Central Petroleum Limited · ASX:CTP

Central Petroleum — RIU Good Oil Conference 2019

21 slides from Central Petroleum's conference presentation, Sep 11, 2019

  1. Slide 1: RIU Good Oil Conference

    RIU Good Oil Conference 11 September 2019 Central Petroleum Limited (ASX:CTP)

  2. Slide 2: Company snapshot

    190.0 Company snapshot 170.0 Relative share price performance – 12 months 150.0 Brisbane head office 130.0 Oil and gas E&P in Northern Territory (NT) * and Queensland (QLD) 110.0 $135M market cap 90.0 99 employees 70.0 7.6 PJE of sales 2H FY2019 3 $39M sales revenue 2H FY2019 CTP Peer Group S&P/ASX

  3. Slide 3: Northern Territory and Queensland assets

    Northern Territory and Queensland assets Operations and *Reserve/ Production developments resource volume1 Mereenie gas (50%) 89PJ 2P 24TJ/d Palm Valley 26PJ 2P 9TJ/d Dingo 38PJ 2P 2TJ/d Range (pre-FID) 135PJ 2C n/a Exploration / appraisal • Over 200,000km2 exploration portfolio in underexplored and

  4. Slide 4: Results delivered - 12-month highlights

    Results delivered - 12-month highlights Mereenie and WM 26 and PV13 NGP connection Sales volume up Palm Valley appraisal wells to east coast gas 290% with strong facility upgrades completed market cash flow Progressed short- Positive Project Range Reduced debt by term and indicators from 135PJ 2C* $

  5. Slide 5: Near-term growth activities

    Near-term growth activities Convert 2C to 2P Forward plan for Accelerate FID for (Mereenie, Dukas-1 exploration Project Range Palm Valley, well Project Range) Medium-term Near-term exploration exploration strategy opportunity (play-based analysis) CENTRAL PETROLEUM LIMITED (ASX:CTP) 5

  6. Slide 6: Range Gas Project

    Range Gas Project CENTRAL PETROLEUM LIMITED (ASX:CTP) 6

  7. Slide 7: Upside outcome at Project Range

    Upside outcome at Project Range  NSAI certified maiden 2C resources of 270PJ* (135PJ* net to Central)  Test results exceeded expectations:  average net coal thickness of 30m  permeability in line with, or better than, expectations in all tests  good permeability in deeper Taroom coals which can

  8. Slide 8: High quality 2C Resources

    High quality 2C Resources Project Range  The Walloons Fairway is the most developed CSG play in Australia, with thousands of wells drilled to date  Project Range 2C is “Development Pending” – the highest sub-class of Contingent Resources. This is defined as “A discovered accumulation where project

  9. Slide 9: Range Gas Project in context

    Range Gas Project in context Project Range acreage is 77km2 with 270 PJ 2C Resource* surrounded by major CSG developments and infrastructure Other nearby recently reported CSG projects1:  The Ironbark Project2 recently traded at $231M with last reported reserves of 129PJ 2P, 192 PJ 3P  The Atlas P

  10. Slide 10: Final Investment Decision (FID)

    Range Gas Project moving towards FID Calendar year 2019 2020 2021 2022 2023 Expl. Pilot 2P 2C 1st gas Gas at plateau drilling online booked Final Investment Decision (FID) Field activities Land access, development plan, Construction and commissioning FEED, tendering, long-lead items Native Title / P

  11. Slide 11: Dukas-1

    Dukas-1 CENTRAL PETROLEUM LIMITED (ASX:CTP) 11

  12. Slide 12: Dukas-1 update – current status

    Dukas-1 update – current status Dukas-1  Targeting sub-salt section of the Seismic Amplitude Phanerozoic clastics Amadeus Basin on a large regional high with multi-Tcf potential  Extremely high pressure Evaporites Neoproterozoic carbonates encountered at 3,700m just above and clastics the primary

  13. Slide 13: Dukas-1 update – looking forward

    Dukas-1 update – looking forward  Yet to intersect the primary target - expected within the next few hundred metres  Further drilling requires a larger capacity rig and blow-out preventor (e.g. 15,000psi)  Recent testing and drilling data needs to be analysed before the JV determines a forward pl

  14. Slide 14: Exploration as a growth engine for Central

    Exploration as a growth engine for Central CENTRAL PETROLEUM LIMITED (ASX:CTP) 14

  15. Slide 15: 6-month exploration team activity

    6-month exploration team activity Near-term exploration Medium to long-term exploration  Assimilated leads into a standardised  Initiated and progressed ‘Play-Based’ portfolio structure portfolio analysis – 5 complex working petroleum systems across 170,000km2  Introduced a rigorous analysis and

  16. Slide 16: Amadeus Basin – Indicative prospects maturity

    Amadeus Basin – Indicative prospects maturity Medium and long-term Net to Central Risked Recoverable Volume prospects (3-5 years) that require detailed additional analysis not previously completed. Play Based Exploration methodology focusses on each separate working hydrocarbon system, overlayed by

  17. Slide 17: Investment opportunity

    Investment opportunity CENTRAL PETROLEUM LIMITED (ASX:CTP) 17

  18. Slide 18: Compelling Investment Opportunity in proven operations and significant exploration upside

    Compelling Investment Opportunity in proven operations and significant exploration upside Connected to Fast growing oil the east coast & gas producer market Near-field Low cost gas reserve growth production potential Extensive under- Strong free explored cashflow portfolio in proven basins Strong ma

  19. Slide 19: Positive Momentum

    Positive Momentum  Assembled a highly experienced management team  Delivered the Gas Acceleration Project  Revenues up 290%  Strong free cashflow for the first time  Positive technical indicators at Dukas-1 multi-Tcf target well  Booked 135 PJs of high quality 2C Resource located in the heart

  20. Slide 20: Notice and legal disclaimer

    Notice and legal disclaimer To the maximum extent permitted by law: This presentation is not intended for prospective investors and does not purport to provide all of the information an interested party may require in order to investigate the affairs of Central Petroleum Ltd (“Company”). This presen

  21. Slide 21: Contact and Further Information

    Level 7, 369 Ann Street Brisbane QLD 4000 Australia +61 (0)7 3181 3800 Contact and Further Information Investor and media enquiries: info@centralpetroleum.com.au Helen McCrombie at Citadel- MAGNUS T: +61 (0)2 8234 0103 M: +61 (0)411 756 248 www.centralpetroleum.com.au CENTRAL PETROLEUM LIMITED (ASX:

Central Petroleum — RIU Good Oil Conference 2019 on 6ix