Los Andes Copper Ltd. · TSXV:LA

Los Andes Copper — Investor Presentation (March 2016)

31 slides from Los Andes Copper's investor presentation, Mar 5, 2016

  1. Slide 1: Investor Presentation

    Investor Presentation March 5, 2016 TSX-V: LA

  2. Slide 2: Cautionary Statement

    Cautionary Statement Statements contained in this presentation that are not historical facts may be forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and forward looking information within the meaning of the Securities Acts of Ontario and Alberta.

  3. Slide 3: Table of Contents

    Table of Contents  Executive Summary  The Vizcachitas Project  Hydro Electric Project  Corporate Team 3

  4. Slide 4: Executive Summary

    A LOS ANDES COPPER tea. Executive Summary a MAM AMKMHMMMM \AMAM MMMM MMMM AKAMA MAMMA AMMA MAMMA eas a4 4

  5. Slide 5: Project Overview

    Project Overview  PEA-stage project with large resource base Los Pelambres El Pachon  Porphyry copper-molybdenum deposit • Potential for a low strip, open pit operation • Potential for flotation operation Chile Vizcachitas  Occurs in the same metallogenic belt as large copper molybdenum porphyrie

  6. Slide 6: Comparative Undeveloped Copper Projects

    Comparative Undeveloped Copper Projects Vizcachitas NI 43-101 Compliant Resource Estimate (1) Cut-off Tonnes CuEq Grade Cu Grade Mo Grade Cu Mo (CuEq. %) (Million) (%) (%) (%) (Million lbs) (Million lbs) Indicated 0.30 1,038 0.434 0.373 0.012 8,539 281 Inferred 0.30 318 0.405 0.345 0.013 2,415 88 M&

  7. Slide 7: Project History

    Project History 2015-2016: 2013-2014: Higher grade central core drill program to New resource upgrade resource estimate including estimate and 2010: all 146 drill holes confirm the new Publishes positive geological model 2007 – 2008: Consolidation of mining Preliminary 1980s - 1990s: Los Andes Econo

  8. Slide 8: Investment Highlights

    Investment Highlights Very Large • One of the largest undeveloped copper projects not controlled by majors Resource • Few remaining high quality, large scale copper assets that remain independent Base • Vizcachitas Cu resource currently at 8.5 billion lbs indicated and 2.4 billion lbs inferred • Tot

  9. Slide 9: The Vizcachitas Project

    A LOS ANDES COPPER tea. The Vizcachitas Project wY MAAR MMU K KKM ARK KKK ARK KK ARK KKK AMHR MMH M KHAKI eas a4 9

  10. Slide 10: Concession Area

    Concession Area  100%-owned by Los Andes Copper  Project exploration and exploitation concessions covering ~ 250 km2  Only 9km2 of concession area has been significantly explored 10

  11. Slide 11: Geological District

    Geological District  North-south trending Neogene (23 - 2.5 Ma) metallogenic belt  Surrounded by assets owned by Codelco and Antofagasta Minerals  Region hosts 3 of the largest copper porphyry systems in the world • Los Bronces – Rio Blanco (101 billion lbs Cu) • El Teniente (283 billion lbs Cu)

  12. Slide 12: Drilling Campaigns

    Drilling Campaigns No. of Drill Meters Exploration Company Period Holes Drilled Focus  Central portion Placer Dome 1993 6 1,953 of property General  Central portion 1995 - 1998 61 15,815 Minerals Corp. of property Los Andes  South of 2007 - 2008 79 22,616 Copper Central core Los Andes 2015 - 2016

  13. Slide 13: 2014 Mineral Resources

    2014 Mineral Resources Indicated Resources Cut-off Tonnage Cu Eq Cu Grade Mo Grade Cu Mo (CuEq. %) Mt % % % Mlb Mlb 0.20 1,317 0.396 0.341 0.011 9,913 318 0.25 1,191 0.414 0.356 0.012 9,353 305 0.30 1,038 0.434 0.373 0.012 8,539 281 0.35 824 0.462 0.396 0.013 7,201 240 0.40 566 0.501 0.431 0.014 5,3

  14. Slide 14: 2014 CuEq Block Model

    2014 CuEq Block Model Legend Drill Holes Block Values CuEq% Historical Drilling Drill Hole Trace >=0.7 0.3 to 0.4 2015/2016 Drilling Topographic Surface Base of Open Pit 0.5 to 0.7 0.2 to 0.3 Section Line 0.4 to 0.5 < 0.2  Higher grade supergene  Continuous mineralization over 2 km by 1 km  Miner

  15. Slide 15: 2014 CuEq Block Model

    2014 CuEq Block Model Drill Holes Block Values CuEq% Historical Drilling 2015/2016 Drilling Topo Surface Base of Open Pit < 0.2 0.2 to 0.3 0.3 to 0.4 0.4 to 0.5 0.5 to 0.7 >=0.7 Source: PEA 2014 Block Model, cut-off of 0.3 % Cu Eq 15

  16. Slide 16: Exploration Potential

    Exploration Potential  Porphyry-style alteration identified over 3km x 1.5km  Cu-Mo mineralization identified over 2 km x 1 km  Higher grades identified in San Jose claim area  Mineralization open to east, north and west, and at depth  Additional significant alteration zones on property • North

  17. Slide 17: 2015/2016 Exploration Campaign

    2015/2016 Exploration Campaign  2015 /2016 drill program will focus on: • Confirm new geological model • Delineate early dioritic porphyry and hydrothermal breccias • Deeper drilling in high grade area • Converting of inferred resource to indicated • Drilling extensions within PEA pit • Drill testi

  18. Slide 18: 2014 PEA Project Layout

    2014 PEA Project Layout Throughput – 176 ktpd • Mine – Owner operated fleet • Rope shovels – 56 m3 • Haul trucks – 363 tonnes • Plant • Two modules with SABC-B circuit with two ball mills per module • Infrastructure • North Waste Area – 1,000 Mt • South Waste Area – 900 Mt • Initial Tailings Storage

  19. Slide 19: 2014 Preliminary Economic Assessment Overview

    2014 Preliminary Economic Assessment Overview Project Parameters Initial Capex US$B $2.9 Economics Sustaining Capex US$B $0.7 Description Units Post Royalty Pre tax Mine Life Years 28 Throughput ktpd 176 Cu Price US$/lb $2.75 $3.00 $3.25 Cu Recovery % 90% Mo Recovery % 75% Mo Price US$/lb $13.64 $13

  20. Slide 20: Recent Milestones

    Recent Milestones  Consolidation of mining property 2010  Exercise of outstanding mining options 2010  Capitalization and change of control 2010  Full payment of water rights 2011  Review of all historical drilling and metallurgical work 2011 – 2012  Update Resource Estimate 2013  Complete PE

  21. Slide 21: Upcoming Milestones

    Upcoming Milestones  Central Core and metallurgical drilling program Q4 2015 – Q2 2016  Update resource estimate based on in-fill drilling Q3 2016 program on project’s core claims  Update/optimize PEA Q3 2016  Begin pre-feasibility study Q1 2017 21

  22. Slide 22: Community Relations

    Community Relations  Established relationship with the local authorities and regional/national regulatory entities  Project will directly employ 4,000 people during construction and a full-time workforce of 1,200 people when in production  Currently working with the community groups to present th

  23. Slide 23: Hydro Electric Project

    A LOS ANDES COPPER tea. Hydro Electric Project wY MAAR M MYM K KKM ARK KKK ARK KK ARAM KRM K KAM RMA KKK K ARH MHHKHM eas a4 23

  24. Slide 24: Hydro Electric Project

    Hydro Electric Project Overview  Plant expected to be in operation in late 2018, with energy to be sold to third parties in the SIC (Central portion of the National Power Grid)  Hydro Electric Plant contemplates two Pelton units with an aggregate installed capacity of 28 – 30 MW  Development unde

  25. Slide 25: Corporate Team

    A LOS ANDES COPPER tea. Corporate Team a MAM AMKMHMMMM \AMAM MMMM MMMM AKAMA MAMMA AMMA MAMMA eas a4 25

  26. Slide 26: Management & Board of Directors

    Management & Board of Directors Management Mr. Amberg is a geologist who is a graduate of the Royal School of Mines, London, has an MSc. from Antony Amberg CEO, Chief Geologist University College London and is also a Chartered Geologist with the Geological Society of London. He has close to 30 years

  27. Slide 27: Management & Board of Directors

    Management & Board of Directors Management (cont’d) Ms. Davidson holds a Certified General Accountant designation from the Certified General Accountants Aurora Davidson Chief Financial Officer Association of British Columbia and a BSc in Business Administration from Alliant International University

  28. Slide 28: Management & Board of Directors

    Management & Board of Directors Board of Directors Dr. Zeitler obtained a PHD in economic planning at Karlsruhe University. He is a member of the Canadian Klaus Zeitler Chairman Institute of Mining and Metallurgy and the Prospectors and Developers Association. Dr. Zeitler financed, built and managed

  29. Slide 29: Management & Board of Directors

    Management & Board of Directors Board of Directors (cont’d) Mr. Miquel holds a degree in Mathematics applied to Social Sciences, and a degree in Economics from Paul Miquel Director the Universidad de Chile. He has been working in international investment banking since 1990. He has been Director for

  30. Slide 30: Why Invest in Los Andes Copper

    Why Invest in Los Andes Copper Large NI 43-101 resource with a positive PEA Excellent access to infrastructure, including water and power Exploration upside with significant resource expansion potential Situated in mining friendly Chile in a highly prospective copper belt Ready to advance project to

  31. Slide 31: Antony Amberg – CEO

    For further information, contact: Antony Amberg – CEO antony.amberg@losandescopper.com Phone: +56 (2) 2954 0450 Website: www.losandescopper.com 31

Los Andes Copper — Investor Presentation (March 2016) on 6ix