Victory Nickel Inc

Victory Nickel — Investor Presentation (September 2013)

32 slides from Victory Nickel's investor presentation, September 2013

  1. Slide 1: Victory Silica Ltd. – The Right Product, Place, Time

    TSX:Ni TSX:Ni Victory Silica Ltd. A Victory Nickel Inc. Company The Right Product. The Right Place. September 2013 The Right Time.

  2. Slide 2: Company Profile – Victory Nickel

    Company Profile – Victory Nickel TSX:Ni NI:TSX – Share Capital Structure Shares Outstanding ~554 million Victory Victory Fully Diluted Shares* ~686 million Nickel Inc. Silica Ltd. Market Capitalization $19.4 million (100%) Cash $4.2 million *31.5 M options ($0.08 average exercise price); 100 M warra

  3. Slide 3: Why Victory Silica?

    Why Victory Silica? TSX:Ni Very strong market fundamentals for frac sand Near-term cash flow Minimal capex required A New Story Experienced management with Precedent IPO transactions Extreme Value Large domestic resource Potential to become the largest supplier of the highest quality frac sand for d

  4. Slide 4: Experienced Management – Victory Silica Limited

    Experienced Management Victory Silica Limited TSX:Ni René R. Galipeau /Chairman 35+ years mining experience with Hudson Bay, Breakwater Resources, Lac Minerals, Rio Algom. Current Vice-Chairman and CEO of Victory Nickel. Ken Murdoch /CEO & Director Engineer with over 25 years experience in the aggre

  5. Slide 5: Victory Silica Objectives

    Victory Silica Objectives TSX:Ni Establish immediate entry in frac sand market Use resulting cash flow to support growth Goal of becoming preferred supplier of highest quality import and domestic frac sand products to the Canadian market Unlock the long-term value of the Minago premium frac sand res

  6. Slide 6: Shale Gas / Tight Oil Revolution

    Shale Gas / Tight Oil Revolution Frac Sand Boom TSX:Ni Unconventional ‘shale gas’ and ‘tight oil’ previously uneconomic to recover at a large scale Efficiency gains in horizontal drilling and the introduction of ‘fracking’ helped unlock vast natural gas and oil resources The rapid implementation of

  7. Slide 7: What is 'Fracking'? Frac Sand?

    What is ‘Fracking’? Frac Sand? Not all sand makes frac sand! TSX:Ni Hydraulic fracturing or ‘fracking’ is a technique used in the development of oil & gas formations to increase flow and extend well life. life Proppant (such as frac sand) holds the formation open, increases porosity, and increases o

  8. Slide 8: Horizontal Drilling

    Horizontal Drilling Proppant Demand Versus Horizontal Rig Count TSX:Ni 8

  9. Slide 9: Frac Sand Market

    Frac Sand Market Booming in North America TSX:Ni 9

  10. Slide 10: Proppant / Frac Sand Market

    Proppant / Frac Sand Market Historical & Projected Demand TSX:Ni North American Proppant Demand (billion pounds) % Annual Growth Item 2007 2012 2017 2007-2012 2012-2017 Proppant Demand 13.960 59.100 102.400 33.5 11.6 By Country: U.S. 12.270 53.260 89.950 34.1 11.1 Canada 1.690 5.840 12.450 28.1 16.3

  11. Slide 11: North American Shale Basins

    North American Shale Basins Initial Supply Opportunities for Victory Silica TSX:Ni Manitoba, Saskatchewan, Alberta, B.C., North Dakota Minago Medicine Hat Winnipeg (Seven Persons)_ Wisconsin Mine 11

  12. Slide 12: Business Plan – Phased Approach

    Business Plan Phased Approach – Overview TSX:Ni Phase 1: Seven Persons – processing infrastructure in Alberta Phase 2: Wisconsin Mine – security of supply, higher margins Phase 3: Winnipeg Facility – superior logistics, unlock value of Minago On-going: Potential consolidation opportunities in a frag

  13. Slide 13: Phase 1 – Seven Persons

    Phase 1 Seven Persons – Medicine Hat, Alberta TSX:Ni Initially process purchased import wet sand (concentrate) at $35/ton from existing mines in Wisconsin Short lead time to production Fully-functioning sand plant on 22.4 acres 30,000 tons of frac sand storage capacity ~$3.5 M capex to take dry plan

  14. Slide 14: Phase 2 – Wisconsin Mine Acquisition

    Phase 2 Wisconsin Mine Acquisition TSX:Ni Acquire and operate a Wisconsin Mine Obtain access to highest quality sand Provides security of supply and higher margins Resource estimate: 4 million tons per parcel Immediate sand production Permitted properties available Construct concentrator Source: Wis

  15. Slide 15: Phase 3 – Winnipeg Processing Site

    Phase 3 Winnipeg Processing Site TSX:Ni Build second processing facility in Winnipeg Lease an existing rail-supported industrial site in Winnipeg Construct new dry facility – 18 months from start Consider logistics company participation Phase 3 Capex US$26.1 million Working Capital US$15.3 million A

  16. Slide 16: Future Growth / Consolidation Opportunities

    Victory Silica Future Growth / Consolidation Opportunities TSX:Ni • Minago Development – 100-year+ frac sand potential • Advanced custom processing discussions: – Potential to reach new markets – Fixed production cost, contract-based, no capital cost • US processing facility: – Reach active Pennsylv

  17. Slide 17: Phases 1-3 Total Production and Capital Requirement

    Phases 1-3 Total Production and Capital Requirement TSX:Ni Phase Production Capex Working Capital (tons) (US$) (US$) Phase 1: 400,000 $3,500,000 $4,300,000 (imminent production) Phase 2: $4,400,000 Nil (3 months from start) 400,000 $7,900,000 $ 4,300,000 Total: Seven Persons Phase 3: Winnipeg Facili

  18. Slide 18: Recent Frac Sand Market Developments

    Victory Silica Recent Frac Sand Market Developments TSX:Ni Winn Bay/Preferred Sands: $200 million acquisition US Silica: $200 million IPO Hi-Crush: $225 million IPO Emerge Energy Services: $140 million IPO 18

  19. Slide 19: Relative Valuation

    Victory Silica Relative Valuation TSX:Ni Victory Silica 2nd Quarter Annualized Emerge Energy Hi-Crush US Silica Phase 1,2 Phase 3 Phase ($US) Services (~ 3 mos.) (18-24 mos.) 1,2,3 Cash raised on IPO $140 M $225 M $200 M $ 7.9 M $ 26.1 M $ 34 M Tons Sold 2,304,000 1,341,000 3,817,000 400,000 1,040,0

  20. Slide 20: Competitive Advantages

    Victory Silica Competitive Advantages TSX:Ni Location: storage capacity in proximity to potential customers / wellheads Highest quality imported and domestic sand Low-cost, rapid entry, quick payback Long-term supply Clear path for growth: Phases 1,2,3…and beyond 20

  21. Slide 21: Minago – Nickel/Frac Sand Co-Production

    Minago Nickel/Frac Sand Co-Production TSX:Ni One of Canada’s largest undeveloped sulphide nickel resources Positive feasibility study completed; permitted for production Frac sand a significant value driver: US$2.90/lb. in co-product value based on feasibility study Superb location: Manitoba; road,

  22. Slide 22: Minago Mining Project Co-Product: Frac Sand

    Minago Mining Project Co-Product: Frac Sand TSX:Ni Feasibility Study Highlights 11.2 million tonnes marketable frac sand in pit footprint alone Mined over first three years Sales over 10 years Mine gate margin per tonne ~$63 Annual net revenue ~$70 M Processing cost/tonne = $6.50 Co-product value pe

  23. Slide 23: Minago Project – Frac Sand Potential

    Minago Project Frac Sand Potential TSX:Ni Existing resource within current pit shell: 15 Mt Existing & proposed quarry leases: 75 Mt Proposed quarry exploration permits: 475 Mt Entire land package (mineral leases + mining claims): 2 Bt 23

  24. Slide 24: Victory Nickel Inc. – Building Canada's Next Nickel Producer

    TSX:Ni TSX:Ni Victory Nickel Inc. Building Canada’s Next September 2013 Nickel Producer

  25. Slide 25: Company Profile – Nickel Projects

    Company Profile Nickel Projects TSX:Ni Four Advanced Sulphide Nickel Projects Over one billion pounds of nickel in Measured and Indicated resources and 300 million pounds of Inferred resources, NI 43-101 compliant 25

  26. Slide 26: Minago Project – The Property

    Minago Project The Property TSX:Ni Well-located Sulphide nickel deposit Exceptional metallurgy Open pit and underground mining potential Bankable feasibility study on open pit only Exceptional exploration upside 26

  27. Slide 27: Minago Project – Reserves and Production Upside

    Minago Project Reserves and Production Upside TSX:Ni Nose Deposit open pit: 8.6-year mine life Nose Deposit U/G (inferred resource) North Limb: NI-43-101- compliant ETMI Mineralization open to west, north and at depth Combined resources projected mine life of <20 years 27

  28. Slide 28: Minago Project – Feasibility Study Optimization

    Minago Project Feasibility Study Optimization TSX:Ni Minago Sulphide Nickel Project: Economic Summary Comparison Base Case Base Case Dec. 14, 20091 July 19, 20111,2 ($million except % & yrs) ($million except % & yrs) Undiscounted cash flow 917.7 1,418.4 NPV @ 8% 293.8 513.0 NPV @ 6% 402.6 669.3 NPV

  29. Slide 29: Minago Project – Cost Summary

    Minago Project Cost Summary TSX:Ni C1 Cash Cost Per lb Nickel Feasibility Study After Optimization Net of Credits * US $1.94 (C$2.12) US $2.20 (C$2.41) Metal By-Product Credits US $0.72 (C$0.79) US $0.77 (C$0.85) Frac Sand By-Product US $3.68 (C$4.04) US $2.90 (C$3.18) Value Cash Cost per lb Nickel

  30. Slide 30: Victory Nickel Management Team

    Victory Nickel Management Team TSX:Ni René R. Galipeau /CEO & Director – Victory Nickel Inc. 30+ years mining experience with Hudson Bay, Breakwater Resources, Lac Minerals, Rio Algom Steve Harapiak /President & COO – Victory Nickel Inc. Engineer with 30+ years experience, including Hudson Bay, Nora

  31. Slide 31: Qualified Independent Board

    Victory Nickel Qualified Independent Board TSX:Ni Cynthia Thomas /Chair MBA, 20+ years international mining and project finance, former Director Mining Investment Banking – ScotiaMcLeod René R. Galipeau /CEO & Director Peter R. Jones Engineer, former CEO of Hudbay Minerals, 40+ years mining experien

  32. Slide 32: Disclaimer

    Disclaimer TSX:Ni Some of the statements contained in the following material may be "forward-looking statements." All statements, other than statements of historical fact, that address activities, events or developments that Victory Nickel believes, expects or anticipates will or may occur in the fu