Morocco Strategic Minerals Corporation · TSXV:MCC
Morocco Strategic Minerals — Investor Presentation (July 2025)
22 slides from Morocco Strategic Minerals's investor presentation, July 2025
Slide 1: Exploring Morocco's Next Copper Discovery
EXPLORING MOROCCO'S NEXT COPPER DISCOVERY CORPORATE PRESENTATION | JULY 2025 TSX-V | MCC
Slide 2: Forward Looking Information
FORWARD LOOKING INFORMATION This document contains forward looking statements, which reflect the current Although the Company believes that the assumptions used in the forward-looking expectations of the Company as at the date hereof with respect to future events. statements are reasonable, the read
Slide 3: Key Highlights of Mining in Morocco
KEY HIGHLIGHTS OF MINING IN MOROCCO Morocco is a leading producer of phosphate, holding over 70% of global reserves. Phosphate exports: Account for 25% of Morocco's total exports. Employment in mining sector: over 40,000 direct jobs. As Africa's leading primary silver-producing country, Morocco is h
Slide 4: A Proven Track Record of Success in Moroccan Mining
A PROVEN TRACK RECORD OF SUCCESS IN MOROCCAN MINING Our team’s direct, hands-on experience in revitalizing a major Moroccan mine provides the company with core capabilities in: Guy Goulet, President & CEO • Recognizing & Advancing high- potential mineral assets. As the founder and the former CEO of
Slide 5: Share Structure
Capital Raise Morocco Strategic Minerals closes a private placement for a total amount of $1,000,000. Tifernine Agreement Morocco Strategic Minerals enters into an option agreement to acquire a 100% interest in the Tifernine copper project. Share Structure SHARES OUTSTANDING 128,886,343 (Basic) WARR
Slide 6: Strategically Located in Morocco's Prolific Anti-Atlas Mineral Belt
STRATEGICALLY LOCATED IN MOROCCO'S PROLIFIC ANTI-ATLAS MINERAL BELT MSM's projects, including Timarighine , BMR and Tifernine are situated in a well-endowed geological region with a history of significant silver, copper, and gold production, demonstrating strong potential for new discoveries. CORE A
Slide 7: Timarighine Project: High-Grade Copper in a Proven District
TIMARIGHINE PROJECT HIGH-GRADE COPPER IN A PROVEN DISTRICT KEY PROJECT HIGHLIGHTS GEOLOGY & MINERALIZATION High-Grade Discovery Favorable Geology Initial grab samples confirm up to 16.16% Mineralization is hosted in classic vein and copper in high-grade sulfide zones. stockwork zones, characterized
Slide 8: Timarighine Project Rapid Progression
TIMARIGHINE PROJECT RAPID PROGRESSION ACQUISITION PHASE 1 DRILLING November 13, 2024 Mid-June, 2025 Mid-June, 2025 Enters option agreement to Successful surface work A fully-funded, 1,700m acquire 100% interest in the discovers a high-grade, near- maiden drill program Timarighine copper project. sur
Slide 9: Timarighine Phase Drill Map
TIMARIGHINE PHASE 1 DRILL MAP DDH (DIAMOND DRILLING) For assessing deep structures. Drilling The project will be advanced through a structured, two-phased drill program. Phase One (Target Testing) Lower-risk, focused drill program to test the highest-priority targets and confirm geology. Phase Two (
Slide 10: Timarighine RC Drilling
TIMARIGHINE projected mineralized body RC (REVERSE CIRCULATION) For shallow testing of low-grade, high-tonnage potential. 0 5 km 10 CORPORATE PRESENTATION
Slide 11: BMR Project: Polymetallic Discovery & Drill-Ready Potential
BMR PROJECT POLYMETALLIC DISCOVERY & DRILL-READY POTENTIAL HIGH-GRADE DISCOVERY • Initial 67 grab samples show an average grade of 2.82% Copper. • Significant gold assays, with 58.2% of samples exceeding 0.1 g/t gold. EXCELLENT INFRASTRUCTURE & LOCATION • Located less than 8 km from a 1,000-ton-per-
Slide 12: BMR Project
BMR PROJECT Sampling confirmed a robust polymetallic system with: • High-Grade Peaks: up to 9.33% Cu. • Consistent Average Grades: 2.82% Cu and 0.18 g/t Au across all 138 samples. • Widespread gold mineralization confirmed, 58.2% of the grab samples are at or above 0.10 g/t gold. Ag g/t Au g/t Cu %
Slide 13: BMR Project Samples Map
BMR PROJECT SAMPLES MAP The main zone of mineralization varies from 0.5 m to 3.0 m in width (locally reaching over a 5.0 m width). 13 CORPORATE PRESENTATION
Slide 14: Tifernine Project
TIFERNINE PROJECT KEY PROJECT HIGHLIGHTS • Located southeast of Ouarzazate, covering 16 km² with direct access via national road N9 • Just 10 km from the BMR Project, offering logistical synergies • Situated in Ediacaran-aged rhyolitic and andesitic volcanic rocks, intersected by ENE-WSW faults • Ho
Slide 15: BMR & Tifernine Location
Bmr & Tifernine location BMRs & Tifernine property's locations are approx. 8-10 km by road from a producing 1,000-ton-per-day flotation plant. 0 5 km 15 CORPORATE PRESENTATION
Slide 16: Board of Directors
BOARD OF DIRECTORS Guy Goulet David Shaw PRESIDENT & CHIEF EXECUTIVE OFFICER, DIRECTOR PHD Mr. Goulet graduated from Ecole Polytechnique de Montréal in 1986 in geological Mr. Shaw brings in excess of four decades of experience in the technical and financial sectors of the engineering. He has been ac
Slide 17: Management & Advisory Board
MANAGEMENT & ADVISORY BOARD Robert Boisjoli Dr. Abdelhalek Al Ansari CFO COUNTRY MANAGER (MOROCCO) Mr. Robert Boisjoli, is a Fellow Chartered Professional Accountant, with over Mr. Alansari is a seasoned geologist with over 40 years of experience in the mining sector. He graduated from Cadi 30 years
Slide 18: Option Agreement
OPTION AGREEMENT Property BMR TIFERNINE TIMARIGHINE Initial Payment $25,000 $25,000 $50,000 Y1 Exploration $50,000 $50,000 $150,000 First Anniversary Payment $30,000 $30,000 $75,000 Y2 Exploration Commitment $75,000 $75,000 $200,000 Second Anniversary Payment $45,000 $45,000 $75,000 Y3 Work Commitme
Slide 19: Other Non-Core Assets
OTHER NON-CORE ASSETS Gold and lithium exploration in the James-Bay region, Quebec (previously Genius Metals inc.) 1. Sakami Property 2. Lithium381 Project 19 CORPORATE PRESENTATION
Slide 20: Sakami Property Gold Potential
SAKAMI PROPERTY GOLD POTENTIAL Geology • The property is straddling more than 40km of the geological contact between the Opinaca and La Grande subprovinces. This contact is associated with numerous gold occurrences, including the Éléonore Gold Mine operated by Newmont (8m Oz Au). • North of Sakami,
Slide 21: Lithium381 Proven Lithium District
LITHIUM381 PROVEN LITHIUM DISTRICT Property Location • 1107 ha land position contiguous to Allkem Limited’s James Bay Lithium Mine (formerly Galaxy Lithium’s Cyr Project). • Allkem is scheduled to begin construction in 2023 with an estimated 19 year mine life. • Located 3 km from the KM381 service f
Slide 22: www.moroccosm.com
MORQCCO STRATEGIC MINERALS WWW.MOROCCOSM.COM