Mink Ventures Corp. · TSXV:MINK

Mink Ventures — Investor Presentation (June 2025)

18 slides from Mink Ventures's investor presentation, Jun 2, 2025

  1. Slide 1: Mink Ventures Corporation

    MINK MINK VENTURES VENTURES CORPORATION CORPORATION A Strategic Canadian Nickel Copper Cobalt Opportunity Timmins Nickel District, Ontario TSXV:MINK www.minkventures.com June 2, 2025

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the future business and operations of Mink. Forward-looking statements a

  3. Slide 3: A Strategic Canadian Battery Metals Opportunity

    A STRATEGIC CANADIAN BATTERY METALS OPPORTUNITY • Successful exploration, and experienced management team • Camp sized polymetallic, critical minerals project adjacent to a past producer • Timmins Nickel District, Ontario - top Canadian mining jurisdiction • Permitted and drill ready nickel, copper,

  4. Slide 4: Experienced Business & Technical Team

    EXPERIENCED BUSINESS & TECHNICAL TEAM Natasha Dixon, President & CEO, Director JC St-Amour, Director Mr. St-Amour has 25+ years of mining industry experience in executive Ms. Dixon has diverse experience in capital markets, facilitating the listing and leadership roles, corporate finance and mergers

  5. Slide 5: Capitalization

    CAPITALIZATION (as at June 2, 2025) • Issued & Outstanding: 25,678,888 • Stock Options: 2,019,045 • Warrants: 12,160,739 @ $0.25 2,555,350 @ $0.20 • Fully Diluted: 42,414,022 • Management & Directors – 15% TSX.V: MINK MINK VENTURES CORPORATION 5

  6. Slide 6: Proximity to Timmins Mining Camp & Infrastructure

    Proximity to Timmins Mining Camp & Infrastructure TSX.V: MINK MINK VENTURES CORPORATION 6

  7. Slide 7: Montcalm Project

    MONTCALM PROJECT • ~100 km2 in prime Ontario location, approximately 55 km west of Timmins • Adjacent to Glencore’s Montcalm Mine - past production 3,931,610 tonnes of ore grading 1.25% Ni, 0.67% Cu and 0.051% Co (Ontario Geological Survey, Atkinson, 2010) • According to an estimate dated January 20

  8. Slide 8: Montcalm Complex Geology (MGC)

    Montcalm Complex Geology (MGC) • Mink controls two of the most highly prospective portions of the MGC: Including 10 km2 of the Gabbro Phase of the MGC, which hosts the Montcalm Mine, as well as 11 km of strike length of the ultramafic unit (peridotite/ dunite) horizon, considered highly prospective

  9. Slide 9: Analogy to Montcalm: Lynn Lake

    ANALOGY TO MONTCALM: LYNN LAKE “A” GABBRO MULTIPLE DEPOSITS • Lynn Lake “A” Gabbro Intrusive and Mink’s Montcalm Project are distinctly similar geologically, and potential exists for the discovery of multiple deposits at the Montcalm Project similar to that found at the Montcalm Mine itself and at L

  10. Slide 10: Montcalm Property Compilation

    Montcalm Property Compilation • Map includes MINK’s new drill targets, historical drilling, geology, historical EM, surface IP, superimposed on regional magnetic data • Previous operators demonstrated there is not always an EM conductor with mag and mineralization, as seen at hole MAC97-31 on the mi

  11. Slide 11: Montcalm Airborne Gravity Compilation

    Montcalm Airborne Gravity Compilation • Targets, historical drilling, geology and historical EM, superimposed on gravity data. • Note the strong gravity response in Hook Zone Magnetic Target • Note 3D Borehole IP resistivity low from 500 meter elevation projected to surface on flank of gravity anoma

  12. Slide 12: Exploration Plans for Montcalm include:

    Exploration Plans for Montcalm include: Drill test coincident Borehole IP and VTEM Composite Plans/Sections above with Proposed Borehole at -88 Degrees • Continue phase 2 and 3, 3D borehole IP surveys in Hook Zone. • Complete airborne gravity survey and VTEM survey. • Test priority drill targets. TS

  13. Slide 13: Warren Nickel Copper Cobalt Project

    WARREN NICKEL COPPER COBALT PROJECT • 100% interest (1.5%NSR) in 14 Patented Mining Claims (red), plus 48 claims added (Warren North, Warren East & Warren Northeast (2%NSR) • 1,130 hectares in Whitesides Township • 35 km west of Timmins Mining Camp • Seven zones of Ni Cu +/- Co mineralization with s

  14. Slide 14: Warren Nickel Copper Cobalt Project

    WARREN NICKEL COPPER COBALT PROJECT • Left - Chargeability Map with Resistivity Lows shown in blue lines across numerous zones • Right – Massive sulphides (0.967% Nickel) from North Zone a priority target for next round of drilling TSX.V: MINK MINK VENTURES CORPORATION 14

  15. Slide 15: Warren Historical Sampling

    WARREN HISTORICAL Zone Trench # Sample Feet Ni ppm Ni % Cu ppm Cu % SAMPLING C Zone C Zone 2 1 Chip Chip 6 3 180 326 0.018 0.0326 1101 1732 0.1101 0.1732 D Zone 4 Chip 30 5000 0.5 D Zone 4 Chip 10 88 0.0088 288 0.0288 Zone Trench # Sample Feet Ni ppm Ni % Cu ppm Cu % D Zone 4 Chip 10 111 0.0111 416

  16. Slide 16: Warren Nickel Copper Cobalt Project 2024

    WARREN NICKEL COPPER COBALT PROJECT 2024 • Compiled all available historical data and • Excellent copper values were noted in the recent geophysical survey data and A Zone trenches; better values ranged completed limited ground truthing of several from 1.075% to 2.08% Cu. Nickel values of targets. i

  17. Slide 17: Warren Nickel Copper Cobalt Project 2025

    WARREN NICKEL COPPER COBALT PROJECT 2025 • The 2024-2025 season focus was on continuing to test mineralized surface zones associated with IP resistivity lows and chargeability highs. Significant zones remain to be tested. • The highlight of the program was the Shaft Zone target which returned 0.429%

  18. Slide 18: Contact Us

    CONTACT US Mink Ventures Corporation Suite 4100-66 Wellington Street West TD Bank Tower, PO Box 35 Toronto Ontario M5K 1B7 www.minkventures.com info@minkventures.com Natasha Dixon 250-882-5620 or Kevin Filo 705-266-6818 TSX.V: MINK MINK VENTURES CORPORATION 18

Mink Ventures — Investor Presentation (June 2025) on 6ix