Southern Palladium Ltd. · ASX:SPD

Southern Palladium — Investor Presentation (June 2022)

17 slides from Southern Palladium's investor presentation, Jun 15, 2022

  1. Slide 1: Webinar Presentation

    15 June 2022 Webinar Presentation Southern Palladium Limited (ASX:SPD) releases the attached Webinar Presentation. As announced to the ASX on 10 June 2022, Southern Palladium will also be hosting an investor webinar at 2 PM AEST on Wednesday 15 June 2022. For anyone wishing to attend the webinar, pl

  2. Slide 2: The Bengwenyama PGM Project

    SOUTHERN PALLADIUM LIMITED TH E B E N G W E N YA M A P G M P R O J E C T S U C C E S S F U L C A P ITA L R A IS E A N D LIS TIN G – 1

  3. Slide 3: Disclaimer

    Disclaimer The following disclaimer applies to this investor presentation (Presentation). You should read this disclaimer carefully before reading or making any other use of this Presentation or any information contained in this Presentation. By accepting this Presentation, you represent and warrant

  4. Slide 4: Disclaimer (cont'd)

    Disclaimer (cont’d) Future performance This Presentation contains forward looking statements, including statements regarding the Company's intentions, beliefs or current expectations about the Group's business and operations, and market conditions. Forward looking statements can generally be identif

  5. Slide 5: Bengwenyama project highlights

    Bengwenyama project highlights – u n lo c kin g su b st a n t ia l va lu e PGM POTENTIAL A large, shallow, advanced exploration / pre-development Platinum Group Metals (PGM) opportunity In the heart of the Eastern Limb of the Bushveld Complex which contains approx. 72% of the world’s PGM resources.

  6. Slide 6: SPD Corporate and asset ownership structure

    SPD Corporate and asset ownership structure Number of shares million Pre-IPO shares 6.25 7.0% Bengwenyama Community via Southern Palladium MUM acquisitions shares 45.50 50.7% Nurinox Investments 12.3% Limited Pty Ltd IPO shares 38.00 42.3% Total 89.75 100% 30% 70% Additional securities million Mirac

  7. Slide 7: Management

    Experienced SPD Board & Management with outstanding track record NON-EXECUTIVE CHAIRMAN NON-EXECUTIVE DIRECTOR Terence Goodlace Daan van Heerden • 40+ years mining experience including 28 years in executive and leadership roles with • Over 30 years’ experience in mining Gold Fields Limited • Signifi

  8. Slide 8: Excellent project location

    Excellent project location | single community • 290km on sealed road from Johannesburg • In the ‘sweet spot’ of the Eastern Limb • Excellent infrastructure (water, power and services) • Skilled workforce in Steelpoort and Burgersfort • One of the last remaining, undeveloped PGM projects to be develo

  9. Slide 9: 34 - 52 million ounce PGE potential

    34 - 52 m illio n o u n c e P GE (3P GE+Au ) p o t e n t ia l Revenue Split – UG2 Reef Inferred Resource, (JORC 2012) Spot Price UG2 MR Platinum USD/oz. 930 409 567 Palladium USD/oz. 1,736 764 503 Rhodium USD/oz. 12,500 1,250 375 Exploration Target, (JORC 2012) (in addition to the Inferred Resource)

  10. Slide 10: A rare tier 1 shallow, eastern limb project

    A rare tier 1 shallow, eastern limb project • Tabular continuous orebodies dips gently to the west at 10-12 degrees • Geologically straightforward with consistent grades and structurally simple • UG2 typical of the Eastern Limb deposits: mineable grades (ca. 4.5g/t PGE 3E + Au) at a very attractive

  11. Slide 11: Positive results from geophysical survey

    Positive results from geophysical survey • High-definition helicopter-borne geophysical survey completed • Data confirms confidence in the existing geological structure • Imaging also confirms absence of anomalous (Loss of Reef) features in the target area for phase 1 drill program 10

  12. Slide 12: Exploration plan

    Exploration plan | 25,000m of drilling over 10 -12 m o n t h s • A contract signed with Geomech Africa Proprietary Limited for Phase 1 • Delivering JORC Indicated Resources and Probable Reserve of at least 2Moz in the UG2, sufficient for an initial 9-10 year life • Overlying Merensky Reef to be inte

  13. Slide 13: Exploration/Pre-development timeline

    Exploration/Pre -d e ve lo p m e n t t im e lin e PLAN ITEM ACTIVITY PLAN START DURATION PERIODS MONTH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 Geophysics 1 2 2 Ph 1 Shallow Inferred Indicated Conversion 3 10 3 JORC 2012 Resource Report 12 4 4 Concept Study 6 6 5 Ph 2 Drillin

  14. Slide 14: Green economy fuels PGM demand

    Green economy fuels PGM demand 1 Application  Green hydrogen – Platinum and Iridium OUR FUTURE IS GREEN  Fuel cells – Platinum  Autocatalysts in Internal Combustion Engine (“ICE”) – Palladium, Green movement has sparked a Platinum and Rhodium still the biggest driver significant renewed interest

  15. Slide 15: Environmental, social and governance

    Environmental, social and governance SPD’s Board brings their ESG experience into the management of the company and the project. ENVIRONMENT SOCIAL GOVERNANCE “Bengwenyama Dream – Yes We Can!! The resident Bengwenyama Our approach to environmental The boards of SPD and MUM are Community is a respect

  16. Slide 16: Investment summary

    Investment summary LOCATION The right address with top tier potential and with strong single community support. UNLOCKING Potential to increase with exploration program and PFS. 70% of IPO funds into the ground over two years. POTENTIAL ATTRACTIVE EV of ~US$1.94 per attributable Inferred Resource ou

  17. Slide 17: Contact

    CONTACT South Africa Australia Johan Odendaal Mike Stirzaker Ma n a g in g Dire c t o r De s ig n a t e No n -Ex e c u t ive Dire c t o r M: +27 82 557 6088 M: +61 411 686 641 E: johan.odendaal@southernpalladium.com E: mike.stirzaker@southernpalladium.com 16

Southern Palladium — Investor Presentation (June 2022) on 6ix