Prominence Energy Limited · ASX:PRM

Prominence Energy — Sun Resources NL — Investor Presentation (July 2012)

22 slides from Prominence Energy's investor presentation, July 2012

  1. Slide 1: Investor Briefing – July 2012: Growing in the Woodbine Tight Oil Play

    Slide 1: Investor Briefing – July 2012: Growing in the Woodbine Tight Oil Play

    Investor Briefing – July 2012 Growing in the Woodbine Tight Oil Play Matthew Battrick, Managing Director

  2. Slide 2: Growing Acreage in the Woodbine Oil Fairway

    Slide 2: Growing Acreage in the Woodbine Oil Fairway

    GROWING ACREAGE IN THE WOODBINE OIL FAIRWAY Three Transformational Deals in Less than 12 Months  Material working interest in 22,000 acres (14,833 net acres) SUN’S FOOTPRINT IN LEON COUNTY, TEXAS  100% working interest (75% NRI) in 8,347 acres (Delta Oil Project), and growing this position;  In t

  3. Slide 3: Corporate Overview

    Slide 3: Corporate Overview

    CORPORATE OVERVIEW CAPITAL STRUCTURE SHARE PRICE HISTORY Ordinary shares 1, 2 1.15 billion $0.08 Volume Close Price 100,000,000 $0.07 Performance Options 1, 3 510 million $0.06 80,000,000 $0.05 60,000,000 Unlisted Options (various prices) 1, 4 103.2 million $0.04 40,000,000 Market capitalisation (at

  4. Slide 4: Delta Oil Project to Grow

    Slide 4: Delta Oil Project to Grow

    DELTA OIL PROJECT TO GROW  Sun Resources and Carina Energy LLC (the Delta Project Vendor) have agreed to grow the Delta and adjacent project areas beyond the original 10,000 acre target  Following completion of recently announced transactions, Sun will have an interest in 22,000 gross acres, and i

  5. Slide 5: The Woodbine Oil Play

    Slide 5: The Woodbine Oil Play

    THE WOODBINE OIL PLAY Favourable Characteristics  Substantial vertical production history has, to a large extent, de-risked the Woodbine tight oil play  Horizontal wells have obtained significant oil HORIZONTAL DEVELOPMENT production at relatively shallow depths - ~6,000‟ laterals  Multi-stage fr

  6. Slide 6: Delta, Amerril & Richland Oil Projects

    Slide 6: Delta, Amerril & Richland Oil Projects

    DELTA, AMERRIL & RICHLAND OIL PROJECTS Potential in Multiple Stacked Horizons Initially focused on exploiting the Woodbine horizon, however significant potential exists in seven “Fraccable” pay intervals: Horizon Avg. Depth 1 Austin Chalk 5,600 feet 2 Sub-Clarksville 5,700 feet 3 Upper Eagle Ford Sh

  7. Slide 7: Woodbine Production – Single Well Type Curve

    Slide 7: Woodbine Production – Single Well Type Curve

    WOODBINE PRODUCTION – SINGLE WELL TYPE CURVE Note: Low initial decline rates Source: Crimson Exploration Inc, Presentation to RBC Global Energy and Power Conference, June 2012 7

  8. Slide 8: Intense Industry Interest in the Woodbine

    Slide 8: Intense Industry Interest in the Woodbine

    INTENSE INDUSTRY INTEREST IN THE WOODBINE Sun Is A First Mover on the ASX… 8

  9. Slide 9: Delta Oil Project - Local Infrastructure

    Slide 9: Delta Oil Project - Local Infrastructure

    DELTA OIL PROJECT - LOCAL INFRASTRUCTURE Energy Corridor – I45 Existing vertical oil production Infrastructure on site in 26 days Rig drilling 6,000 ft lateral in Woodbine 9

  10. Slide 10: Local Activity

    Slide 10: Local Activity

    LOCAL ACTIVITY Surrounded by Significant Oil & Gas Fields Delta Oil Project oil lease areas Buffalo Oil Field Sub-Clarksville sand Amerril Oil Project lease areas Richland Oil Project lease area Encana Gresham Alabama Ferry: Eaglebine Lateral: 30 40mmbbl Oil in day IP = 260bopd Glen Rose Fm Halcon p

  11. Slide 11: Watch This Space

    Slide 11: Watch This Space

    WATCH THIS SPACE The Value of Sun’s Leases is Growing RECENT NEWS FROM THE WOODBINE 26 August 2011 Sun announce acquisition of 100% WI in up to 10,000 acres in the Delta Oil Project Crimson Exploration spud its 1st Woodbine well (Mosley #1H), and announce capital spend of $74 4 January 2012 million

  12. Slide 12: Drilling Commencing in August 2012

    Slide 12: Drilling Commencing in August 2012

    DRILLING COMMENCING IN AUGUST 2012 Strategic Test Well adjacent to Delta Amerril Project Areas  The Gresham A #1H well is currently producing BEELER #1 WELL – TO SPUD IN AUGUST 2012 approximately 600bopd  Sun interpret the Beeler #1H well location has having  Binding farm-in with Richland and Ame

  13. Slide 13: Beeler #1 Well

    Slide 13: Beeler #1 Well

    BEELLER #1 WELL Proposed Beeler #1H well location and lease layout Sun Delta leases (100%WI) Buffalo Amerril/ Sun leases (50:50) Proposed horizontal Beeler #1H well Jewett Richland (50%) Amerril (25%) Sun (25%) 1360 acres Centerville Halcon US$500m Amerril/PMO Oil Field purchase Marquez Leona Outlin

  14. Slide 14: Beeler #1 Well

    Slide 14: Beeler #1 Well

    BEELER #1 WELL SUN resourcesz Beeler #1H well: drill, log, stimulate and complete Proposed Measured Depth: 13,500ft Proposed True Vertical Depth: 7,000ft Geological Objectives: Drill to Georgetown Formation, obtain full log suite, deviate to drill a 6,500ft lateral extension in the Woodbine in a sou

  15. Slide 15: Sun Resources' Woodbine Road Map

    Slide 15: Sun Resources' Woodbine Road Map

    SUN RESOURCES‟ WOODBINE ROAD MAP Delivering on Stated Objectives Phase 1 Phase 2 Phase 3  Conclude acquisition of  Drill horizontal appraisal  Commence development up to 10,000 acres in the well(s) – 1st well, August drilling Delta Oil Project - 2012  Continue building Targeting 3Q 2012  Consid

  16. Slide 16: Why Sun Resources & Why Now?

    Slide 16: Why Sun Resources & Why Now?

    WHY SUN RESOURCES & WHY NOW?  Material exposure to the Woodbine oil play, with plans to grow  Large > 14,833 net acres position (and growing), on trend with proven horizontal production  Peers achieving +1,000 boepd initial production (i.p.) with up to 800bopd, 30- day i.p.  Significant value to

  17. Slide 17: Disclaimer

    Slide 17: Disclaimer

    DISCLAIMER This document has been prepared by Sun Resources NL (“Sun”) for the purpose of providing a company and technical overview to interested analysts/ investors to enable recipients to review the business activities of Sun. This presentation is this by its nature limited in scope and is not in

  18. Slide 18: Appendix 1: Industry Research

    Slide 18: Appendix 1: Industry Research

    APPENDIX 1: INDUSTRY RESEARCH  Organic-rich, laminated sand above Buda  Well cost = US$5.5 to US$6.5 million  ~40% silica and clastics = natural fractures  Spud to Production = 60 to 90 days  Geologically equivalent to EFS in South Texas  Well Spacing = 160 acres (down from 320 acres)  Modern

  19. Slide 19: Appendix 2: Potential in Multiple Stacked Horizons

    Slide 19: Appendix 2: Potential in Multiple Stacked Horizons

    APPENDIX 2: POTENTIAL IN MULTIPLE STAKED HORIZONS 19

  20. Slide 20: Appendix 3: Beeler #1H Well

    Slide 20: Appendix 3: Beeler #1H Well

    APPENDIX 3: BEELER #1H WELL Vertical Well A Vertical Well B Vertical Well C Outlines are diagrammatic only Proposed Beeler #1H well Vertical well B Gresham A #1H Vertical well A Vertical well C Sun Delta leases Amerrill/Sun leases Richland/ Amerril/Sun Farmin -1360 acres Halcon US$500m Amerril/PMO O

  21. Slide 21: Appendix 4: Presence of Hydrocarbons

    Slide 21: Appendix 4: Presence of Hydrocarbons

    APPENDIX 4: PRESENCE OF HYRDROCARBONS 21

  22. Slide 22: Sun Resources NL contacts

    Slide 22: Sun Resources NL contacts

    Matthew Battrick John Kenny Managing Director Non-Executive Director Sun Resources NL Sun Resources NL Suite 16, Subiaco Village t: (+61) 8 9338 6501 Suite 16, Subiaco Village t: (+61) 8 9338 6501 531 Hay Street m: (+61) 416 111 298 531 Hay Street m: (+61) 403 347 171 SUBIACO, WA 6008 f: (+61) 9388

Source: Internet Archive copy of prominenceenergy.com.au

More decks from Prominence Energy Limited

All 32 Prominence Energy decks