  1. Slide 1: Developing Two Quality Hard Rock Lithium Deposits in Western Australia

    FEBRUARY 2019 ASX : LTR Developing Two Quality Hard Rock Lithium Deposits in Western Australia RESOURCES RISING STARS SUMMER SERIES 1

  2. Slide 2: Important Information

    Important Information Forward Looking Statements This Presentation may include statements that could be deemed “forward-looking statements”. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guaran

  3. Slide 3: Next Generation Lithium Producer

    Next Generation Lithium Producer 1 Kathleen Valley Lithium Project Projects strategically located in the lithium-rich Eastern Goldfields region of Western Australia Maiden Mineral Resource: 21.2Mt @ 1.4% Li2O and 170ppm Ta2O5 • 75% Measured and Indicated • Located on granted mining leases • Close to

  4. Slide 4: Kathleen Valley Lithium Project

    KATHLEEN VALLEY LITHIUM PROJECT WESTERN AUSTRALIA 4

  5. Slide 5: Scoping Study Supports Potential To Develop A Standalone Lithium Mining and Processing Operation

    Scoping Study Supports Potential To Develop A Standalone Lithium Mining and Processing Operation Base Case 2Mtpa (Li & Ta) NPV(8%, real, post tax) A$421M (Range of A$316 to A$526M) IRR 38% Open Pits Payback <3 years Mine Life 9 years Average LOM Opex ~A$428/t conc. (net of Ta credits) Annual Product

  6. Slide 6: Financial Sensitivity – Robust Project

    Financial Sensitivity – Robust Project Kathleen Valley Project - NPV Sensitivity Analysis (A$M) A$421M Base Case Spodumene Base Case Price (US$550-750/t) 253 588 Exchange Rate (AUDUSD$0.80-0.64) 301 571 Li Grade Flex (+/-10%) 323 518 Operating Cost Flex (+/-15%) 331 510 Li Recoveries (74-84%) 358 48

  7. Slide 7: Cash Flow Profile <3 Year Payback Period

    Cash Flow Profile <3 Year Payback Period A$M A$ Revenues and Net Cashflows (After Tax) 1,000 800 600 400 200 - Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 (200) Revenue A$m (400) Net cashflow after tax A$m Cumulative net cashflow after tax A$m Scoping study suggests Life of Mine free cash flow of ~A$762M 7

  8. Slide 8: Cash Flow Per Year

    Cash Flow Per Year Scoping study suggests average free cash flow of >A$100M per year A$M Net Cashflow After Tax A$M per Year 200 150 100 50 0 Y1 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 -50 -100 -150 -200 -250 -300 8

  9. Slide 9: Resources and Mining

    Resources and Mining Global resource 21.2Mt @ 1.4% Li2O and 170ppm Ta2O5 75% Measured and Indicated Scoping study Production Target of 15.7Mt @ 1.26% Li2O and 154ppm Ta2O5 Open pits largely constrained by limit of data Conventional open pit mining and processing Favourable location close to establis

  10. Slide 10: Metallurgy And Flowsheet – Preliminary Test Work Confirms a Saleable Li2O Concentrate

    Metallurgy And Flowsheet – Preliminary Test Work Confirms a Saleable Li2O Concentrate Can Be Produced Key outcomes • 5.9% Li2O from DMS conc. • 36% mass rejection from 2-stage DMS • 5.5% Li2O from flotation • Low iron (<0.5% Fe2O3) • Predicted 79% Li2O recovery • Preliminary Ta2O5 conc. Preliminary

  11. Slide 11: Next Steps – Unlocking Further Value

    Next Steps – Unlocking Further Value Resource Growth : • ~16,000m RC drilling program in progress • Testing immediate extensions of block model KATHLEEN’S CORNER (NW) • Targeting additional 8.5 – 16Mt @ 1.2 – 1.5% Li2O* • Potential to significantly increase mine life Metallurgy MT MANN • Optimise un

  12. Slide 12: High Grade Compared With Most Peers - Plus Potential to Grow

    High Grade Compared With Most Peers - Plus Potential to Grow 2019 2018 Development Production * Resources as at 24 January 2019 (Sourced from company websites) 12

  13. Slide 13: Recent Metallurgical Drilling Confirms Continuity of Geological Model

    Recent Metallurgical Drilling Confirms Continuity of Geological Model Development Production Grades appear to be increasing with depth 13

  14. Slide 14: Investment Case

    Investment Case Robust, high grade resource First world location and expertise Active, well serviced mining region Conventional mining and processing Resource upside – 16,000m RC drilling program in progress Strong focus on optimising recoveries – further test work in progress Very experienced, well

  15. Slide 15: Buldania Lithium Project

    BULDANIA LITHIUM PROJECT WESTERN AUSTRALIA 15

  16. Slide 16: Buldania Is Strategically Located in a Lithium-rich Mineral Province

    Buldania Is Strategically Located in a Lithium-rich Mineral Province Outcropping, fresh, spodumene-related mineralisation Mineralisation at Anna extended to the Mt Marion – 71Mt SE under shallow cover – strike length @1.4% Li2O >1.3km and open Similar geology to the Mt Marion and Bald Hill lithium d

  17. Slide 17: Large Lithium (Spodumene) Mineralised Pegmatite Defined at the Anna Prospect

    Large Lithium (Spodumene) Mineralised Pegmatite Defined at the Anna Prospect Mineralisation fresh from surface and open along strike and at depth 13m @ 1.0% Li2O 29m @ 1.3% Li2O incl. 9m @ 1.7% Li2O 25m @ 1.2% Li2O Drill section incl. 5m @ 2.0% Li2O 32m @ 1.1% Li2O incl. 9m @ 1.3% Li2O 58m @ 1.2% Li

  18. Slide 18: Drilling Extends Mineralisation At Anna To South East – System Remains Open

    Drilling Extends Mineralisation At Anna To South East – System Remains Open NW Anna Long Section (Looking NE) SE 13m @ 1.0% Li2O 39m @ 1.6% Li2O 14m @ 1.7% Li2O incl. 13m @ 2.1% Li2O incl. 11m @ 2.0% Li2O 30m @ 1.4% Li2O 32m @ 1.1% Li2O incl. 9m @ 1.6% Li2O incl. 9m @ 1.3% Li2O 25m @ 1.2% Li2O incl.

  19. Slide 19: Buldania is Part of a Large (~650km2) Land Position Highly Prospective For Lithium

    Buldania is Part of a Large (~650km2) Land Position Highly Prospective For Lithium KILLALOE PROJECT • 163km2 area located immediately north west of the Buldania Project – covers strike extension of Anna trend • ~20km strike length of prospective stratigraphy • Multiple spodumene-bearing pegmatites u

  20. Slide 20: Catalysts for Re-Rating

    Catalysts for Re-Rating Kathleen Valley Lithium Project Buldania Lithium Project Strong news flow 04 Maiden Mineral Resource: Q2/Q3 2019 Resource Upgrade: 05 Regional Q1/Q2 2019 exploration and discovery drilling Metallurgical studies Progressing towards 06 focused on optimising Scoping Study grade

  21. Slide 21: A Proven, Experienced Board / Corporate Snapshot

    A Proven, Experienced Board DAVID RICHARDS TIM GOYDER CRAIG WILLIAMS ANTHONY CIPRIANO STEVE CHADWICK Managing Director Chairman Non-Executive Director Non-Executive Director Non-Executive Director • +35 years • +40 years • +40 years • +30 years • +40 years experience experience experience experience

  22. Slide 22: Connect

    EMAIL WEBSITE: OFFICE PHONE NUMBER info@ltresources.com.au www.ltresources.com.au Level 2, 1292 Hay St 08 9322 7431 West Perth WA 6005 CONNECT https://au.linkedin.com/company/liontown-resources-limited https://twitter.com/LiontownRes 22

  23. Slide 23: Appendix

    APPENDIX Kathleen Valley Project Additional Information 23

  24. Slide 24: Scoping Study – Key Parameters And Assumptions

    Scoping Study – Key Parameters And Assumptions Parameter Parameter General and Economic Cost Assumptions Discount rate (real, post tax) 8% LOM average open pit mining A$37.72 costs ($/t ore mined) Spodumene concentrate price US$650 per tonne FOB LOM average processing cost Tantalum concentrate price

  25. Slide 25: Scoping Study – LoM Financials And Capital Expenditure

    Scoping Study – LoM Financials And Capital Expenditure Life of Mine Financials Capital Costs Summary A$M Main Area Capital (A$M) Revenues 2,802 Treatment Plant 82.8 Operating costs (1,236) Reagents & Plant Services 9.5 Infrastructure – general 39.9 Capital expenditure Mining 6.1 - pre-production (23

  26. Slide 26: Scoping Study – Production And Costs

    Scoping Study – Production And Costs Production and Costs 400 800 701 350 660 700 300 570 600 616 537 520 525 Conc. Production (kt) Opex (A$t/conc) 250 552 468 500 468 391 200 434 433 438 400 377 293 150 300 310 100 200 191 50 100 169 348 351 357 356 372 355 356 149 - - Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 S

  27. Slide 27: Scoping Study – Grade Profiles

    Scoping Study – Grade Profiles LOM Lithium and Tantalum Grade Profile 1.60% 189 200 174 169 180 1.40% 163 156 160 Lithium Grade (%Li2O) Tantalum Grade (ppm Ta2O5) 1.20% 142 142 133 133 140 1.00% 120 0.80% 100 1.42% 1.26% 1.26% 1.32% 1.26% 1.26% 0.60% 1.23% 1.24% 80 1.20% 60 0.40% 40 0.20% 20 -- - -

  28. Slide 28: Scoping Study – Production Classification

    Scoping Study – Production Classification Production Classification by Year 2.5 50% 45% 2 40% 35% 1.5 30% Tonnes (Mt) 25% 1 20% 15% 0.5 10% 5% 0 0% Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Unclassified Inferred Indicated Measured Percentage Inferred 28

  29. Slide 29: Exploration Target Parameters and Assumptions

    Exploration Target Parameters and Assumptions Kathleen’s Corner Kathleen’s Corner Parameter Mt Mann Rationale (NW) (SE) Combined strike 700 – 800m 300 200 length of pegmatites Based on previous drilling and extrapolation of Average cumulative block model used in 12 – 20m 12 -18m 10 - 15m true width

  30. Slide 30: Liontown

    Liontown W @LiontownRes in liontown-resources-limited € www.I|tresources.com.au