloo and LNG development Delivering on commitment to import US technology and build additional pipelines into the Beetaloo Basin (7.2% TBN shareholder) (6.3% TBN shareholder) Strategic Drilling Partner Strategic Completions Par

  7. Slide 7: Shenandoah South 1H result materially derisked the Mid-Velkerri gas play

    Shenandoah South 1H result materially derisked the Mid-Velkerri gas play in the Beetaloo West area Geological rock properties at SS-1H compare favorably with those in the average Marcellus Shale dry gas window Shenandoah South 1H − SS-1H well logged ~480 ft of high quality, stacked Middle Velkerri s

  8. Slide 8: Proposed Shenandoah South Pilot Project

    Proposed Shenandoah South Pilot Project Targeting first gas from proposed ~40 MMcf/d (gross) Pilot Project in 1H 2026 − Proposed Pilot Project targeting six upfront horizontal wells drilled in 2024-25 to achieve ~40 MMcf/d (gross) plateau production, subject to funding, weather conditions and standa

  9. Slide 9: 2024 Beetaloo development activities underway

    2024 Beetaloo development activities underway SS-2H spudded in late August 2024 | On track for IP30 results in 1Q 2025 − Program is the largest single campaign in the Beetaloo Basin to date (distance drilled and stimulation stages) Sturt Plateau Compression − The SS-2H well spudded in late August 20

  10. Slide 10: "US-style" Completion Design enabled by new Liberty Energy Frac Spread

    “US-style” Completion Design enabled by new Liberty Energy Frac Spread Liberty Energy 80,000 HP frac fleet imported from US into Australia for dedicated Beetaloo large scale development − The first 80,000 hydraulic horsepower (HHP) frac spread equipment imported into Australia from Liberty Energy ar

  11. Slide 11: Proposed SS Pilot Project to further optimize "US-style" well design

    Proposed SS Pilot Project to further optimize “US-style” well design Incorporating learnings from SS-1H to further improve well performance and cost efficiency Shenandoah South 1H 10 stimulation stages over ~1,640 ft (164 ft spacing) Targeting ~5 mmscfd per 1,000-metre (3,280 feet) lateral IP90 flow

  12. Slide 12: Shenandoah South 1H IP90 performance vs. Marcellus Shale producers

    Shenandoah South 1H IP90 performance vs. Marcellus Shale producers Favorable IP90 comparison to average Marcellus Shale well performance Marcellus Basin (US) Average 12-Month Type Curve (By Marcellus Producers) − The average IP90 flow rate from the Mid Velkerri B Shale at SS-1H compares favorably wi

  13. Slide 13: SS-1H results high-grade ~1 million acres in deep Mid-Velkerri gas play

    1 SS-1H results high-grade ~1 million acres in deep Mid-Velkerri gas play in Beetaloo West area Proposed Pilot location selected due to attractive rock properties and close proximity to existing pipeline corridor Targeting development in deep Beetaloo West area: − ~1 million gross acres (~387,500 ac

  14. Slide 14: Phase 2/3: Multiple pathways to commercialize Beetaloo Basin gas

    Phase 2 / 3: Multiple pathways to commercialize Tamboran’s Beetaloo Basin gas Oversized new pipelines to provide new feed gas to East Coast Gas Market and Darwin LNG Market East Coast Domestic Gas Market Phase 2 Aggregate volume of 875 MMcf/d to offset projected 24-36” Open shortfalls in East Coast

  15. Slide 15: Tamboran's proposed NTLNG Project at Darwin

    Tamboran’s proposed NTLNG Project at Darwin Secured Middle Arm site to progress NTLNG | Targeting first fully integrated LNG development in onshore Northern Territory − Northern Territory Government awarded Tamboran ~420-acre (170-hectare) site at Darwin in May 2023 − Awarded pre-FEED studies to Bec

  16. Slide 16: Upcoming catalysts

    Upcoming catalysts Progressing towards production from proposed ~40 MMcf/d (gross, ~19 MMcf/d net) Pilot Project in 1H 2026 Complete drilling and stimulation activities, and 4Q 2024 commence flow testing of SS-2H and SS-3H Secure final stakeholder and regulatory approvals YE 2024 for proposed SS Pil