Lydian International Limited

Lydian International — Investor Presentation (April 2010)

19 slides from Lydian International's investor presentation, April 2010

  1. Slide 1: Lydian International – April 2010

    WWW.LYDIANINTERNATIONAL.CO.UK April 2010

  2. Slide 2: Forward Looking Statements

    2 FORWARD LOOKING STATEMENTS This presentation contains projections and forward looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of ris

  3. Slide 3: Exploration First Mover Specialists

    3 EXPLORATION FIRST MOVER SPECIALISTS • Flagship asset is Amulsar gold project in Armenia • Lydian grassroots discovery • 1.4Moz inferred gold resource • High recoveries from heap leaching • Resource upside, open in all directions • 25 year mining license granted • Excellent infrastructure • Current

  4. Slide 4: Deposit Endowment

    DEPOSIT ENDOWMENT A Gold deposits{of greater than’ |MOz & Other gold deposits | Copper dominant\deposits © Pb-Zn dominant deposits a Upper Tertiary Au-Pb-Zn-Ag | Lower Tertiary Au-Cu-Mo im TSX: LYD

  5. Slide 5: Armenia

    5 ARMENIA • WTO member, signatory to International Convention on Investment Disputes (ICID) • Exploration and mining investment • Dundee Precious Metals – Kapan underground Au, Cu, Zn mine • Cronimet – Kadjaran Cu, Mo 12Mtpa Mine • Global Gold – Toukhmanuk gold development • Geopromining –Zod Gold a

  6. Slide 6: Amulsar Project

    6 AMULSAR PROJECT • Claimed in early 2006 after recognition of high-sulfidation alteration from the main road • Excellent infrastructure – sealed main road, high-tension power lines, gas and water pipe-line and airstrip • 13,000m drilled in 2008 and 1MOz resource released • April 2009, 25 year Minin

  7. Slide 7: Amulsar

    7 AMULSAR • Lydian discovery of 1.4 million ounce oxide inferred resource (27,000m drilling) • Open in all directions and at depth, new prospects and untested potential • Resource drilling in 2008 • Step-out drilling for resource expansion in 2009 • 2010 program will focus on resource extension, exp

  8. Slide 8: Amulsar Geology

    SS LYDIAN INTERNATIONAL ARSHAK x tobetested | * ms ma > N 4 ~ “muta —} -s AMULSAR GEOLOGY TSX: LYD

  9. Slide 9: Tigranes Cross Section

    9 TIGRANES CROSS SECTION 53m@2.6 125m@1.6 45m@1.0 42m@1.0 106m@2.3

  10. Slide 10: Erato Cross Section

    4,399, 500mN Volcano astic breccias. Porphy ine _2a Fews Vocerves Unditt DDA-030 QP 204-105 (out of Ly RCA- N ~ 8 3 a FJ 2.700mRL ~ oa = 'e } downhole geochemistry Level 250m below surface f Cty 01-05 ppmau a OS-toomas 200 meters mo. 560,500ME £61. 900m= LYDIAN TSX: LYD INTERNATIONAL

  11. Slide 11: Results and Resource

    11 RESULTS AND RESOURCE 2008 (Tigranes) 2009 Amulsar Gold Resource (0.4g/t cut-off), December 2009 CIM Class Tonnes (Mt) Au (g/t) Au (Mozs) Density INFERRED 49.60 0.90 1.43 2.41 • Resource remains open in all directions • High grade extents and geometry yet to be defined with more close spaced drill

  12. Slide 12: Metallurgy

    12 METALLURGY • Recent test work confirms heap leach amenability • Column leach metallurgical tests completed by SGS Minerals Services UK • Recoveries range from 77% to 89% after 70 days • Trajectories indicate that recoveries will increase to >90% with longer time periods • Prior bottle roll tests

  13. Slide 13: Newmont Venture Status

    13 NEWMONT VENTURE STATUS • Newmont Venture agreement terminated March 2010 • Pullback in Region • Short time line to production decision • Lydian purchasing Newmont’s interest for 3 million shares and USD$15M in pre-production payments o $5M payable end April 2010 o $5M payable end 2011 o $5M payab

  14. Slide 14: Exploration Pipeline

    14 EXPLORATION PIPELINE • Lydian maintains a pipeline of promising grass-roots projects and new opportunities with a focus on Armenia and the Caucasus Deposits by age (N=489) No (direct) age region Neogene Paleogene Cretaceous • These include copper and Trias-Jurassic Paleozoic gold targets defined

  15. Slide 15: Kosovo

    15 KOSOVO • Inventory of world-class zinc- lead and silver deposits with three concentrators and a zinc refinery in-country • Long history of mining. Until recently Europe’s largest zinc, lead and silver producer • Newly independent and on track for EU- accession • Modern mining law in compliance wi

  16. Slide 16: Drazhnje

    16 DRAZHNJE • Historic resource • Lydian NI-43101 Inferred Resource: 3.3Mt @ 5.1% Zn, 2.5% Pb

  17. Slide 17: Capital Structure

    17 CAPITAL STRUCTURE Structure Current Shares outstanding 76.83m Total Warrants and options 19.18m Including Directors and Employee warrants and options 1.16m Fully Diluted Shares outstanding 96.02m Market Cap (at CAD 1.00) CAD 76.83m Cash CAD 11.0m Major Shareholders and insiders Current IFC 14.38%

  18. Slide 18: Management Team

    18 MANAGEMENT TEAM Dr Tim Coughlin, (Chief Executive Dr Hayk Aloyan (Managing Director Officer). PhD structural geology; 17-yrs Armenia). PhD Ore Deposit Geology; 10-yrs experience, with wide-ranging international experience, formerly Deputy Chief of experience, held senior positions with major Geol

  19. Slide 19: Non-Executive Board

    19 NON-EXECUTIVE BOARD Mr Gordon Wylie, (Non-Executive Chairman). Grad Dip Mining Engineering, Management Diploma (UNISA); 31-yrs experience, from 1998-2005 as AngloGold-Ashanti’s Global Exploration Manager. Instrumental in developing the company’s “New Frontiers Strategy”, AngloGold-Ashanti’s move

Lydian International — Investor Presentation (April 2010) on 6ix