Fokus Mining — Investor Presentation (November 2020)
30 slides from Fokus Mining's investor presentation, November 2020
Slide 1: Fokus Mining presents the Galloway Project
PRESENTS THE GALLOWAY PROJECT
Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Statements contained in this presentation that are not historical facts are “Forward-Looking Statements” … Forward-Looking Information can be identified by the use of words such as “plans,” “expects,” “estimates,” “anticipates,” “potential,” “believes,” or variations of suc
Slide 3: Who We Are
WHO WE ARE FOKUS MINING CORP We are a mineral resource company actively acquiring and exploring precious metals deposits located in the province of Quebec. In implementing this major undertaking within the Canadian mining industry, we are determined to develop the full potential of the opportunity p
Slide 4: Our Team
IN FOCUS OUR TEAM JEAN SYLVAIN RAINVILLE CHAMPAGNE President and Chief Secretary and Chief Executive Officer Financial Officer CIRO THIBAUT GILLES MARC-ANDRÉ CUCCINIELLO SEGERAL LAVERDIÈRE LAVOIE Director Director Director Director
Slide 5: Our Short-Term Priorities
FOKUS MINING CORP OUR SHORT-TERM PRIORITIES COMPLETE AN EXTENSIVE COMPLETE A NI43-101 DRILLING PROGRAM ON RESOURCES ESTIMATE GALLOWAY ON GALLOWAY
Slide 6: The Galloway Gold Project
THE GALLOWAY GOLD PROJECT The Galloway gold project is located in the Dasserat Township in Abitibi area, Quebec, Canada. The property is less than 30 km west of the Rouyn-Noranda mining district and is easily accessible via Trans-Canada Highway 117. It consists of 3 mining concessions and 95 claims
Slide 7: Strategic Location
GALLOWAY PROPERTY KIRKLAND LAKE: 25 M OZ NORANDA: 18 M OZ LARDER LAKE: 11 M OZ BOUSQUET: 15 M OZ STRATEGIC LOCATION This project is located in the heart of the logical and strategic continuity of the different gold deposits discovered along one of the most prolific gold faults in the world, the Cadil
Slide 8: Galloway Property Regional Geology
FM [Holt-McDermott pa Fo PROTEROZOIC MINES AND DEPOSITS Dolomite, argillite, sandstone, wacke, conglomerate ARCHEAN In production Closed Sedimentary rocks Conglomerate, wacke, arkose, argillite Gl (Wacke, schist and paragneiss Gold Mine Volcanic rocks (A Copper-Zinc Mine 5 Dacite, rhyol A Quarry a B
Slide 9: Galloway Property Local Geology
FM > ordece J % Deposit Showing IEEE GP Deposit [) Ventex Mineral Cisims iG----, Kenasute Proposed Protected Area ae ~ ©1600 r 18000 ‘620000 Bore! WE TAWORP HEC ROCKS SEOMMENTARY ROCKS Lit 33 Local Geology Figure 6.2
Slide 10: Galloway Property metalliferous corridor Rouyn-Noranda Val-d'Or
ES METALLIFERES DU CORRIDOR ROUYN-NORANDA VAL-D'OR
Slide 11: The Quebec Golden Triangle
THE QUEBEC GOLDEN TRIANGLE A major opportunity in the Canadian mining industry The golden triangle comprise 3 main zones: GP, Hendrick and Moriss. Although not being side by side, the various gold zones including the Hurd zone located to the NNE of the GP zone could be connected on the surface and u
Slide 12: GP Zone
GP ZONE
Slide 13: GP Zone in Focus
GP ZONE IN FOCUS The GP showing lies immediately at the contact with the syenite stock. It consists of pervasive gold mineralization within a mineralized envelope of 230 m in length by over 100 m in width and over 300 m in depth. Numerous gold intervals of over 1 g/t Au over widths in excess of 20 m
Slide 14: GP Zone - Drilling Results
HOLE # FROM (M) TO (M) LENGTH (M) GRADE (G/T AU) KHD-87-09 62.24 281.18 218.90 0.515 Including 160.32 196.9 36.50 1.00 VHD-09-01 9.50 307.50 298.00 0.51 Including 9.50 21.00 11.50 1.00 VHD-09-05 6.85 213.10 206.50 0.517 Including 138.80 166.60 11.50 1.01 GP ZONE - VHD-09-13 Including 8.25 172.50 262
Slide 15: GP Showing - Section 61/7775E
COBALT . SEDIMENTS . GP SHOWING - SECTION 61/7775E mer!) ome: |
Slide 16: Hendrick Zone
, G HENDRICK ZONE ® ~. - MORISS
Slide 17: Hendrick Zone in Focus
HENDRICK ZONE IN FOCUS The Hendrick showing was discovered by Kerr-Addison in the 1980's. It is located some 500 m south of the GP and Moriss zones. The Hendrick zone is genetically related to the Renault Bay syenite as it lies within or in close proximity to what seems to be an apophysis of the int
Slide 18: Hendrick Zone - Drilling Results
HOLE # FROM (M) TO (M) LENGTH (M) GRADE (G/T AU) VPE-10-15 519.00 801.00 282.00 0.627 HENDRICK ZONE - Including 636.00 675.00 39.00 1.19 DRILLING RESULTS And 934.50 1,002.00 67.50 0.623 (ALONG THE CORE) VPE-11-36 440.30 999.00 558.70 0.56 Including 657.00 801.00 144.00 1.01 VPE-12-48 834.00 982.50 1
Slide 19: Hendrick Showing - Section 617330E
HENDRICK SHOWING - SECTION 617330E COBALT SEDIMENTS iu moa
Slide 20: Moriss Zone
MORISS ZONE _* P Sh SAS ] td { (©) HENDRICK ¥ 5
Slide 21: Moriss Zone in Focus
MORISS ZONE IN FOCUS The Moriss showing lies about 500 m west of the GP showing. It is spatially associated to an apophysis of the main syenite intrusion. The Moriss showing was originally identified as a geophysical target in 2009 and was discovered by drilling in October 2010. It is actually a comp
Slide 22: Moriss Zone - Drilling Results
HOLE # FROM (M) TO (M) LENGTH (M) GOLD VALUE (Q/T AU) VPE-10-06 97.50 108.00 10.50 3.80 Including 97.50 100.50 3.00 11.86 VPE-10-10 101.00 106.35 5.35 11.41 Including 102.35 105.00 2.65 22.37 VPE-10-11 84.00 89.50 5.50 19.06 And 100.50 106.50 6.50 14.63 And 145.00 153.00 7.50 3.23 VPE-10-18 48.00 59
Slide 23: Moriss Showing - Section 617175E
! 1 | MORRIS spowne - SECTION 617175E e139 vow fie Pe-1020 yg seer Wreroa PEO WET Veriow
Slide 24: Exploration Budget
GALLOWAY PROPERTY EXPLORATION BUDGET Exploration budget: $5 million *40,000 m of drilling on the Quebec Golden Triangle
Slide 25: The Golden Triangle: GP, Hendrick and Moriss Zones
THE GOLDEN TRIANGLE: GP, HENDRICK AND MORISS ZONES SELECTED DRILL INTERSECTIONS — 160.5m at .78g/t Au 18.43g/t Au over (VHD-10-31) 4.15m_ (vPE-11-19) 12.93g/t Au over 6.85m (vPe-11-25) 100.6m at 1.03g/t Au 6 (93-H-05) i 86.8m at 1.10g.t Au 7 GP ZONE {(KHD-87-7) 144m at 1.006¢/t Au (VPE-11-36) GALLOW
Slide 26: Why Invest in the Galloway Project?
WHY INVEST IN THE GALLOWAY PROJECT? MANY GOLD ZONES FULLY FINANCED 40,000 M IN A PROLIFIC GOLD ON PROPERTY OF DRILLING IN 2020-2021 MINING DISTRICT OPEN PIT AND BEST JURISDICTION IN MULTI-MILLION OUNCES UNDERGROUND POTENTIAL CANADA WITH A POTENTIAL STRONG MANAGEMENT
Slide 27: Financial Structure
FOKUS MINING CORPORATION FINANCIAL STRUCTURE
Slide 28: Share Structure
SHARE STRUCTURE OUTSTANDING OPTIONS: WARRANTS: FULLY DILUTED SHARES: (avg. price of 0.32) (avg. price of 0.27) SHARES: (as of October 26, 2020) 61,041,373 4,700,000 29,507,924 95,249,297 TSX.V : FKM Frankfurt : F7E1
Slide 29: Next Steps and Timeline
NEXT STEPS AND TIMELINE September October 2020 Summer 2021 Q3-Q4 2021 2020 to June 2021 PRELIMINARY 5 M$ 40,000 M OF NI43-101 RESOURCES ECONOMIC FINANCING DRILLING ESTIMATES ASSESSMENT (PEA)
Slide 30: Contact Us
CONTACT US Head office: 147 Quebec Avenue, Rouyn-Noranda Quebec, Canada J9X 6M8 Postal address: P.O. Box 491, Rouyn-Noranda Quebec, Canada J9X 5C4 Administration: 819-762-0609 Shareholder request : 514-918-3125 MarketSmart agent : 604-999-7018 Fax: 819-762-0097 Mr. Jean Rainville, CEO Mr. Sylvain Cham