Sotkamo Silver Ab · NGM:SOSI
Sotkamo Silver Ab — Investor Presentation (February 2011)
16 slides from Sotkamo Silver Ab's investor presentation, Feb 9, 2011
Slide 1: Burgundy market place NGM Equity, Ticker: SOSI
Burgundy market place NGM Equity, Ticker: 1 SOSI
Slide 2: Share data
Share data Key share data Short name SOSI Market place NGM Equity; Burgundy Share price 0,75 SEK 52 week High/Low 1,35 / 0,24 Shares outstanding 288 301 985 (excl. warrants) Market Cap (M€) 164 m SEK Finnish institutional investors owns about 25 % 2
Slide 3: Taivaljarvi Silver Mine location
TAIVALJARVI % TPN SILVER MINE —*/'*” SILVER RESOURCES OY 4 se t KS pest é FE — “ Location Distance to: - Kuhmo go km - Sotkamo 4o km - Valtimo 45 km RUSSIA = Nurmes 60 km Oulu ~ Kajaani 80 km - Oulu 240 km Kajaankt * - Helsinki 480 km FINLAND © Po oS Helsinki ie : - Map sheet: 4322 12 - E4453500 / N
Slide 4: Project summary
Project summary 10 – 15 MEUR invested during last 25 years - 47 000 m drilling in 320 holes completed - 2 600 m tunnel and 350 m ventilation shaft completed - Pre feasibility study NI 43 101 Resources 1,8 million tonnes (measured, indicated & inferred,) - 145 g/t Ag; 0,8 g/t Au; 0,9% Zn; 0,5% Pb ”In
Slide 5: Mine Cash Flow
Mine Cash Flow Silver 22 $/oz, Gold 1200 $/oz 150
Slide 6: Current Main Owners
Current Main Owners Owner Shares Timo Lindborg trough company 32 000 000 Jouko Jylänki 31 500 000 Kaarlo Taipala 31 500 000 Teknoventure 23 625 000 Suomen Teollisuussijoitus Oy 23 625 000 Swedish investors 39 690 000 Old Gexco owners 17 907 990 Others 28 743 388 Totally today 228 301 985 Warrants 31
Slide 7: Share price development
Share price development Take over issue Warrant: subscription price 0,43 during March 2011 7
Slide 8: Use of money - 2011
Use of money - 2011 SOTKAMO Ey 2011 FEASIBILITY PROJECT AND COMPANY ADMINISTRATION Feasibility study works Underground drillingprogram: 30 drillhole s, ca. 2500-3000m 410 000 Pilot test and process planing 342 000 Environmental permitting process 85 000 Feasibility study 705 000 Field office 98 000
Slide 9: Mine Decline
PRODUCTION DECLINE IN PLACE DOWN TO –350 BELOW SURFACE Mine Decline Silver grade Ventilation shaft Depth of decline ca. 330m Mine Decline - 2.6 km long - Inclination 1:7 - Cross section 20 m2 - Volume ca. 65 000 m3 Deep extension of the oreMalmin body syvyysjatke
Slide 10: 3D Laser Scanning - Ore
SOTKAMO SPoInTOOLs view > Per:
Slide 11: Management
Management Timo Lindborg Jouko Jylänki CEO CTO Doctor of Technology, Master of Science in Chief Executive Officer in Silver Resources Oy since Engineering and Bachelor of Science in Geology. 2006. Master of Science degree from the Board member of Endomines AB. Previous Chief University of Oulu, Finl
Slide 12: Pictures from The Mine Site
Pictures from The Mine Site 12
Slide 13: Project Plan
Project Plan 2010 – 2012 COMPLETED - 20 kV power line, about 500 m. - Dewatering, maintenance, ventilation and heating of the mine tunnel. - The core drilling from the surface TO BE COMPLETED - Underground drilling program: - 30 – 40 drill holes, ca. 3 000 – 5 000 m. - Explore in-continuities, in si
Slide 14: Project Timeline
Project Timeline Project timeline 2006 2007 2008 2009 2010 2011 2012 2013 Application of claims Environmental studies Application of Mining concession Preparatory & Exploration work at the mine site Environmental permitting process Mine Technical planning Final Mine construction decision Constructin
Slide 15: Executive Summary
Executive Summary • Extensive exploration and technical mine planning completed, 10-15 MEUR invested. • Total resources 13 million tonnes. • Good geological potential for additional resources below depth of 550 m • Drilling, dewatering of tunnel, bankable feasibility etc will take 2 years and 2,8 ME
Slide 16: Silver: demand growing, supply tightening
SILVER • Demand growing − Strong emerging market economies − Private sector hoarding − The ultimate currency reserve − Strong industrial demand • Supply tightening − Stable production, growing demand − Lower output and higher costs from key producers − No resources left in central banks • Price incr
Sotkamo Silver — Investor Presentation (February 2011) on 6ix