Raise Production Inc

Raise Production — Investor Presentation (March 2019)

18 slides from Raise Production's investor presentation, March 2019

  1. Slide 1: The Next Revolution in Oil and Gas

    Raise Production Inc. The Next Revolution in Oil and Gas

  2. Slide 2: Optimizing Productivity

    Optimizing Productivity Multi-stage In the past decade horizontal drilling and multi-stage fracking has revolutionized the energy industry providing fracking optimum flow of oil and gas out of well bores. helps The next great innovation to maximize capital efficiencies and profitability in productio

  3. Slide 3: Horizontal Realities

    Horizontal Realities Horizontal wells are commonly represented as flat While wells have transitioned from a vertical profile The reality of horizontal well profiles is vastly different to a undulating horizontal profile, the mechanical lift put on wells has undergone virtually no change, thereby ign

  4. Slide 4: Natural Phase Flow Biases

    Natural Phase Flow Biases Gas Oil Water Common representation Actual of horizontal well horizontal well Vertical well The natural biases of phase flow (oil, gas and water flow) have material negative implications to producers in terms of production declines. Solution gas drive reservoirs have a natu

  5. Slide 5: High Angle Lift Solutions (HALS)

    High Angle Lift Solutions (HALS™) Divide the Wellbore Vertical & Build Solutions Horizontal Solutions  High Angle Reciprocating Pump  Mitigate slugging  Land at high angles  Separate fluids prior to pump intake  Land below tangent sections as BHP declines  Deliver high quality fluid to any lif

  6. Slide 6: High Angle Reciprocating Pump

    High Angle Reciprocating Pump Features Gas Mitigation Articulated Plunger  Normally closed valves open on every stoke  Minimum of 15° articulation  Controlled auto tap prevents damage  Solids management wiper system Spring Assisted Valves Flow Tube Extension  Energized to ensure valve will rese

  7. Slide 7: Valve Design

    Valve Design Features (Traveling and Standing Valves) Works at High Angles Prevents Gas Locking  Normally closed guided valves  Positive valve seating  Mechanically opens on every stroke Perfect Seal Spring Assisted  Increases efficiency  In-house tested over 3 million cycles  Exceeds API 11AX

  8. Slide 8: Articulated Plunger

    Articulated Plunger Eliminates Pump Placement Restrictions • Land the pump anywhere (45° - 90°+)  Reduces friction and wear along barrel  Allows pump barrels to be landed in “doglegs”  Solids control  Material and seal selection to suit well conditions

  9. Slide 9: Rod-Driven High Angle Lift Technology Installation

    “Rod-Driven”High Angle Lift Technology Installation Test Well #2: Well Performance w/ Raise's High Angle Lift Soution 20000 63 60 24% PE before install 18000 57 54 Before Raise Install 51 16000 48 52% PE after Install 45 14000 42 39 12000 GOR (scf/bbl) Rate (bbl/d) 36 33 10000 30 27 8000 24 21 18 Af

  10. Slide 10: Horizontal Flow Dynamics

    Horizontal Flow Dynamics The horizontal well profile shown would require new lift techniques (beyond historical vertical pumps) to optimize production including: • Maximizing rate of production • Minimizing rates of production decline Vertical Section • Prioritizing oil production over gas and water

  11. Slide 11: The Raise High Angle Lift Solutions (HALS)

    The Raise High Angle Lift Solutions (HALS) Designed to optimize production over the life of the well and minimize production declines HALS is a low cost option for production optimization that offers high impact improvement in production, free cash flow and profitability Optimize hydrocarbon mix pri

  12. Slide 12: HALS Horizontal Solutions

    HALS™ Horizontal Solutions Controls the Flow Regime COMPUTATIONAL FLUID DYNAMICS

  13. Slide 13: Typical Downhole Completion

    Typical Downhole Completion • Right hand set Tubing Anchor catcher-shear release set at 0-30deg • Tubing swivel allows free rotation of TAC • High Angle RP set at 45-90deg • HALS system set in the Horizontal up to first frack or perforation port

  14. Slide 14: HALS Single Well Case Studies

    HALS Single Well Case Studies HALS can simultaneously improve total BOED, with disproportional change in oil/liquids such that total BOE’s improve at the same time that liquids percentage increases with per unit cash cost reductions. This drives large changes in free cash flow from a small increment

  15. Slide 15: The Future

    The Future Divide the well bore into Vertical and Horizontal flow scenarios that can be controlled. Evolutionary Revolutionary Solution Phase 3 Solution Phase 1 Increase Inflow w/ HZTL Pump High Angle Lift Solution Technology Solution Phase 2

  16. Slide 16: 2017 Deployment Summary

    2017 Deployment Summary 4.5" Casing 2.375" EU Tubing COMPLETION NOTES: . 4 PUMPS ONLY, LOCATED BASED ON GAMMA LOGS 3/4" Sucker rod 2 ACTIVATION CIRCUITS FOR PUMPING PAIRS + PUMPS 1&3 + PUMPS 2&4 NEW FLOW CONTROL EMPLOYED NO SEPARATOR OR PERFORATED TUBING + TUBING CLOSED FROM TOE TO SURFACE + EXCEPTI

  17. Slide 17: Multiple Horizontal System Deployments

    Multiple Horizontal System Deployments  Horizontal Pumping System deployed and retrieved (7) seven times in close tolerance wellbores (4 ½ inch mono bore)  Raise has proven through field testing :  Pumps rated up to 5000 psi working pressure  Reliable Activation  Optimum Pump placement  Multip

  18. Slide 18: Thank You

    Thank You For your time RAISE PRODUCTION THE COMPLETE SOLUTION

Raise Production — Investor Presentation (March 2019) on 6ix