Australian Mines Limited · ASX:AUZ

Australian Mines — African Mining Indaba 2013

15 slides from Australian Mines's conference presentation, Feb 1, 2013

  1. Slide 1: Nigeria: The Future of West African Gold

    For personal use only Nigeria The Future of West African Gold

  2. Slide 2: Company Overview

    Company Overview For personal use only • Targeting gold deposits within Nigeria’s northwest gold fields • Nigeria – a long history of gold production and part of the West African gold province • Expansive 100% owned tenement portfolio exceeding 2,500 km2 • Gold mineralisation confirmed within Compan

  3. Slide 3: Re-emergence of Nigeria's Gold Sector

    Re-emergence of Nigeria’s Gold Sector For personal use only • Long history of gold production across Nigeria • Similar style of mineralisation as neighbouring West African gold producing countries • Success as an international oil producer has suppressed Nigeria's mineral exploration since1950’s • G

  4. Slide 4: First Mover Advantage

    First Mover Advantage For personal use only • Modern Mineral and Mining Act legislated by Nigeria in 2007 • Enabled AUZ to be a first mover in an emerging gold region • Entire tenement portfolio 100% AUZ • Strong Federal, State and Local government support • Transparent legal system • Similar corpor

  5. Slide 5: Key Project Areas

    Key Project Areas For personal use only • Targeting shear-hosted gold across Nigeria’s northwest gold fields • Three highly prospective projects  Yargarma  Kasele  Tegina • Four priority target zones currently being drill tested

  6. Slide 6: Yargarma: Three 'high priority' gold targets

    Yargarma: Three ‘high priority’ gold targets For personal use only • 350 kilometres northwest of Abuja • Three ‘high priority’ gold target zones verified by independent Australian geoscientists • Numerous active gold workings • Rock chip assays confirm project’s gold potential:  9.83 g/t gold 7.73

  7. Slide 7: Yargarma: Maiden drill program recently completed

    Yargarma: Maiden drill program recently completed For personal use only • Eight-hole maiden diamond core drilling program completed on 29th January 2013 • Initially testing two target zones (S-01 & S-03) • Program design to increase AUZ’s understanding of geological setting • Core presently being lo

  8. Slide 8: Kasele: Four priority target zones identified

    Kasele: Four priority target zones identified For personal use only • 300 kilometres northwest of Abuja • Four priority gold & base metal targets identified within project area • Artisanal workings present at priority targets • Rock chip assays from targets included:  65.0 g/t gold  7.1 g/t gold 

  9. Slide 9: Kasele: Maiden drill program in progress

    Kasele: Maiden drill program in progress For personal use only • Four-hole diamond core drill program commenced 1st February 2013 • Testing two priority targets  Includes a sizable artisanal working • Drilling scheduled to be completed by early March • Assay results expected by late May • Follow-up

  10. Slide 10: Tegina

    Tegina For personal use only • 130 kilometres northwest of Abuja • Ranked “highly prospective” by SRK Consulting study • Gold & base metal potential • Artisanal gold workings present within project area • 15 kilometre long target zone • First-pass geochemical sampling program planned for March/April

  11. Slide 11: Experienced Board of Directors

    Experienced Board of Directors For personal use only Non Executive Chairman • Qualified Lawyer with over 25 years’ experience as a corporate advisor Michael Ramsden • Chairman of Lowell Capital Limited - the responsible entity for a small cap resource fund • Managing Director of Terrain Capital and

  12. Slide 12: Capital Structure: fully-funded to mid-2014

    Capital Structure: fully-funded to mid-2014 For personal use only ASX Code AUZ Share price 3.0 cents Fully paid Ordinary Shares 666.9 million Options (4 cents expiring 30 June 2013) 59.5 million Unlisted Options (2 -12 cents expiring November 2014) 54.7 million Market Capitalisation 20.0 million Cas

  13. Slide 13: Summary

    Summary For personal use only • First mover advantage in emerging West African gold province • Large tenement package • Strong government support • Potential for multiple deposits • Gold workings within AUZ projects • Fully-funded program to mid-2014 • Drill testing of four priority targets currentl

  14. Slide 14: For more information, please contact

    For more information, please contact For personal use only Australian Mines Limited Level 1, 83 Havelock Street West Perth 6005 Western Australia Benjamin Bell Managing Director Phone: +61 8 9481 5811 Mobile:+61 467 770 016 Email: bbell@australianmines.com.au Or visit www.australianmines.com.au

  15. Slide 15: Disclaimer Notice

    Disclaimer Notice For personal use only Competent Person’s Statement Information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Benjamin Bell who is a member of the Australian Institute of Geoscientists and the Managing Direc

Australian Mines — African Mining Indaba 2013 on 6ix