Pine Point Mining Limited

Pine Point Mining — Corporate Update (February 2025)

63 slides from Pine Point Mining's corporate update, Feb 10, 2025

  1. Slide 1: Project History & Update Towards Developers Assessment Report (Interim)

    Project History & Update Towards Developers Assessment Report (DAR) (Interim) February 10, 2025 www.pinepointmining.com 1

  2. Slide 2: Overview

    Overview 1. Introduction to the PPML Team 2. Zinc in Western Canada 3. History & Company Overview 4. Pine Point Project Update & Key Milestones 5. Geology 6. Mining 7. Infrastructure & Site Layout Design 8. Water Management Strategies 9. Tailings Management 10. Environmental, Social and Regulatory C

  3. Slide 3: Zinc

    Zinc Pine Point is a Zinc-Lead Mine Development Project that could potentially be a top ten global “Clean Zinc Concentrate” producer. Why is Zinc a critical mineral? Galvanization is the Cement production creates 8-9% of annual GHG main use for zinc … emissions globally! Zinc galvanization of rebar

  4. Slide 4: History of Pine Point | Cominco era

    3. History of Pine Point | Cominco era Pre-1885 First mineralization identified on surface during the Klondike Gold Rush 1898 First claims staked 1899 Area deemed too remote for Zinc and Lead to be mined economically 1925-1930 (Cominco) Early exploration drilling 5 deposits discovered Great Depressi

  5. Slide 5: History of Pine Point | Cominco era and exploration

    History of Pine Point | Cominco era and exploration Infrastructure 1961 Federal Government, Cominco, Canadian National Railways, and Northern Canada Power Corporation ▪ Taltson Hydroelectrical system ▪ Railway from Edmonton to Pine Point Mine Site ▪ 100km of 25m-wide Haulage Roads were built Explora

  6. Slide 6: Cominco Era Mill Site Looking Northeast

    Cominco Era Mill Site Looking Northeast www.pinepointmining.com 6

  7. Slide 7: Cominco Era

    Cominco Era “Twinkle Toes” www.pinepointmining.com 7

  8. Slide 8: Cominco Era Open Pit Mine

    Cominco Era Open Pit Mine www.pinepointmining.com 8

  9. Slide 9: Mill Site View Towards Mill Site

    Mill Site View Towards Mill Site Town of Pine Point www.pinepointmining.com 9

  10. Slide 10: Cominco leaders holding Claim Post No.1

    From left to right Bill Kirkpatrick President of Cominco holding on to Claim Post No.1 Bill Jewitt President Pine Point Mines N. R. Crump CP Railway Chairman www.pinepointmining.com 10

  11. Slide 11: Cominco Era Site Tour

    Cominco Era Site Tour www.pinepointmining.com 11

  12. Slide 12: Cominco Era 1985: Y65 First Ore

    Cominco Era 1985: Y65 First Ore One of Two Underground Mines www.pinepointmining.com 12

  13. Slide 13: Massive Pine Point Ore

    Massive Pine Point Ore Con Mine Core Core & First Concentrate Pine Point First Zinc Concentrate November 27, 1965 www.pinepointmining.com 13

  14. Slide 14: Cominco Historical Production

    Cominco Historical Production Total for 24 Years: 69.4 Mst or 64.3Mt @ ~ 10% Zn + Pb www.pinepointmining.com 14

  15. Slide 15: Pine Point Project Update: Recent history

    Pine Point Project Update Recent history 2003 Tamerlane Expl. acquires R Burns Claims 2005-06 Environmental Baseline Studies 2007 DAR Submitted, Environmental Assessment 2008 Land Use Permit (LUP) issued 2009 Feasibility R-190 deposit west of Buffalo River 2013 Receivership 2016 Darnley Bay acquires

  16. Slide 16: Project Update

    Project Update 2018-24: PPML Summary Current and upcoming activities ▪ 2018-24: Six Year Definition Drilling Program ▪ Definition/Trade Off Studies (~ PFS) ▪ 30-metre spacing for Indicated Resources ▪ Processing Pre-Concentration (In/Out) ▪ 2500 drill holes, 167 kilometres to improve confidence in ▪

  17. Slide 17: Advancing Sustainability with the TSM Initiative

    Advancing Sustainability with the TSM Initiative By advancing our Towards Sustainable Mining (TSM) implementation, we demonstrate a commitment to responsible resource development, ensuring long-term asset value, easier capital access, and a competitive edge in the global market. Leadership in Sustai

  18. Slide 18: Mineral claim holdings

    Mineral claim holdings ▪ 2018: Initial PPML Mineral Claims in pink ▪ 2019: Mineral Claims in blue ▪ resulted from Collaboration Agreements Collaboration was key to Pine Point Mining development project success so far www.pinepointmining.com 18

  19. Slide 19: Project schedule | Key milestones

    Project schedule | Key milestones H2 2025 Submit “Developers Assessment Report” (DAR) that includes answers to the “Terms of Reference” that were asked by the Environmental Review Board (MVEIRB) This is the beginning of the permitting process ~2028 Objective for approval & permits needed for constru

  20. Slide 20: Buffalo River and Pine Point camp

    Buffalo River SCALE Pine Point camp www.pinepointmining.com 20

  21. Slide 21: Pine Point camp

    Evaporite Basin Open Ocean Pine Point camp www.pinepointmining.com 21

  22. Slide 22: Geology

    Geology Evaporite Basin Open Ocean Pine Point 10 km wide Sulphur Point Formation Focus of mineralization Carbonate Host Rocks Barrier Reef Complex www.pinepointmining.com 22

  23. Slide 23: Regional geology

    Regional geology Sedimentary Carbonate Host Rocks ▪ Pine Point formation in dark blue ▪ Sulfur Point formation in medium blue All flat lying sediments slightly dipping/tilted 3 to 5 degrees to the west www.pinepointmining.com 23

  24. Slide 24: Mineralization | Deposit types

    Mineralization | Deposit types Prismatic Type Tabular Type Vertical Build-Up Kilometer Long From Tabulars Fluid Channel Ways Depth unknown Earlier exploration underestimated the role of structure www.pinepointmining.com 24

  25. Slide 25: Mineralization facies | W85 Prismatic

    Mineralization facies | W85 Prismatic Prismatic Tabular HG Keel Tabular LG Halo Prismatic With Tabular Apron www.pinepointmining.com 25

  26. Slide 26: W85-YBM Prismatic

    W85-YBM Prismatic Surfaces are the base of each formation www.pinepointmining.com 26

  27. Slide 27: Bedrock | Slave Point formation

    Bedrock | Slave Point formation www.pinepointmining.com 27

  28. Slide 28: Base of Slave Point Formation

    Base of Slave Point Formation www.pinepointmining.com 28

  29. Slide 29: Base of Watt Mountain formation

    Base of Watt Mountain formation www.pinepointmining.com 29

  30. Slide 30: Base of Buffalo River formation

    Base of Buffalo River formation www.pinepointmining.com 30

  31. Slide 31: Base of Sulphur Point formation

    Base of Sulphur Point formation Host of majority of mineralization www.pinepointmining.com 31

  32. Slide 32: W85 Prismatic with Tabular Apron

    W85 Prismatic with Tabular Apron www.pinepointmining.com 32

  33. Slide 33: Mineralization samples

    Mineralization samples Sphalerite (ZnS) and Galena (PbS) Sphalerite (ZnS) www.pinepointmining.com 33

  34. Slide 34: Mining Methods

    Mining Methods ▪ “Open pit” mining east of the Buffalo River in the historical Cominco era Pine Point mining camp where mineralization is located at shallow depths ▪ Deposits located west of the river are deeper and planned to be “Underground Mining” ▪ Currently 2 deposits would be mined West of Buf

  35. Slide 35: Pine Point Mine Project Development

    Pine Point Mine Project Development www.pinepointmining.com 35

  36. Slide 36: Example of Waste & OB Piles Criteria

    Example of Waste & OB Piles Criteria Overburden Pile Waste Rock Pile ▪ Maximum pile height: 80m ▪ Optimization to reduce surface pile footprints ▪ Integrate contact water management ▪ Deposit Waste Rock in “New” or “Historical” Open Pits Where Practical www.pinepointmining.com 36

  37. Slide 37: Processing plant site

    Processing plant site Access to site Buildings “Full Milling” Proposed to be through the ▪ Camp and Mill/Concentrator are Run of Mine (“ROM”) and former Pine Point Town planned to be steel structures Stockpile area with Primary Jaw Crusher to be located ▪ Truck Shops & Warehouse are next to the Mill

  38. Slide 38: Processing plant site layout

    Ore Storage & Handling ROM Pad Processing plant Mine Camp Complex site layout Hot Change Fuel Storage Process Plant Main Substation Power Plant Assay Lab Main Gate House Natural Gas & Distribution www.pinepointmining.com 38

  39. Slide 39: Processing plant site layout

    Process Plant Mine Office & Dry Power Plant Administration Building Laundry, Rec Room & Welcome Center Kitchen Main Substation Processing plant site layout www.pinepointmining.com 39

  40. Slide 40: Processing plant site layout

    Mine Camp Process Plant Complex Mine Fuel Storage Ore Storage & Hot Change Handling Warehouse Truckshop Ore Stockpile Processing plant site layout Primary Crushing www.pinepointmining.com 40

  41. Slide 41: Processing plant site layout

    Mine Camp Ore Storage & Handling ROM Pad Complex Warehouse Process Plant Truckshop Mine Fuel Storage Processing plant site layout www.pinepointmining.com 41

  42. Slide 42: Processing plant site layout

    Truckshop Power Plant Main Substation Warehouse Mine Camp Complex Processing plant site layout www.pinepointmining.com 42

  43. Slide 43: Projected benefits for the NWT and Economic Viability

    Projected benefits for the NWT and Economic Viability Direct benefits for the GNWT Indirect benefits for the NWT $300M+ in NWT mining taxes paid1 $1.2B+ Invested over the life of the project1 500+ jobs 400+ jobs $225M+ in NWT corporate income taxes paid1 $400M+ in salaries paid1 Construction Operati

  44. Slide 44: Processing plant site and access

    Processing plant site and access Access is planned through the town of Pine Point Daily deliveries, staff & visitors + 15 concentrate trucks per day, 7 days per week www.pinepointmining.com 44

  45. Slide 45: Access Option Considered

    Access Option Considered Option 1 Represents the option with the lowest new disturbance Options 1 & 2 are similar in length Options 1 & 2 provide lower dust air emissions and less road maintenance during operations than Option 3 Option 1 Option 3 Options 1 & 2 reduce the potential Option 2 interacti

  46. Slide 46: Water Management

    Water Management Strategies for minimizing impacts from water Dewatering discharge ▪ Dewatering groundwater would be ▪ Injection of dewatering water is being considered for West Zone only pumped from wells drilled around the ▪ Plan is to use historical open pits as settling ponds when needed to allo

  47. Slide 47: Project LIDAR & drainage ditches

    Project LIDAR & drainage ditches www.pinepointmining.com 47

  48. Slide 48: Tailings Management

    Tailings Management Comparative analysis: in-pit disposal vs surface tailings storage facilities ▪ For Pine Point mining waste management, two primary methods were considered: • In-pit disposal • Surface Tailings Storage Facilities (TSF) www.pinepointmining.com 48

  49. Slide 49: Tailings Management

    Tailings Management www.pinepointmining.com 49

  50. Slide 50: Environmental Considerations: Company's Perspective

    Environmental Considerations: Company’s Perspective In-pit disposal Surface TSF ▪ In-pit disposal is suitable for most tailing types ▪ Surface TSFs can also accommodate various offering versatility in waste management tailings types but preset a higher risk of ARD unless designed with proper covers

  51. Slide 51: Environmental, social & regulatory considerations

    Environmental, social & regulatory considerations Scope Timeline Geographic context The project encompasses mining Key milestones are set throughout The site is located at the historic operations and supporting the project’s development phase Cominco Pine Point location and is infrastructure develop

  52. Slide 52: Baseline data collection

    Baseline data collection Objective Methods Duration Establish pre-development environmental conditions Data loggers, water ▪ Water quality and quantity samples, flow meters, other instruments Field measurements and Multi-year ▪ Aquatic and aquatic habitat monitoring mapping to capture ▪ Wildlife and

  53. Slide 53: 2023 field sampling locations

    2023 field sampling locations www.pinepointmining.com 53

  54. Slide 54: 2024 Field sampling locations

    2024 Field sampling locations www.pinepointmining.com 54

  55. Slide 55: Community and Indigenous engagement

    Community and Indigenous engagement Engagement ▪ Regular community meetings and updates, including planned November 2024 meetings Traditional and Indigenous knowledge ▪ Incorporating indigenous traditional knowledge into environmental management and mitigation strategies ▪ Indigenous knowledge repor

  56. Slide 56: Schedule example

    Schedule example ▪ Permitting starts with the Environmental Assessment ▪ Followed by the MVLWB Permitting Process ▪ Typically done one process after the other ▪ Proposing to do them at the same time as much as is possible ▪ Could lead to an earlier start-up and associated benefits www.pinepointminin

  57. Slide 57: Environmental assessment process

    Environmental assessment process 1 2 3 4 Scoping Impact assessment Mitigation measures Review and decision Identify key issues and Evaluate potential impacts Propose solutions to Propose solutions to indigenous concerns on air, land, water and minimize environmental minimize environmental through co

  58. Slide 58: Permitting overview

    Permitting overview Water License Land Use License Regulated by MVLWB Regulated by MVLWB Water and waste Land disturbance management including construction, clearing, discharge setbacks, etc Regulating waster quality Regulates Closure plans, discharge and waste including wildlife habitat, land setba

  59. Slide 59: Next steps and conclusions

    Next steps and conclusions Current status Baseline studies completed, scoping ongoing, finalizing project description, modelling, assessment and mitigation Upcoming milestones Submission of Developer Assessment Report to MVEIRB and MVLWB Continued engagement Ongoing engagement with indigenous govern

  60. Slide 60: Community benefits

    Community benefits Local employment Skill development Economic growth Community investment Numerous roles Hands-on experience for Increased local spending Mine support of local supporting mine long-term mining and and business opportunities infrastructure and social operations for residents industry

  61. Slide 61: We want to hear from you! We value your input!

    We want to hear from you! We value your input! Check out our website at www.pinepointmining.com to leave us suggestions ▪ Helps us understand your needs and concerns ▪ Improves operations to align with community values ▪ Builds a mutually respectful relationship www.pinepointmining.com 61

  62. Slide 62: Closing remarks

    Closing remarks Next steps and future meetings PPML encourages feedback This is not the only time that you can comment ▪ going forward, and we will ▪ This is an introduction to the project at this time as we work on feasibility and permitting preparation continue to communicate and keep everyone inf

  63. Slide 63: Head office and Pine Point contact details

    HEAD OFFICE: 1100 Ave Des Canadiens de Montreal Suite 300 Montreal, Quebec H3B 2S2 PINE POINT: Northwest Territories Canada X0E 0M0 info@pinepointmining.com