Pine Point Mining — Corporate Update (February 2025)
63 slides from Pine Point Mining's corporate update, Feb 10, 2025
Slide 1: Project History & Update Towards Developers Assessment Report (Interim)
Project History & Update Towards Developers Assessment Report (DAR) (Interim) February 10, 2025 www.pinepointmining.com 1
Slide 2: Overview
Overview 1. Introduction to the PPML Team 2. Zinc in Western Canada 3. History & Company Overview 4. Pine Point Project Update & Key Milestones 5. Geology 6. Mining 7. Infrastructure & Site Layout Design 8. Water Management Strategies 9. Tailings Management 10. Environmental, Social and Regulatory C
Slide 3: Zinc
Zinc Pine Point is a Zinc-Lead Mine Development Project that could potentially be a top ten global “Clean Zinc Concentrate” producer. Why is Zinc a critical mineral? Galvanization is the Cement production creates 8-9% of annual GHG main use for zinc … emissions globally! Zinc galvanization of rebar
Slide 4: History of Pine Point | Cominco era
3. History of Pine Point | Cominco era Pre-1885 First mineralization identified on surface during the Klondike Gold Rush 1898 First claims staked 1899 Area deemed too remote for Zinc and Lead to be mined economically 1925-1930 (Cominco) Early exploration drilling 5 deposits discovered Great Depressi
Slide 5: History of Pine Point | Cominco era and exploration
History of Pine Point | Cominco era and exploration Infrastructure 1961 Federal Government, Cominco, Canadian National Railways, and Northern Canada Power Corporation ▪ Taltson Hydroelectrical system ▪ Railway from Edmonton to Pine Point Mine Site ▪ 100km of 25m-wide Haulage Roads were built Explora
Slide 6: Cominco Era Mill Site Looking Northeast
Cominco Era Mill Site Looking Northeast www.pinepointmining.com 6
Slide 7: Cominco Era
Cominco Era “Twinkle Toes” www.pinepointmining.com 7
Slide 8: Cominco Era Open Pit Mine
Cominco Era Open Pit Mine www.pinepointmining.com 8
Slide 9: Mill Site View Towards Mill Site
Mill Site View Towards Mill Site Town of Pine Point www.pinepointmining.com 9
Slide 10: Cominco leaders holding Claim Post No.1
From left to right Bill Kirkpatrick President of Cominco holding on to Claim Post No.1 Bill Jewitt President Pine Point Mines N. R. Crump CP Railway Chairman www.pinepointmining.com 10
Slide 11: Cominco Era Site Tour
Cominco Era Site Tour www.pinepointmining.com 11
Slide 12: Cominco Era 1985: Y65 First Ore
Cominco Era 1985: Y65 First Ore One of Two Underground Mines www.pinepointmining.com 12
Slide 13: Massive Pine Point Ore
Massive Pine Point Ore Con Mine Core Core & First Concentrate Pine Point First Zinc Concentrate November 27, 1965 www.pinepointmining.com 13
Slide 14: Cominco Historical Production
Cominco Historical Production Total for 24 Years: 69.4 Mst or 64.3Mt @ ~ 10% Zn + Pb www.pinepointmining.com 14
Slide 15: Pine Point Project Update: Recent history
Pine Point Project Update Recent history 2003 Tamerlane Expl. acquires R Burns Claims 2005-06 Environmental Baseline Studies 2007 DAR Submitted, Environmental Assessment 2008 Land Use Permit (LUP) issued 2009 Feasibility R-190 deposit west of Buffalo River 2013 Receivership 2016 Darnley Bay acquires
Slide 16: Project Update
Project Update 2018-24: PPML Summary Current and upcoming activities ▪ 2018-24: Six Year Definition Drilling Program ▪ Definition/Trade Off Studies (~ PFS) ▪ 30-metre spacing for Indicated Resources ▪ Processing Pre-Concentration (In/Out) ▪ 2500 drill holes, 167 kilometres to improve confidence in ▪
Slide 17: Advancing Sustainability with the TSM Initiative
Advancing Sustainability with the TSM Initiative By advancing our Towards Sustainable Mining (TSM) implementation, we demonstrate a commitment to responsible resource development, ensuring long-term asset value, easier capital access, and a competitive edge in the global market. Leadership in Sustai
Slide 18: Mineral claim holdings
Mineral claim holdings ▪ 2018: Initial PPML Mineral Claims in pink ▪ 2019: Mineral Claims in blue ▪ resulted from Collaboration Agreements Collaboration was key to Pine Point Mining development project success so far www.pinepointmining.com 18
Slide 19: Project schedule | Key milestones
Project schedule | Key milestones H2 2025 Submit “Developers Assessment Report” (DAR) that includes answers to the “Terms of Reference” that were asked by the Environmental Review Board (MVEIRB) This is the beginning of the permitting process ~2028 Objective for approval & permits needed for constru
Slide 20: Buffalo River and Pine Point camp
Buffalo River SCALE Pine Point camp www.pinepointmining.com 20
Slide 21: Pine Point camp
Evaporite Basin Open Ocean Pine Point camp www.pinepointmining.com 21
Slide 22: Geology
Geology Evaporite Basin Open Ocean Pine Point 10 km wide Sulphur Point Formation Focus of mineralization Carbonate Host Rocks Barrier Reef Complex www.pinepointmining.com 22
Slide 23: Regional geology
Regional geology Sedimentary Carbonate Host Rocks ▪ Pine Point formation in dark blue ▪ Sulfur Point formation in medium blue All flat lying sediments slightly dipping/tilted 3 to 5 degrees to the west www.pinepointmining.com 23
Slide 24: Mineralization | Deposit types
Mineralization | Deposit types Prismatic Type Tabular Type Vertical Build-Up Kilometer Long From Tabulars Fluid Channel Ways Depth unknown Earlier exploration underestimated the role of structure www.pinepointmining.com 24
Slide 25: Mineralization facies | W85 Prismatic
Mineralization facies | W85 Prismatic Prismatic Tabular HG Keel Tabular LG Halo Prismatic With Tabular Apron www.pinepointmining.com 25
Slide 26: W85-YBM Prismatic
W85-YBM Prismatic Surfaces are the base of each formation www.pinepointmining.com 26
Slide 27: Bedrock | Slave Point formation
Bedrock | Slave Point formation www.pinepointmining.com 27
Slide 28: Base of Slave Point Formation
Base of Slave Point Formation www.pinepointmining.com 28
Slide 29: Base of Watt Mountain formation
Base of Watt Mountain formation www.pinepointmining.com 29
Slide 30: Base of Buffalo River formation
Base of Buffalo River formation www.pinepointmining.com 30
Slide 31: Base of Sulphur Point formation
Base of Sulphur Point formation Host of majority of mineralization www.pinepointmining.com 31
Slide 32: W85 Prismatic with Tabular Apron
W85 Prismatic with Tabular Apron www.pinepointmining.com 32
Slide 33: Mineralization samples
Mineralization samples Sphalerite (ZnS) and Galena (PbS) Sphalerite (ZnS) www.pinepointmining.com 33
Slide 34: Mining Methods
Mining Methods ▪ “Open pit” mining east of the Buffalo River in the historical Cominco era Pine Point mining camp where mineralization is located at shallow depths ▪ Deposits located west of the river are deeper and planned to be “Underground Mining” ▪ Currently 2 deposits would be mined West of Buf
Slide 35: Pine Point Mine Project Development
Pine Point Mine Project Development www.pinepointmining.com 35
Slide 36: Example of Waste & OB Piles Criteria
Example of Waste & OB Piles Criteria Overburden Pile Waste Rock Pile ▪ Maximum pile height: 80m ▪ Optimization to reduce surface pile footprints ▪ Integrate contact water management ▪ Deposit Waste Rock in “New” or “Historical” Open Pits Where Practical www.pinepointmining.com 36
Slide 37: Processing plant site
Processing plant site Access to site Buildings “Full Milling” Proposed to be through the ▪ Camp and Mill/Concentrator are Run of Mine (“ROM”) and former Pine Point Town planned to be steel structures Stockpile area with Primary Jaw Crusher to be located ▪ Truck Shops & Warehouse are next to the Mill
Slide 38: Processing plant site layout
Ore Storage & Handling ROM Pad Processing plant Mine Camp Complex site layout Hot Change Fuel Storage Process Plant Main Substation Power Plant Assay Lab Main Gate House Natural Gas & Distribution www.pinepointmining.com 38
Slide 39: Processing plant site layout
Process Plant Mine Office & Dry Power Plant Administration Building Laundry, Rec Room & Welcome Center Kitchen Main Substation Processing plant site layout www.pinepointmining.com 39
Slide 40: Processing plant site layout
Mine Camp Process Plant Complex Mine Fuel Storage Ore Storage & Hot Change Handling Warehouse Truckshop Ore Stockpile Processing plant site layout Primary Crushing www.pinepointmining.com 40
Slide 41: Processing plant site layout
Mine Camp Ore Storage & Handling ROM Pad Complex Warehouse Process Plant Truckshop Mine Fuel Storage Processing plant site layout www.pinepointmining.com 41
Slide 42: Processing plant site layout
Truckshop Power Plant Main Substation Warehouse Mine Camp Complex Processing plant site layout www.pinepointmining.com 42
Slide 43: Projected benefits for the NWT and Economic Viability
Projected benefits for the NWT and Economic Viability Direct benefits for the GNWT Indirect benefits for the NWT $300M+ in NWT mining taxes paid1 $1.2B+ Invested over the life of the project1 500+ jobs 400+ jobs $225M+ in NWT corporate income taxes paid1 $400M+ in salaries paid1 Construction Operati
Slide 44: Processing plant site and access
Processing plant site and access Access is planned through the town of Pine Point Daily deliveries, staff & visitors + 15 concentrate trucks per day, 7 days per week www.pinepointmining.com 44
Slide 45: Access Option Considered
Access Option Considered Option 1 Represents the option with the lowest new disturbance Options 1 & 2 are similar in length Options 1 & 2 provide lower dust air emissions and less road maintenance during operations than Option 3 Option 1 Option 3 Options 1 & 2 reduce the potential Option 2 interacti
Slide 46: Water Management
Water Management Strategies for minimizing impacts from water Dewatering discharge ▪ Dewatering groundwater would be ▪ Injection of dewatering water is being considered for West Zone only pumped from wells drilled around the ▪ Plan is to use historical open pits as settling ponds when needed to allo
Slide 47: Project LIDAR & drainage ditches
Project LIDAR & drainage ditches www.pinepointmining.com 47
Slide 48: Tailings Management
Tailings Management Comparative analysis: in-pit disposal vs surface tailings storage facilities ▪ For Pine Point mining waste management, two primary methods were considered: • In-pit disposal • Surface Tailings Storage Facilities (TSF) www.pinepointmining.com 48
Slide 49: Tailings Management
Tailings Management www.pinepointmining.com 49
Slide 50: Environmental Considerations: Company's Perspective
Environmental Considerations: Company’s Perspective In-pit disposal Surface TSF ▪ In-pit disposal is suitable for most tailing types ▪ Surface TSFs can also accommodate various offering versatility in waste management tailings types but preset a higher risk of ARD unless designed with proper covers
Slide 51: Environmental, social & regulatory considerations
Environmental, social & regulatory considerations Scope Timeline Geographic context The project encompasses mining Key milestones are set throughout The site is located at the historic operations and supporting the project’s development phase Cominco Pine Point location and is infrastructure develop
Slide 52: Baseline data collection
Baseline data collection Objective Methods Duration Establish pre-development environmental conditions Data loggers, water ▪ Water quality and quantity samples, flow meters, other instruments Field measurements and Multi-year ▪ Aquatic and aquatic habitat monitoring mapping to capture ▪ Wildlife and
Slide 53: 2023 field sampling locations
2023 field sampling locations www.pinepointmining.com 53
Slide 54: 2024 Field sampling locations
2024 Field sampling locations www.pinepointmining.com 54
Slide 55: Community and Indigenous engagement
Community and Indigenous engagement Engagement ▪ Regular community meetings and updates, including planned November 2024 meetings Traditional and Indigenous knowledge ▪ Incorporating indigenous traditional knowledge into environmental management and mitigation strategies ▪ Indigenous knowledge repor
Slide 56: Schedule example
Schedule example ▪ Permitting starts with the Environmental Assessment ▪ Followed by the MVLWB Permitting Process ▪ Typically done one process after the other ▪ Proposing to do them at the same time as much as is possible ▪ Could lead to an earlier start-up and associated benefits www.pinepointminin
Slide 57: Environmental assessment process
Environmental assessment process 1 2 3 4 Scoping Impact assessment Mitigation measures Review and decision Identify key issues and Evaluate potential impacts Propose solutions to Propose solutions to indigenous concerns on air, land, water and minimize environmental minimize environmental through co
Slide 58: Permitting overview
Permitting overview Water License Land Use License Regulated by MVLWB Regulated by MVLWB Water and waste Land disturbance management including construction, clearing, discharge setbacks, etc Regulating waster quality Regulates Closure plans, discharge and waste including wildlife habitat, land setba
Slide 59: Next steps and conclusions
Next steps and conclusions Current status Baseline studies completed, scoping ongoing, finalizing project description, modelling, assessment and mitigation Upcoming milestones Submission of Developer Assessment Report to MVEIRB and MVLWB Continued engagement Ongoing engagement with indigenous govern
Slide 60: Community benefits
Community benefits Local employment Skill development Economic growth Community investment Numerous roles Hands-on experience for Increased local spending Mine support of local supporting mine long-term mining and and business opportunities infrastructure and social operations for residents industry
Slide 61: We want to hear from you! We value your input!
We want to hear from you! We value your input! Check out our website at www.pinepointmining.com to leave us suggestions ▪ Helps us understand your needs and concerns ▪ Improves operations to align with community values ▪ Builds a mutually respectful relationship www.pinepointmining.com 61
Slide 62: Closing remarks
Closing remarks Next steps and future meetings PPML encourages feedback This is not the only time that you can comment ▪ going forward, and we will ▪ This is an introduction to the project at this time as we work on feasibility and permitting preparation continue to communicate and keep everyone inf