Finder Energy Holdings Limited · ASX:FDR
Finder Energy — Investor Presentation (July 2026)
19 slides from Finder Energy's investor presentation, July 2026
Slide 1: Corporate Presentation
CORPORATE PRESENTATION July 2026 ASX : FDR KTJ Fast-Track to First Oil 1
Slide 2: Highlights
Highlights We are targeting a series of high Flagship Kuda Tasi & Jahal development project offshore Timor-Leste: impact catalysts on the KTJ Project in • Fast-track development targeting First Oil late 2027/early 2028 3Q 2026… • Powerful cash flow with initial forecast production rates of ~30,000 b
Slide 3: Corporate Snapshot (ASX:FDR)
Corporate Snapshot (ASX:FDR) Price (c) Vol (m) 1 Year Price Chart Share Price Company Directors 33c 25 0.70 70 0.60 60 20 0.50 50 15 0.40 40 Bronwyn Barnes 14 July 2026 10 0.30 30 Chairman 0.20 20 Market Capitalisation 5 0.10 10 $183m 0 0.00 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Ap
Slide 4: PSC 19-11 Resources – KTJ Upgraded
PSC 19-11 Resources – KTJ Upgraded Gross (100%) Contingent and Prospective Resources1 Karungu 180 KTJ Project Oil – MMbbl 10 25 MMbbl 160 26 Kuda Tasi 140 Jahal PSC 19-11 30 Lanjara/SW 120 Laminaria/ 66% Corallina 100 49 205 MMbbl 34% Kitan 26 MMbbl 80 Buffalo N 21 MMbbl 60 Krill 9 10 km 14 MMbbl Sq
Slide 5: KTJ Reservoir Performance
KTJ Reservoir Performance JH 1 & ST1 KT 1 KT 2 KT 3 • High quality Laminaria Formation reservoir JH 2 KT 4 • Strong aquifer drive and pressure support KT 5 • Light sweet oil, 55-60° API • Source of critical, naphtha-rich crude into a Jahal structurally supply-constrained APAC market Kuda Tasi 30,000
Slide 6: KTJ Fast-Track Development
KTJ Fast-Track Development 2024/25 | Subsurface STRONG FOUNDATION Fully appraised with 5 well penetrations in Kuda Tasi and Jahal and flow tests Independent resource assessment by RISC Advisory1 Significant upside mapped at Krill & Squilla oil discoveries2 2025 | Development Acceleration, Farm
Slide 7: Approved KTJ Development Concept
Subsea Production Equipment Approved KTJ Development Concept 1 Production Trees & ESP Manifold Production Trees & FPSO Moorings ESP Manifold Jahal Kuda Tasi Simple & quick – no fixed platforms, no export pipelines, no new build processing facilities 1 ASX announcement 9/7/26 7
Slide 8: Petrojarl I
Petrojarl I Strategic infrastructure ownership Vertically integrated operations with 100% ownership of FPSO 700 ft/35,000 Tn Double-hulled, providing a fast, cost-effective redeployment solution for KTJ Project internal turret, topside processing Proven track record and exceptional ‘in field’ perfor
Slide 9: Development Capex
Development Capex TIMOR GAP FARMOUT1 • TIMOR GAP to fund 50% of the total development capex from FID • Up to US$20 million (gross) applied to long lead items pre-FID • Gross cap US$338 million (including pre-FID LLIs), thereafter TIMOR GAP contributes their 34% working interest • Finder retains a 66
Slide 10: KTJ Resources certified by RISC Advisory
KTJ Resources certified by RISC Advisory KTJ Gross Contingent Resource1 (MMbbl) 1C 2C 3C 19.0 25.5 34.6 Top Reservoir 3D Kuda Tasi Depth Map Fully appraised with 5 wells – logs, core and well tests data Covered by high-end Ikan 3D reprocessed seismic data Jahal Excellent quality Laminaria Formation
Slide 11: Upside – KTJ is just the beginning
Upside – KTJ is just the beginning Core Value + Undeveloped Discoveries + Low Risk Exploration KTJ Development Project Krill & Squilla Multiple Prospects 25 MMbbl, Gross 2C 23 MMbbl, Gross 2C 116 MMbbl, Gross Pmean KTJ Development Lanjara Prospect Kitan Krill Kurisi Prospect Squilla 25 MMbbl 26 MMbb
Slide 12: Krill & Squilla Oil Discoveries – Significant Upside Identified
Krill & Squilla Oil Discoveries – Significant Upside Identified HISTORICAL MAPPING 2025 MAPPING GRV New 2025 Ikan 3D Reprocessing FIELD Step-change in image quality resolving GRV (m3 x 106) GRV (m3 x 106) Variance shallow fault complexity and improving Krill 136 217 +60% reservoir definition Squilla
Slide 13: Appendices
Ar tinder APPENDICES
Slide 14: UK North Sea – ILX Exploration Portfolio
UK North Sea – ILX Exploration Portfolio Finder P2610 (50%) licence Prolific Central North Sea Production platform • All licences operated by FPSO P2655 (100%) Boaz Eirin Finder Gina Krog Claymore Piper Sleipner • Strategic partnerships Tartan formed with nearby Scott Kinnoull facility owners Golden
Slide 15: Australia - key positions in prolific basins
Australia - key positions in prolific basins WA-547-P (100%) Northern Carnarvon Basin Vulcan Sub-basin • 508 MMboe over Phoenix Proven Play Oliver 3 key prospects1 Phoenix South surrounded by full- to-spill discoveries Roc • Along trend from Dorado Pavo Audacious Dorado Discovery Tenacious Mutineer
Slide 16: Contingent and Prospective Resources
Contingent and Prospective Resources Contingent Resources7 Oil/Cond Gross Contingent Resources Net Contingent Resources ASX announcement reference date and Country Licence FDR Equity Name Status (MMbbl)/ notes3 Gas (BCF) 1C 2C 3C 1C 2C 3C KTJ Project ASX – 8 Oct 2025 – RISC independent Kuda Tasi Fie
Slide 17: Notes on Petroleum Resource Calculations
Notes on Petroleum Resource Calculations Table Notes 1. Finder calculates reserves and resources according to the Society of Petroleum Engineers Petroleum Resource Management System (SPE-PRMS) definition of petroleum resources. Finder reports reserves and resources in line with ASX listing rules. 2.
Slide 18: Disclaimers and Cautionary Statement
Disclaimers and Cautionary Statement Forward-looking statements This report contains certain “forward-looking statements”, which can generally be identified by the use of words such as “will”, “may”, “could”, “likely”, “ongoing”, “anticipate”, “estimate”, “expect”, “project”, “intend”, “plan”, “beli
Slide 19: www.finderenergy.com
+61 8 9327 0100 info@finderenergy.com www.finderenergy.com 19
Finder Energy Holdings — Investor Presentation (July 2026) on 6ix