Orion Minerals Limited · ASX:ORN

Orion Minerals — RRS Summer Series Investor Conferences 2019

28 slides from Orion Minerals's conference presentation, Feb 14, 2019

  1. Slide 1: Preparing for Prieska

    ASX/JSE: ORN ASX/JSE: ORN Preparing for Prieska Developing a 21st century African zinc-copper mine PAGE Errol Smart, Managing Director and CEO | RRS Summer Series Investor Conferences 12-14 February 2019

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation contains summary information about Orion Minerals • may include, among other things, statements regarding bodies corporate and affiliates and their officers, employees, agents, Ltd and its subsidiaries (Orion or Company) and their activities and is targets, estimates and

  3. Slide 3: Overview: A New Generation African Base Metal Mine Developer

    OVERVIEW: A NEW GENERATION AFRICAN BASE METAL MINE DEVELOPER • Fast-tracking development of the Prieska Zinc-Copper Project, Northern Cape • Robust 10-year, Phase 1 Project outlined by December 2018 Scoping Study • Bankable Feasibility Study on track for Q2 2019; Final Investment Decision 2H 2019 •

  4. Slide 4: Corporate Structure

    CORPORATE STRUCTURE Capital structure summary Primary listing on the ASX Shares on issue 1,874M Secondary listing on Main Board of the Johannesburg Stock Exchange Options on issue 209M Market capitalisation (2.3cps (ASX))1 $43M Significant shareholders % Loan facility ($3.6M facility, 2.6cps convert

  5. Slide 5: Prieska: Reawakening a Global VMS Giant

    PRIESKA: REAWAKENING A GLOBAL VMS GIANT • Located in Northern Cape Province, 270km south-west of regional capital, Kimberley • Established mining region, yet least populous region of South Africa • Historically mined by AngloVaal (1971-1991) Skorpion/ • Recorded historical production of 1Mt of Zn an

  6. Slide 6: Prieska: Developing a New Mine in the Footprint of an Old One

    PRIESKA: DEVELOPING A NEW MINE IN THE FOOTPRINT OF AN OLD ONE • Ability to leverage off extensive infrastructure already in place: • Primary shafts and underground decline roadways • Sealed access roads, 48km via bitumen road to existing rail siding • 175MW operational solar power plants with expans

  7. Slide 7: Prieska: Deep Sulphide Resource Strong Foundation for Development

    PRIESKA: DEEP SULPHIDE RESOURCE STRONG FOUNDATION FOR DEVELOPMENT • Deep Sulphide Mineral Resource of +105m Level Resource 28.7Mt @ 3.8% Zn and 1.2% Cu containing 1.08Mt Zn & 0.33Mt Cu (based on drilling results to 31 Oct 2018)* • Indicated Mineral Resource of 18.51Mt @ 3.6% Zn and 1.2% Cu provides

  8. Slide 8: Prieska Scoping Study Confirms Robust Phase 1, 10-Year Project

    PRIESKA SCOPING STUDY CONFIRMS ROBUST PHASE 1, 10-YEAR PROJECT • 2.4Mtpa operation producing ~70-80ktpa Zn and 22ktpa Cu in concentrates • 43% all-in-sustaining margin, with all-in-unit costs A$1,701/t (US$1,215/t) zinc equivalent metal sold • Estimated A$130m annual free cash flow after-tax at stea

  9. Slide 9: Prieska: Timeline to Development

    PRIESKA: TIMELINE TO DEVELOPMENT 1 2 3 Complete Prieska Project BFS Expand and upgrade Execute exploration program on highly Prieska Project resource prospective prospecting rights • Updated Deep Sulphide Resource and Scoping Study completed December 2018 • In parallel to BFS, Orion will progress ke

  10. Slide 10: Community Engagement Doing It Right From the Start

    COMMUNITY ENGAGEMENT DOING IT RIGHT FROM THE START Our communities are at the heart of our corporate responsibility activities. Some of the initiatives we have already undertaken include: • MoU with Siyathemba Local Municipality to cooperate on key community development initiatives: • Water infrastr

  11. Slide 11: A Dominant Land-Holding in an Under-Explored Belt

    A DOMINANT LAND-HOLDING IN AN UNDER-EXPLORED BELT • Highly prospective yet under-explored mineral province • 22 identified VMS occurrences historically confirmed by major mining houses • Reputed to have the highest concentration of zinc on the African continent1: • Large-scale sediment-hosted deposi

  12. Slide 12: Major Consolidation Play in a Proven Mineral District

    MAJOR CONSOLIDATION PLAY IN A PROVEN MINERAL DISTRICT • Large consolidated land package secured by Orion in 2015 – 1,790km2 • Consolidated under single owner for first time • No major exploration activity for past 30 years • Application of modern exploration techniques presents significant opportuni

  13. Slide 13: Potential to Define a Major New VMS Camp

    POTENTIAL TO DEFINE A MAJOR NEW VMS CAMP • Emerging VMS discovery at Ayoba, 5.3km SW of Prieska, confirms outstanding near-mine potential • First hole intersected: • 9.5m of massive sulphides grading 0.93% Zn and 0.63% Cu including 1.5m @ 4.98% Zn and 0.89% Cu* • 7.13m @ 1.44% Zn and 0.66% Cu* • Min

  14. Slide 14: South Africa: A Changing Mining Landscape

    SOUTH AFRICA: A CHANGING MINING LANDSCAPE • Despite turmoil in 2017, the rule of law prevailed • President Ramaphosa appointed in February 2018 • New Minister of Mineral Resources, Gwede Mantashe, appointed • New Mining Charter significantly improved on various drafts and for juniors and explorers a

  15. Slide 15: South Africa: The Opportunity for a New-Generation Mining Company

    SOUTH AFRICA: THE OPPORTUNITY FOR A NEW-GENERATION MINING COMPANY • JSE is the world’s 18th largest stock exchange by market cap • 505 listed companies and +800 securities • Aggregate market cap: US$988 billion • 41% liquidity • More than R767 billion (A$76.3b) raised in the last 5 years • Orion is

  16. Slide 16: What the Changing Landscape Means for Orion

    WHAT THE CHANGING LANDSCAPE MEANS FOR ORION Focus on creating meaningful empowerment structures • Exploration free of any BEE or Mining Charter impositions – aims to encourage greenfields exploration • For Mining Rights, 5 years to achieve 30% BEE ownership: • 20% black entrepreneurs • 5% employees

  17. Slide 17: Summary: A Compelling Investment Case

    SUMMARY: A COMPELLING INVESTMENT CASE • ‘A new mine in the footprint of an old mineʼ: • Updated JORC Mineral Resource and Scoping Study completed on schedule in December 2018 • Bankable Feasibility Study on track for Q2 2019 • Significant existing infrastructure in place • Large land-holding in Area

  18. Slide 18: Appendices

    APPENDICES A \ Orion Minerals

  19. Slide 19: Board of Directors

    BOARD OF DIRECTORS Denis Waddell Errol Smart Alexander Haller Mark Palmer Michael Hulmes Chairman Managing Director & Non-Executive Director Non-Executive Director Non-Executive Director Chief Executive Officer Denis is a Chartered Errol is a Geologist, with Alexander is a Partner at Mark is an inve

  20. Slide 20: Senior Management

    SENIOR MANAGEMENT Errol Smart Martin Bouwmeester Walter Shamu Michelle Jenkins Louw van Schalkwyk Nelson Mosiapoa Managing Director & Chief Financial Officer & Chief Operating Officer Executive: Finance & Executive: Exploration Group Corporate Social Chief Executive Officer Company Secretary Adminis

  21. Slide 21: Prieska Mine: Current Ownership Structure

    PRIESKA MINE: CURRENT OWNERSHIP STRUCTURE Orion Minerals Limited 100% Agama Exploration and Mining (Pty) Ltd 73.3% 70.0% 73.3% Repli Trading No 27 Vardocube (Pty) Ltd Bartotrax (Pty) Ltd (Pty) Ltd 26.7% 30.0% 26.7% BEE Partners 1 BEE Partners 2 BEE Partners 3 1. Mosiapoa Family Trust (15%) and Power

  22. Slide 22: Prieska: Updated Mineral Resource Inventory

    PRIESKA: UPDATED MINERAL RESOURCE INVENTORY Resource Classification Volume Tonnes Density Zn Zn Cu Cu m3 tonnes/m3 tonnes % tonnes % Indicated 5,432,000 18,507,000 3.4 667,000 3.60 217,000 1.17 Deep Sulphide Resource Inferred 2,977,000 10,219,000 3.4 417,000 4.1 117,000 1.1 Indicated 221,000 623,500

  23. Slide 23: Large Contiguous Blocks of Indicated Resource

    LARGE CONTIGUOUS BLOCKS OF INDICATED RESOURCE PAGE 23

  24. Slide 24: Prieska: Deep Sulphide Resource with Significant Growth Potential

    PRIESKA: DEEP SULPHIDE RESOURCE WITH SIGNIFICANT GROWTH POTENTIAL Longitudinal projection showing the Repli Deep Sulphide Resource, including priority target areas (pink hatch) for resource extension drilling Refer ASX release 5 November 2018 PAGE 24

  25. Slide 25: Scoping Study: Confirms Robust Phase 1, 10-Year Project

    SCOPING STUDY: CONFIRMS ROBUST PHASE 1, 10-YEAR PROJECT Price and FX assumptions Unit Estimated value Financial performance Unit Estimated value Metal price – Cu (USD3.00/lb) USD/t 6,614 NPV (pre-tax) @12.5% discount rate AUD m 400 – 440 Metal price – Zn (USD1.30/lb) USD/t 2,8661 IRR (pre-tax) % 38

  26. Slide 26: Prieska: Well-Understood Metallurgy, Good Quality Concentrates

    PRIESKA: WELL-UNDERSTOOD METALLURGY, GOOD QUALITY CONCENTRATES Historical Performance Data FS Locked Cycle Tests 100.0 90.0 • Extensive locked-cycle metallurgical test work program 80.0 Copper recovery (%) 70.0 completed 60.0 50.0 • Confirms metallurgical continuity across Deep 40.0 30.0 Sulphide Zo

  27. Slide 27: Prieska Process Flowsheet

    PRIESKA PROCESS FLOWSHEET PAGE 27

  28. Slide 28: For further information, contact: Orion Minerals Limited

    For further information, contact: Orion Minerals Limited Phone: +61 (0)3 8080 7170 Email: info@orionminerals.com.au ASX/JSE: ORN Website: www.orionminerals.com.au PAGE

Orion Minerals — RRS Summer Series Investor Conferences 2019 on 6ix