Prospect Resources Ltd. · ASX:PSC

Prospect Resources — Investor Presentation (April 2016)

8 slides from Prospect Resources's investor presentation, Apr 4, 2016

  1. Slide 1: Option to Acquire 12km Gold System - Moba Gold Project

    For personal use only Option to Acquire 12km Gold System - Moba Gold Project. March – April 2016 ACN 124 354 329

  2. Slide 2: Disclaimer & JORC Notice

    For personal use only Disclaimer & JORC Notice The information contained in this presentation or subsequently provided to any recipient of this presentation whether orally or in writing by or on behalf of Prospect Resources Ltd (“Prospect Resources or the Company”) or its respective employees, agent

  3. Slide 3: Moba Gold Project

    Moba Gold Project DRC hosts multi million ounce gold deposits For personal use only Project location of some other gold exploration companies in DRC  Located in the Tanganyika Province Moto Kilo Gold 29Moz >2Moz Mongbwalu  Two tenements covering Loncor Ngayu (5Moz) 680km2  Includes 3 colonial era

  4. Slide 4: Recent Gold Exploration Results

    Recent Gold Exploration Results For personal use only  Major gold bearing structures identified with >12km strike length  Exploration through drilling, trenching, pitting, grab/channel sampling  4 main drill targets discovered to date:  Mututolwa Target - 1,276m drilling has tested 3km gold stru

  5. Slide 5: Moba Gold Project

    Moba Gold Project Targeting kilometre-scale gold-bearing structures which have seen limited For personal use only exploration or mining since 1958 Major (kilometre scale) gold bearing structures KANSATU TARGET MUTOTOLWA KAMALINGELA TARGET TARGET 8.5 km KALEMA TARGET 5 Prospect Resources

  6. Slide 6: Mutotolwa Target

    Mutotolwa Target Plan view of historic gold workings - along mineralized structure For personal use only >3km strike length N 200m 200m 1000m 200m 6 Prospect Resources

  7. Slide 7: Mutotolwa Target

    For personal use only Mutotolwa Target Mutotolwa Drilling Mutotolwa N strike 19 Diamond drill holes length 600m Weighted av. 1m at 6g/t along 3km strike – all holes intersected the Mutotolwa gold structure. Total 2.3km strike at 4.5g/t over 1.33m As a rule of thumb, these Mutotolwa S strike length 4

  8. Slide 8: Project Summary

    Project Summary For personal use only  Ready to establish a small-scale gold mine, in parallel with resource definition  Gold project located in Tanganyika Province, south eastern DRC.  70% interest in 2 Prospecting Rights covering 680km2, potential to increase to increasing to 85%.  Sufficient

Prospect Resources — Investor Presentation (April 2016) on 6ix