Aksa Enerji Uretim A.s. · BIST:AKSEN

Aksa Enerji Uretim A.s — 9M 2014 Earnings Presentation

43 slides from Aksa Enerji Uretim A.s's earnings presentation, Jan 16, 2015

  1. Slide 1: Aksa Enerji: The leading IPP in Turkey

    Aksa Enerji The leading IPP in Turkey Earnings Presentation 16 January 2015

  2. Slide 2: Disclaimer

    Disclaimer Aksa Enerji Üretim A.Ş. ("Aksa Enerji") has prepared this presentation material (the “Document”) for the sole purpose of providing information, which includes opinions and estimates and certain forward looking projections and statements relating to Aksa Enerji, the Turkish electricity mar

  3. Slide 3: Key investment highlights

    Key investment highlights 1 Part of a dedicated energy group 2 Second largest Independent Power Producer (IPP) in Turkey 3 Strong exposure to growing Turkish electricity market 4 Large portfolio with 19 operational assets totalling 2,140 MW 5 Diversified pipeline of 10 projects adding 1,507 MW to ou

  4. Slide 4: We are part of a dedicated energy group

    We are part of a dedicated energy group  Entered energy business in 1960s with the production of generating sets  Focused only on the energy sector since then  Gradually expanded into main segments of electricity & natural gas Kazancı Group  Excellent track record in building and integrating ene

  5. Slide 5: We are the second largest IPP in Turkey with 2,140MW installed capacity

    We are the second largest IPP in Turkey with 2,140MW installed capacity IPPs by Installed Capacity 2.548 2.140 1.605 1.585 1.490 (MW) 1.288 952 745 410 365 Enerjisa Aksa Enerji İÇDAŞ Limak Eren Enerji Akenerji Cengiz Zorlu Enerji Bis Enerji AES Entek Source: Information obtained from each IPP’s annu

  6. Slide 6: We provide strong exposure to the growing Turkish electricity market

    We provide strong exposure to the growing Turkish electricity market 1 Strong Electricity Demand Growth (1) 2 Increasing per Capita Consumption (2) 500 TWh High CAGR – High Demand: 7.3% MWh/pa 450 431 Demand Scenario 9 400 8 350 Low 7 255 362 Demand 300 Scenario 6 250 CAGR – Low Demand: 5.0% CAGR: 5

  7. Slide 7: We have 19 assets under operation across Turkey

    We have 19 assets under operation across Turkey 17 KIYIKÖY 24 MW 1 2 3 AYVACIK AYRES ÇORUM-İNCESU SAMSUN 5 MW 15 MW 131 MW AKKÖY 19 13 MW 4 VAN 16 115 MW BALIKESİR KAPIDAĞ 24 MW 15 BALIKESIR ŞAMLI 114 MW Total 2,140 MW 14 MANISA KARAKURT 11 MW 13 MANISA 115 MW 18 SİİRT 24 MW 12 ANTALYA ŞIRNAK 5 1,15

  8. Slide 8: Each of our assets has key specifications to fortify our strategy

    Each of our assets has key specifications to fortify our strategy A D Baseload Natural Gas Fired PP – Antalya Wind Farms  Located in a favorable wind corridor with high load factors  One of the most efficient CCGT plants in Turkey, with  7 farms, with a total capacity a capacity of 1,150 MW with

  9. Slide 9: We have a diversified pipeline of 10 projects adding 1,507 MW

    We have a diversified pipeline of 10 projects adding 1,507 MW to our portfolio Current Installed Total Installed Pipeline Capacity Capacity 1,507 MW 3,647 MW 85 MW 1,053 MW Hydro 147 MW 175 MW Wind 49 MW 288 MW Lignite 270 MW 270 MW Natural Gas 1,041 MW 369 MW 2,140 MW (1) 2.681 MW 6 3 1 10 1 Hydro

  10. Slide 10: Significant cost improvement with renewables and lignite fired PP pipeline

    We target to create significant cost improvement with our renewables and lignite fired PP pipeline Targeted Capacity Increases in Renewables & Lignite (MW) MW MWh (+) 62 MW Hydro 10% 12% 26% Further 700 4000 (+) 13 MW Hydro (already oper.) pipeline of (+) 85 MW 62 3500 (+) 49 MW Wind 600 13 hydro &

  11. Slide 11: Utilizing own generation and sourcing capabilities to supply customers

    We are utilizing our own generation as well as sourcing capabilities to supply our customers Cost Structure vs. Sales Price (9M 2014) Improving Lower Cost Output % of TL/MWh 175 448 Renewables 20% 18% &Sourcing 320 311 7,591 GWh 31 6,709 GWh 280 Average Cost: 141 240 200 159 160 9 280 120 82 70 80 1

  12. Slide 12: Our sales mix is getting more diversified and secure

    Our sales mix is getting more diversified and secure, increasing our capacity utilization Capacity Utilization 44% 61% 8 TWh 7.6 TWh Balancing Market 7 Northern Cyprus Sales 6 Wholesale Bilateral to BSM 2.16 BSM 28% Retail Bilateral 5 4.2 TWh 4 3 3.6 Total 5.43 Contracted 72% 86% BSM 3.6 2 Contracte

  13. Slide 13: Shifting bilateral mix towards more profitable commercial clients

    At the same time, we are shifting bilateral mix towards more profitable commercial clients Increasing Contracted Volume Supported by Evolution of Eligibility Limit Affiliated Distribution Regions 64x 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 # of Bilateral Customers (2) 245 61

  14. Slide 14: Increased CCGT efficiencies and cut opex to improve cost base

    We have successfully increased efficiencies of our CCGT plants and managed to cut our opex to improve our cost base 1 Low Unit Capex 3 Improving Fuel Efficiency US$m/MW US$/MWh 95 312 305 287 403 60% CCGT 0,4 90 89 54% 55% (1) Lignite 1,3 83 50% 76 Wind 1,4 77 74 70 71 44% Hydro 2,2 41% 65 40% 0,0 0

  15. Slide 15: Tailored strategy to create sound and secure profitability

    Tailored strategy to create sound and secure profitability Evolution of Capacity and Sales Mix Sales Mix Total Contracted (1) Total Contracted (1) 3,647 MW 14% Shifting strategy 29% Fortify baseload Lignite to become baseload strategy & build cost Hydro producer 71% effective pipeline Wind Total Spo

  16. Slide 16: The Sector

    The Sector

  17. Slide 17: Market Highlights- Generation & Consumption

    Market Highlights- Generation & Consumption Generation (GWh) 259.000 ►On a yearly basis, electricity generation was 254.000 249.000 up by 4.6% YoY. 244.000 ►Electricity generation in 4Q14 increased by 239.000 234.000 2.5% YoY. 229.000 224.000 219.000 214.000 Consumption (GWh) 2011 2012 2013 2014 259

  18. Slide 18: Market Highlights- Generation by type

    Market Highlights- Generation by type Generation by type 2013 vs 2014 Wind 3% Fuel-Oil Hydro 2% 16% Wind Fuel-Oil Lignite & Coal 3% 2% 29% Other 2% Hydro 25% Lignite & Coal 25% Other 1% Natural gas Natural gas 48% 44% Inner circle: 2013 Outer Circle: 2014 ►Source of electricity generation in 2014 ch

  19. Slide 19: Market Highlights- Installed Capacity

    Market Highlights- Installed Capacity ►Natural gas, followed by hydro capacities continue to dominate the market. ►The installed capacity has gone up by 9% YoY in 2014. MW Installed Capacity Installed Capacity Breakdown 30.000 25.550 23.641 Hydro; 34% 25.000 20.000 14.636 15.000 10.000 Natural gas;

  20. Slide 20: Market Highlights- Installed Capacity

    Market Highlights- Installed Capacity ►Total installed capacity in Turkey has increased by 5,000 MW YoY to 69,516 MW, with the majority coming in from coal&lignite and Capacity Changes (2014 vs 2013) MW hydro. Fossil Renewable 2.208 ►YoY, there was an increase of 2,208 MW in 2.250,0 2.000,0 coal&lig

  21. Slide 21: Market Highlights- Prices

    Market Highlights- Prices Weighted Average Price (TL) ►Prices – Weighted average prices were 180,0 176 173 175,0 strong in 2014, due to the drought preventing 170,0 166 a significant contribution from the 165,0 162 160 160,0 158 hydroelectric power plants and the increase in 155,0 150,0 147 demand.

  22. Slide 22: 9M 2014

    9M 2014

  23. Slide 23: 9M 2014 Results- Snap Shot

    9M 2014 Results- Snap Shot * YoY QoQ YoY YoY 2012 2013 Change Q2 2014 Q3 2014 Change Q3 2013 Q3 2014 Change 9M 2013 9M 2014 Change Installed Capacity (MW) 2.045 2.052 7 MW 2.066 2.127 61 MW 2.052 2.127 75 MW 2.052 2.127 75 MW Sales Volume (GWh) 9.784 9.109 -7% 2.298 2.835 23% 2.570 2.835 10% 6.709 7

  24. Slide 24: Sales breakdown (MWh)

    Sales breakdown (MWh) 3Q 2014 vs 2Q 2014 3Q 2014 MW 2Q 2014 MW Renewable Market Renewable Market BSM 1% 2% 36% BSM 11% Regional Sales Regional Sales 3% 1% Northern Cyprus 7% Northern Cyprus Bilateral 6% Agreements 52% Affiliated DisCos 1% Bilateral Agreements Affiliated DisCos 76% 4% -Bilateral sale

  25. Slide 25: Sales breakdown (TL)

    Sales breakdown (TL) 3Q 2014 vs 2Q 2014 Renewable Market 3Q14 TL 2Q 2014 TL 0% BSM BSM 7% Renewable Market 39% 1% Regional Sales 3% Regional Sales 11% Northern Cyprus 15% Northern Cyprus 10% Affiliated DisCos Bilateral Agreements Affiliated DisCos 4% 38% 1% Bilateral Agreements 71% -Bilateral sales

  26. Slide 26: Company Highlights- 9M 2014 Production & Sales

    Company Highlights- 9M 2014 Production & Sales ► In 9M14, net sales of the Company has increased by 13% YoY from 6,709 GWh to 7,591 GWh due to the increase in electricity demand, which is coming from a low base and the increase in bilateral agreements. ► 5.43GWh of electricity was sold on a contract

  27. Slide 27: Company Highlights- 9M 2014 Production & Sales

    Company Highlights- 9M 2014 Production & Sales ► Capacity utilisation rate has increased by 6 ppts to 61% in 9M14 YoY and by 5ppts compared to YE2013, as the increase in bilateral sales enables the Company to better project future production need and hence help increase the CUR. ► Strong operating p

  28. Slide 28: Company Highlights- Power plants

    Company Highlights- Power plants ► Kıyıköy WPP’s provisional ministry acceptance was completed in August 2014, whereby 24MW was added to the generation portfolio. ► Akköy HPP’s (13MW) transfer to Aksa Enerji from Kazancı Holding was approved by EMRA at the end of August. ► Construction of Sebenoba W

  29. Slide 29: Bolu lignite power plant to be fully operational in 2015

    Company Highlights- Bolu lignite power plant to be fully operational in 2015 ► The construction of Bolu/Göynük lignite fired power plant, which started on 13 July 2012, continues as planned. This plant will have an installed capacity of 270MW and will be fully operational in 2015. ► This plant will

  30. Slide 30: Company Strategy Going Forward

    Company Strategy Going Forward ► The company’s strategy is to increase its local and renewable resources within its production portfolio to decrease its cost base. ► To this end, we are more focused on creating new greenfield lignite fired power plant projects. We are in discussions for 3 new lignit

  31. Slide 31: Catalysts and Key Events- Bolu Göynük Lignite PP

    Catalysts and Key Events- Bolu Göynük Lignite PP 1st Phase Near Completion ► An installed capacity of 270MW ► SES CFB boilers & Skoda turbines ► To be fully operational in June 2015. ► CAPEX: $350mn ► Annual production volume of 2bn KWh ► Cost of production: TRY 70 ► EBITDA margin of 55% ► Significa

  32. Slide 32: Catalysts and Key Events- Bolu Göynük Lignite PP

    Catalysts and Key Events- Bolu Göynük Lignite PP ► On-site lignite mine ► Open pit ► Owned and operated by Aksa Enerji ► Sufficient supply of coal for the life time of the lignite PP ► Calorific value: 2400 kcal/ton ► Mine being operated for the last 5 yrs ► Coal being stored now for first fire 31

  33. Slide 33: Financial highlights 9M 2014 Consolidated income statement

    Financial highlights 9M 2014 Consolidated income statement Net sales & EBITDA (TL mn) 1.510 599 EBITDA Margin EBITDA Margin 3Q14: 24.7% 1.329 9M14: 18.3% 537 3Q13: 20.9% 9M13: 18.0% 148 112 240 276 Net Sales EBITDA Net Sales EBITDA 3Q13 3Q14 9M13 9M14 Operating income & Net income (TL mn) 183 115 15

  34. Slide 34: Net financial debt and repayment schedule

    Financial highlights 9M 2014 Net financial debt and repayment schedule Net financial debt (TL mn) 1.800 1.688 64% 61% 1.600 62% 1.400 1.280 1.306 60% 1.138 1.270 1.200 60% 58% 1.000 56% 800 54% 55% 55% 600 52% 400 52% 50% 200 48% - 46% 2010 2011 2012 2013 9M14 6.0 4.2 4.0 4.2 4.8 Net Financial Debt

  35. Slide 35: Financial Highlights 9M 2014

    Financial Highlights 9M 2014

  36. Slide 36: Consolidated income statement

    Consolidated income statement (TLm) 2010 2011 2012 2013 9M 2013 9M 2014 3Q 2013 3Q 2014 Net sales 911,9 1315,4 1840,6 1786,0 1328,6 1509,8 536,7 599,4 Cost of sales -775,5 -1088,0 -1604,0 -1565,9 -1156,6 -1308,6 -448,5 -477,1 Gross profit 136,4 227,4 236,6 220,1 172,0 201,2 88,2 122,3 Gross profit m

  37. Slide 37: Consolidated balance sheet

    Consolidated balance sheet (TL mn) Assets 2010 2011 2012 2013 9M 2013 9M 2014 Cash and cash equivalents 78,3 110,5 40,6 22,3 24,2 19,5 Trade receivables net 113,0 261,5 245,9 142,3 253,5 27,8 Due from related parties and shareholders 607,9 360,0 593,9 0,0 0,0 0,5 Inventory 81,3 121,5 135,5 250,0 188

  38. Slide 38: Consolidated statement of cash flows

    Consolidated statement of cash flows (TLmn) 2010 2011 2012 2013 9M 2013 9M 2014 Net income (loss) before tax 84,7 -116,5 226,5 -156,1 -60,6 56,8 Depreciation and amortisation 71,7 92,5 105,3 111,8 81,2 89,7 Other adjustments 14,7 231,2 -53,1 193,9 173,5 43,0 Change in w orking capital 18,64 -20,3 -1

  39. Slide 39: Appendix

    Appendix

  40. Slide 40: Operating (Current)

    Operating (Current) Power Plant License Owner Fuel Type Installed Capacity (MW) % Mardin-1 Aksa Energy Fuel-oil 32 Mardin-2 Rasa Elektrik Fuel-oil 33 Northern Cyprus Aksa Cyprus Fuel-oil 120 İdil (Şırnak) İdil İki Energy Fuel-oil 24 Siirt Siirt Akköy Fuel-oil 24 Total Fuel-Oil fired power plants 233

  41. Slide 41: Ongoing Investments and Revised Licence Portfolio

    Ongoing Investments and Revised Licence Portfolio Planned Acquisitions from Kazancı Holding Power Plant Investment License Owner Fuel Type Additional Capacity (MW) Completion Year  Planned acquisition from Kazancı Holding: Datça Licenced Kazancı Holding Wind 12 2015  Datça 12 MW wind farm licence

  42. Slide 42: Turkish power market

    Turkish power market Installed Capacity by Fuel Annual Installed Capacity Increases GW CAGR GW 23.2 80 8.8% 18 69.5 70 16 64.0 57.1 14 11.5 60 52.9 52% 40% 27,7 12.6% 49.5 12 50 44.8 25,0 41.8 22,0 10 34% 19,0 6.8 40 17,2 8 14,2 15,4 4.7 4.3 30 6 3.4 11.7 2.9 6.7% 4 3.0 48% 20 39,0 41,8 1,8 32,3 33,

  43. Slide 43: Contact- Investor Relations

    Contact- Investor Relations Özlem McCann IR Manager Ozlem.McCann@aksa.com.tr +90 216 681 1053 Rüzgarlıbahçe Mah. Selvi Çıkmazı No:10 Kavacık Beykoz, Istanbul 42

Aksa Enerji Üretim A.Ş. — 9M 2014 Earnings Presentation on 6ix