ABOUT PROSPEX ENERGY ➢ AIM listed energy investor with a focus on onshore Europe (AIM:PXEN) ➢ Two non-operated revenue generating onshore gas investments with low operational risk: ➢ Selva Malvezzi, Italy ➢ El Romeral gas to power plant, Spain ➢ Cash generative ➢ Debt free ➢ Positioned for growth EN
Slide 4: Corporate Structure & Board
CORPORATE STRUCTURE & BOARD European Growth Strategy Mark Routh, CEO Bill Smith, Non-Executive Chairman Identifying low-risk opportunities that have the potential to generate shareholder value Andrew Hay, Independent Alasdair Buchanan, Independent Non-Executive Director Non-Executive Director Market
Slide 5: Italy - Selva Malvezzi
Italy - Selva Malvezzi Prospex owns a 37% Working Interest in the Selva Malvezzi Production Concession in the Po Valley Italy which contains the Selva field
Slide 6: Investment Portfolio – Italy
INVESTMENT PORTFOLIO – ITALY Italy: Selva Malvezzi Production Concession, Po Valley Selva (contains Selva Field) Ownership: 37% owned by Prospex (AIM:PXEN) / 63% owned by the operator Po Valley Energy Ltd (ASX:PVE) ➢ Selva Malvezzi is an approved production concession with an area of 81 km2 ➢ Produc
Slide 7: Selva Gas Production
SELVA GAS PRODUCTION STEPS TO PRODUCTION Selva Gas Pipeline Route ✓ Preliminary production concession, approved Feb 2019 ✓ Technical environmental approval, approved Jan 2020 & Nov 2020 ✓ Environment Minister Decree, approved April 2021 ✓ INTESA (Intergovernmental agreement), granted Q2 2022 ✓ Final
Slide 8: Selva Proven Gas Reserves
SELVA PROVEN GAS RESERVES ➢ PXEN farmed-in to 17% in October 2017 ➢ Podere Maiar (PM-1) discovery well drilled in December 2017 ➢ Well tested gas to surface in January 2018 from 2 intervals – The well is now in production ➢ In April 2022, completed acquisition of UOG’s 20% working Interest in Selva,
Slide 9: Selva Malvezzi Upside
SELVA MALVEZZI UPSIDE Low-risk follow-up targets Surface well locations and subsurface targets identified for three new wells to be drilled on the concession Selva North and Selva South ➢ Stratigraphic pinch-outs in the same style as Podere Maiar Selva North ➢ Upgraded to Contingent Resources follow
Slide 10: Timeline for Selva Malvezzi
TIMELINE FOR SELVA MALVEZZI • Environmental Impact Assessment approvals 2021 • Executed grid tie-in contract with SNAM • Environmental monitoring boreholes drilled and seismographs installed • ‘Intesa’ sent by MiTE[1] to the Emilia Romagna Regional government • ‘Intesa’ released by Emilia Romagna Re
Slide 11: Spain - El Romeral & Tesorillo
Spain - El Romeral & Tesorillo
Slide 12: Investment Portfolio – Spain
INVESTMENT PORTFOLIO – SPAIN Spain: El Romeral Ownership: El Romeral - 49.9% owned by Prospex / 50.1% owned by Warrego[1] (Operated by Tarba Energía) El Romeral El Romeral: Ongoing Production & Power Generation Tesorillo ➢ 8.1MW power station generating revenue at spot market electricity prices. Pro
Slide 13: Production & Development Project
PRODUCTION & DEVELOPMENT PROJECT HISTORY ➢ Since 1983, 7 wells drilled resulted in gas discoveries ➢ 5 went on production from 2002 ➢ 2 proven undeveloped discoveries (PUDs) PRESENT ➢ Production from 2 wells ➢ High electricity prices ➢ 26-inch ENAGAS pipeline traverses the three Romeral concessions
Slide 14: El Romeral – ESG & Business Development Opportunities
EL ROMERAL – ESG & BUSINESS DEVELOPMENT OPPORTUNITIES Activity Timings* ✓ Environmental Initiation proposed for 18 new infill wells, 5 permits to drill submitted Q2 2021 ✓ Project Apollo - Solar panels installed on power plant roof (payback in 4 years) Q3 2022 • Project Helios - photo-voltaic panels
Slide 15: Potential for El Romeral Shut-in Wells for Gas Storage
POTENTIAL FOR EL ROMERAL SHUT-IN WELLS FOR GAS STORAGE TARBA has started participating in the EU-financed UNDERGY storage programme, by means of technical information exchange. The programme considers using depleted reservoirs as gas storage. At least 2 candidates exist within the Romeral concession
Slide 16: Seismic Reprocessing
SEISMIC REPROCESSING Full reprocessing of El Romeral 2D Seismic using modern, broad Original bandwidth processing flow and new methods for noise attenuation Reprocessed Resulted in a significant uplift of imaging quality Project was delivered on time and in budget Re-interpretation is now complete,
Slide 17: Prospect De-risking
PROSPECT DE-RISKING High-Grading the prospects from the 2022 interpretation: ➢ The 2022 interpretation of re-processed seismic data resulted in a list of 20 targets ➢ In 2023, we further de-risked these targets by examining AVO anomalies at the pre-stack level with the help of a specialist geophysic
Slide 18: El Romeral: Gas Ready for Development
EL ROMERAL: GAS READY FOR DEVELOPMENT 11 LOW-RISK PROSPECTS 2 UNDEVELOPED DISCOVERIES FULLY-OWNED CAPACITY AT PLANT CERTIFIED BY CPR* FROM THE 1980s LOCAL PIPELINE NETWORK FOR MORE GAS ❖ BEST TECHNICAL CASE SHOWN IN SOLID COLOUR ❖ LOW AND HIGH CASES SHOWN ON EITHER SIDE ❖ PROVEN UNDEVELOPED DISCOVER
Slide 19: Tesorillo Permit Map
TESORILLO PERMIT MAP Prospex owns 15% of Tesorillo (Warrego 85%) Prospex option to increase to 49.9% 1. Low Risk Exploration ➢ 1956 Almarchal-1 well logged 212m of net gas pay ➢ Multiple DST’s flowed gas to surface* 2. Large defined structure ➢ Operated by Tarba Energía (85% Warrego : 15% PXEN) ➢ PX
Slide 20: Spain – Tesorillo Project
SPAIN – TESORILLO PROJECT POTENTIAL UNDEVELOPED DISCOVERY ➢ Contains the Almarchal-1 gas discovery well (drilled in 1957) which logged 212m of net gas pay. Multiple DST’s flowed gas to surface ➢ Operated by Tarba Energía (85% Warrego : 15% PXEN) PXEN option to increase to 49.9% for €1.725m ahead of
Slide 21: Timelines for 2024/2025
TIMELINES FOR 2024/2025 2024 2025 Q2 Q3 Q4 Q1 Q2 Q3 BUSINESS DEVELOPMENT OPPORTUNITIES (INCLUDING SOLAR PROJECTS) EL ROMERAL ENVIRONMENTAL PERMITTING & PLANNING DRILLING[1] PRODUCTION – UP TO 5 NEW WELLS[1] SPAIN - 5 WELL DRILLING CAMPAIGN INCREASE ELECTRICITY PRODUCTION REVENUES TESORILLO – WELL DE
Slide 22: Summary
SUMMARY I nve st me nt cas e U n l o ck in g s h are h o lde r val u e ➢ Secured reserves/commercial revenue generation ➢ Diversified portfolio assembled ➢ Still trading at discount to recent analyst[1] target price ➢ Risk managed ➢ Huge potential NPV uplift from new projects ➢ Multiple routes to si
Slide 23: The Team / Reserves & Resources
The Team Reserves & Resources
Slide 24: The Team
THE TEAM Mark Routh - CEO & Managing Director Mark is a Petroleum Engineer with more than 40 years of experience in the oil & gas industry. He has an MSc in Petroleum Engineering. He spent eight years as CEO/Chairman of AIM quoted IOG plc and seven years as Chairman/NED of Warrego Energy Ltd. Founde
Slide 25: Reserves and Resources (Bcf)
RESERVES AND RESOURCES (BCF) Net 2P Reserves Net 2C Contingent Net Best Estimate Resources Prospective Resources El Romeral, 0.15 North Selva – East Selva & other Tarazona, 0.9 Level B, 3.3 Podere Gallina, 32.6 Tesorillo Romeral 15%, 124.6 Romeral-4S, 1.6 Prospects, 44.8 5.11 Bcf 7.72 Bcf 493 Bcf It