Cobalt Blue Holdings Ltd. · ASX:COB
Cobalt Blue — Corporate Update (April 2024)
13 slides from Cobalt Blue's corporate update, Apr 4, 2024
Slide 1: Investor webinar presentation announcement
Cobalt Blue Holdings Limited ABN 90 614 466 607 Level 17, 100 Miller Street, North Sydney, NSW 2060 www.cobaltblueholdings.com Facebook: www.facebook.com/Cobalt.Blue.Energy/ LinkedIn: www.linkedin.com/company/cobalt-blue-holdings 4 April 2024 Company Announcements Office Australian Securities Exchan
Slide 2: COB – Regeneration MOU Webinar
For personal use only COB – Regeneration MOU Webinar Dr Helen Degeling 4 April 2024
Slide 3: Cobalt Blue: metals for positive impact
Cobalt Blue: metals for positive impact Our ‘mine-to-battery-markets’ For personal use only strategy aims to provide a reliable supply of responsibly sourced battery metals that are essential to the Global Energy Transition. Cobalt-Nickel Refinery Project Waste Streams Projects Broken Hill Cobalt Pr
Slide 4: Introducing Regeneration
Introducing Regeneration is a mine restoration and closure company For personal use only Aims to restore and renew biological and ecological systems… through full value mining and other innovative methods Producing responsible minerals for the energy transition, green tech and sustainable brands
Slide 5: An MOU for collaboration
+ An MOU for collaboration NEXT STEPS For personal use only Seek to partner on legacy sites where Kick-off meetings underway to Cobalt Blue’s patented technology and establish a short-list of potential expertise can be applied projects under the collaboration Work with each other and legacy site par
Slide 6: Global Mine Waste Opportunity
Global Mine Waste Opportunity Globally For personal use only 10-13 billion tonnes mine waste is produced annually around the world, adding to an estimated 200 billion “~10 billion tonnes of waste already produced1. Companies avoid rehab due to the huge cost. tonnes of Australia tailings >10,00
Slide 7: Bringing circularity to a linear industry
Bringing circularity to a linear industry For personal use only The COB Waste Streams Project is re-thinking how we extract metals. This has a huge impact on how the mining industry contributes to economies, communities and global supply chains. ASX: COB 6
Slide 8: The Case for Tailings Re-Processing
The Case for Tailings Re-Processing For personal use only ASX: COB 7
Slide 9: Acid Reduction
Acid Reduction For personal use only Cobalt Blue’s patented process mitigates potential environmental harm and produces saleable elemental sulphur A key step in the Cobalt Blue process is to convert pyrite (FeS) to the mineral pyrrhotite (FeS(1-x)). Pyrrhotite contains less sulphur than pyrite, and
Slide 10: Environmental and commercial gains
Environmental and commercial gains For personal use only What is an environmental bond? An environmental bond is a deposit to a government to cover potential damage from mining activities. Bonds vary by location and by project size and pollution risk. Re-mining can reduce bond costs by lowering proj
Slide 11: Case Study: Flin Flon tailings project
Case Study: Flin Flon tailings project Site: Flin Flon TSF For personal use only Location: Manitoba, Canada Commodities: Zn-Cu-Ag Status: initial testwork completed. Confirms >90% conversion of pyrite to pyrrhotite from tailings sample, with Cobalt Blue and Hudbay capture/removal of elemental sulphu
Slide 12: Contact us
For personal use only Contact us For more information: Dr Helen Degeling Project Acquisition Manager E: helen.degeling@cobaltblueholdings.com Ph: +61 429 001 310 W: www.cobaltblueholdings.com/projects/cwsp
Slide 13: Disclaimer
Disclaimer The following notice and disclaimer apply to this investor presentation (Presentation). You Forward-looking statements and forecasts are therefore advised to read this carefully before reading or making any other use of this This Presentation contains certain “forward-looking statements”