Drc Gold Corp. · CSE:DRC
Drc Gold — AJN Resources — Investor Presentation (June 2025)
20 slides from Drc Gold's investor presentation, June 2025
Slide 1: Investor Presentation
INVESTOR PRESENTATION June 2025 CSE: AJN | Frankfurt: 5AT
Slide 2: Disclaimer
DISCLAIMER This presentation includes “forward-looking statements,” within the meaning of the U.S. Securities Act of 1933, as amended and the U.S. Securities Exchange Act of 1934, as amended, or the “Exchange Act.” Forward-looking statements are not based on historical information and include, witho
Slide 3: Reasons to Invest
REASONS TO INVEST AQUIRING DRILLING AJN acquiring the highly prospective Okote Gold Project in Southern Ethiopia; Diamond and Reverse Circulation Drilling completed on PR 15282; on strike to the ~4.5moz Lega Dembi mine 60km to the north. 1,500m of due diligence Diamond Drilling planned for Okote on
Slide 4: Corporate Structure
CORPORATE STRUCTURE Capitalisation Data(1) Last 12 Months Share Price Performance(1) Share Price C$ 0.11 Volume (1000's) C$/share Basic S/O(2) M 64.7 0.25 100 Market Cap C$M 7.1 90 Cash C$M 0.4 0.20 80 70 Board and Management 0.15 60 Klaus Eckhof Chief Executive Officer & President 50 Mark Gasson Di
Slide 5: Board and Management
BOARD AND MANAGEMENT KLAUS MARK SHEENA ECKHOF GASSON ECKHOF DIRECTOR, PRESIDENT & CEO DIRECTOR, PRESIDENT & CFO DIRECTOR & INVESTOR RELATIONS Mr. Eckhof is a geologist with more than 30 years of Mr Gasson is a geologist with 38 years of experience and experience developing mineral deposits throughou
Slide 6: AJN Acquires Gold in Ethiopia
AJN ACQUIRES GOLD IN ETHIOPIA Okote Location within the Arabian-Nubian Shield • AJN can acquire 70% of the 42.8km2 Okote Gold Project, Oromio State, southern Ethiopia – JV with Godu General Trading S.C. (Godu) • The Okote project lies in the Adola Gold Belt within 100km of the ~4.5 Moz Lega Dembi go
Slide 7: Okote Gold Project (Historic Drilling)
OKOTE GOLD PROJECT (HISTORIC DRILLING) Geology & Drilling Results of the Okote Gold Project • 13,761 metres of historic drilling over a strike length ~2,400m - largest concentration over the northern 1,000m x 400m • Significant results included: – BH1100N/1 : 18.13m at 3.25g/t Au, 25.05m at 3.82g/t
Slide 8: Deal Terms to Acquire a 70% Interest in the Okote Gold Project
DEAL TERMS TO ACQUIRE A 70% INTEREST IN THE OKOTE GOLD PROJECT Okote <60km from 4.5Moz Lega Dembi • AJN can acquire an initial 60% in the Okote Gold Project on the following terms: • Conduct a 90-day due diligence which can be increased by 60 days - includes drilling of a minimum of 1,500m. • On com
Slide 9: State Gold Projects
STATE GOLD PROJECTS CONGO RESOURCES SAU Gold Applications in the Kilo-Moto Belt • MoU signed with Congo Ressources SAU (CRS) (State owned subsidiary) - AJN to acquire 100% interest in 21 gold exploration permits (AJN to transfer of 60% of its share capital to the State on transfer of all licences to
Slide 10: Moku-Beverendi Project
MOKU-BEVERENDI PROJECT • An advanced project bordering on Barrick/AngloGold Location of the Moku-Beverendi Project Ashanti’s Kibali Gold Mine • AJN negotiating five exploitation permits covering ~1,260km2 • Similar geology to neighbouring Barrick/AngloAshanti Kibali deposits – Kibali mineral trend c
Slide 11: Zani Kodo Project
ZANI KODO PROJECT Zani Kodo Project Area • Located in Kilo-Moto Greenstone Belt in Ituri Province, eastern DRC – hosts Kibali Mine & Mongbwalu multi-million ounce resources • Explored extensively by Mwana Africa – includes ~38,000m of drilling • Previous exploration identified the 9km “Zani Kodo Tre
Slide 12: Zani Kodo Mineral Resources
ZANI KODO MINERAL RESOURCES Geology and Prospect Map at Zani Kodo • Mineral Resource Estimate conducted at Kodo, Badolite and Zani Central in February 2012 - Bloy Resource Evaluation1 • Total of 2,012,287Oz of gold in Inferred and Indicated Categories (0.5g/t cut-off) Deposit Category Tonnes Au (g/t
Slide 13: Zani Kodo Project Upside
ZANI KODO PROJECT UPSIDE Cross section Across Kodo Prospect • Less than 50% of the 9km Zani-Kodo trend has been drilled. • Significant soil anomalies have been defined for follow up with future exploration. • Grade of mineralisation appears to increase with depth at the Kodo Prospect – 24m at 10g/t
Slide 14: AJN's Lithium Projects in Eastern DRC
AJN’S LITHIUM PROJECTS IN EASTERN DRC Kabunda South & Manono NE Project Areas • AJN has the option to acquire 75% interests in PR 15383 & PR 15623 (Kabunda South Project) & 70% interest in PR 15282 (Manono NE Project) • Kabunda South Project lies along the southern boundary of the broader LCT pegmat
Slide 15: Kabunda South Project
KABUNDA SOUTH PROJECT Permits PR 15383 & PR 15623 • Spodumene visually identified within pegmatites identified across the full 11km strike extent of PR 15383 & PR 15623 • Two priority target areas identified for drilling: – 1.5km of pegmatite identified in the northern permit area (widths of 50m - 2
Slide 16: Manono Northeast Project
MANONO NORTHEAST PROJECT • Sandy overburden generally thicker than 6m on PR 15282 • Similar setting which led to the discovery of the Manono pegmatites – identified once alluvial tin mining reached deeper levels • Alluvial tin workings and pegmatitic boulders identified on PR 15282 • Grab samples re
Slide 17: Manono Northeast Project
MANONO NORTHEAST PROJECT Permit PR 15282 • 15 RC holes for 982m, 2 diamond holes for 282m and 83 rotary air blast (RAB) holes for 1,313m were completed PR 15282 • RC and diamond drilling tested 2km of potential extension of the Manono pegmatites at three locations. • Diamond drilling identified an 8
Slide 18: Deal Terms
DEAL TERMS • Kabunda South PR 15383 (AJN can acquire a 75% project interest) – Payment of US$130,000 – Issue of 6,000,000 common shares in the capital of AJN to MEK and/or its Nominees • Kabunda South PR 15623 (AJN can acquire a 75% project interest) – Payment of US$130,000 – Issue of 5,000,000 comm
Slide 19: Lithium Salt Wells Project
LITHIUM SALT WELLS PROJECT • AJN has an option to acquire 100% of the Salt Wells property from Great Basin Oil LLC in Nevada • Nevada has the only currently producing lithium mine in the United States • The mine, located near Silver Peak, Nevada, has produced from lithium brines since 1967 • Product
Slide 20: Thank You
THANK YOU For more information please contact: SHEENA ECKHOF DIRECTOR M: +44 7469 291 547 E: sheena@eckhofconsulting.com ajnresources.com C S E : A J N | F R A N K F U R T: 5 AT