Waratah Minerals Limited · ASX:WTM

Waratah Minerals — Battery Minerals — Benchmark World Tour 2018

31 slides from Waratah Minerals's conference presentation, June 2018

  1. Slide 1: Fast-tracking Montepuez & Balama Projects

    Fast-tracking Montepuez & Balama Projects Benchmark World Tour 2018 1

  2. Slide 2: Presentation Summary

    Presentation Summary 1.Market 2.Company 3.Projects 4.Growth 5.Next Steps 2

  3. Slide 3: NEV sales still growing circa 40-50% YOY

    NEV sales still growing circa 40-50% YOY 3

  4. Slide 4: China NEV sales have gone “Ludicrous”

    China NEV sales have gone “Ludicrous” 4

  5. Slide 5: NEV sales driving all battery materials

    NEV sales driving all battery materials 5

  6. Slide 6: CRU – Graphite Demand (1)

    CRU - Graphite Demand (1 Figure 5 Total graphite demand by market segment, kt 4500 5 4000 3500 3000 2500 2000 4 1500 1000 + 500 4 0 y y y ’ ’ ' 2017 2018 2019 2020 2021 2022 2023 Electrodes @ Carburisation Refractory & Foundry Lubricants Friction products Li-ion batteries Graphite shapes @ Expanded

  7. Slide 7: CRU – Graphite Demand (2)

    CRU - Graphite Demand ( Figure 8 Graphite demand by source, kt 4500 4000 + 3500 4 3000 + 2500 4 2000 + 1500 + 1000 500 0 T T T T T T 1 2017 2018 2019 2020 2021 2022 2023 1 Natural graphite @ Synthetic graphite

  8. Slide 8: CRU – Graphite Demand (3)

    CRU - Graphite Demand (3) Figure 9 Natural graphite end use demand, kt 2500 5 1500 | mw yy = 1000 + jm 500 { 0 r r r r r 1 2017 2018 2019 2020 2021 2022 2023 mRefractory & Foundry @ Carburisation Lubricants @ Friction products Li-ion batteries Graphite shapes m Expanded graphite ™@ Carbon brushes m

  9. Slide 9: Corporate Overview

    Corporate Overview Share Price Jeff Dowling Ben Van Roon Non-Exec Chairman Chief Operating Officer David Flanagan Tony Walsh Managing Director Company Secretary & GM Corporate Brett Smith Jeff Dawkins Non Exec Director Chief Financial Officer Gilbert George Naomi Scott Non Exec Director General Coun

  10. Slide 10: Significant progress, value and opportunity

    Significant progress, value and opportunity 1. Project Finance is next key milestone 2. First exports 12 months from project finance completion 3. Key plant orders placed; crushing circuit, ball mill, camp, dryer, float cells 4. Mining licence granted 5. 4 offtake agreements covering ~80% of Montepu

  11. Slide 11: Montepuez an Exceptional first Project

    Montepuez an Exceptional first Project Montepuez Graphite Project 2 VES (First Module) Annual graphite production 45,000 – 50,000pa Capex (pre-production) US$42.3 M Opex (concentrate/t)7 US$337/t Grade processed 12% TGC Plant Type and Scale Modular, ~500ktpa Projected Payback <2 years5 Net Operating

  12. Slide 12: Crushing Road Construction Material

    Crushing Road Construction Material 12

  13. Slide 13: Permanent Camp Construction

    Permanent Camp Construction 13

  14. Slide 14: Haul Road Earthworks Underway

    Haul Road Earthworks Underway 14

  15. Slide 15: Permanent Camp Construction

    Permanent Camp Construction 15

  16. Slide 16: Bulk Sample Pit 2,500 tonnes

    Bulk Sample Pit 2,500 tonnes 16

  17. Slide 17: First Part Of Permanent Camp

    First Part Of Permanent Camp 17

  18. Slide 18: Foundations for potable water supply plant

    Foundations for potable water supply plant 18

  19. Slide 19: Montepuez Detailed Drilling Confirms Potential

    Montepuez Detailed Drilling Confirms Potential Elephant deposit, comprised 240 holes for 4,968 metres drilled to refusal using blade RC aircore technique. The results include:  EL028A, 37 metres at 13.49% TGC from surface,  EL058A, 20 metres at 15.61%TGC from 2 metres,  EL078A, 24 metres at 16.07

  20. Slide 20: Montepuez Exploration Target – Additional Growth 300-400MT @ 5-10 % TGC

    Montepuez Exploration Target – Additional Growth 300-400MT @ 5-10 % TGC1 • 5 VTEM target areas • Only 15-20% of targets have been drilled • VTEM conductors remain largely untested • All deposits remain open at depth and along strike • Potential for 300- 400Mt @ 5-10% TGC1 • Buffalo deposit drilling

  21. Slide 21: Balama Scoping Study Outcomes

    Balama Scoping Study Outcomes Balama Graphite Project 2 Scoping Study Annual graphite production 50,000 – 55,000pa Capex (pre-production) US$50 M Opex (concentrate/t)6 US$372/t Grade Processed 10.6% TGC Plant Type and Scale Modular, ~550ktpa Projected Payback <1.5 years5 Net Operating Cash Flow >US$

  22. Slide 22: Next 20 months targets

    Next 20 months targets • Finalise debt and equity funding for Montepuez Stage 1 • Complete early stage site works, camp, roads and civils • Delivery of long lead items to site • Commence commissioning • Complete construction and complete commissioning • First Exports • Complete ramp-up • Nameplate c

  23. Slide 23: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement Forward Looking Statements published data for which Competent Persons consents were periodic and continuous disclosure announcements lodged with obtained. Their consents remain in place for subsequent releases the ASX, which are available on the Battery Miner

  24. Slide 24: APPENDICES

    APPENDICES • Graphite Price Trend Jan 2016 to May 2018 - Montepuez • Graphite Price Trend Jan 2016 to May 2018 - Balama Central • Key Milestones for BAT • Mineral Resources and Ore Reserves (slides 28 to 31) 24

  25. Slide 25: Graphite Price Trend Jan 2016 to May 2018

    Graphite Price Trend Jan 2016 to May 2018 Montepuez Basket Price Graphite commodity prices have steadily Flake Graphite Price Trend Jan 16 - May 18 improved since March/April 2017 $2,500 USD, Metric tonnes Data source: Benchmark Mineral Intelligence $2,000 Montepuez: Battery Minerals - Flake Graphit

  26. Slide 26: Graphite Price Trend Jan 2016 to May 2018 (cont)

    Graphite Price Trend Jan 2016 to May 2018(cont) Balama Central Basket Price $2,500 Flake Graphite Price Trend Jan 16 - May 18 Balama Central Graphite Project USD, Metric tonnes Data source: Benchmark Mineral Intelligence  Higher Jumbo and Large flake product $2,000  Higher basket price of circa US

  27. Slide 27: Key Milestones for BAT

    Key Milestones for BAT Milestone Status • Environmental Impact Assessment  Completed and Approved, 2017 • PFS,DFS and Value Engineering Studies  Completed, 2017 • Detailed engineering, early works & procurement  Completed • Port Allocation from government for Pemba port  100,000tpa export capaci

  28. Slide 28: Montepuez Ore Reserves and Mineral Resources

    Montepuez Ore Reserves and Mineral Resources • Ore Reserve Estimate January 2017 for Buffalo and Elephant deposits is 41.4Mt @ 8.80% TGC for 3.64Mt of graphite reported at a cut-off grade of 4% TGC • Total Mineral Resource January 2017 for Buffalo and Elephant deposits is 105.9Mt @ 7.74% TGC for 8.2

  29. Slide 29: Montepuez Mineral Resource Statement

    Montepuez Mineral Resource Statement Total Mineral Resource January 2017 for Buffalo and Elephant deposits is 105.9Mt @ 7.74% TGC for 8.2Mt of graphite reported at a 2.5% TGC cut-off ELEPHANT RESOURCE @ 2.5% TGC cut-off - January 2017 Contained Contained Tonnes TGC V2O5 Classification Type Graphite

  30. Slide 30: Balama Central Mineral Resource (1)

    Balama Central Mineral Resource (1) Total Mineral Resource for Balama Central is 32.9 million tonnes at 10.2 per cent TGC for 3.36Mt of graphite reported at a 6.0% TGC cut-off and includes Indicated Resources of 26Mt @ 10.3% TGC for 2,733Kt of graphite reported at a 6.0% TGC cut-off BALAMA CENTRAL G

  31. Slide 31: Balama Central Mineral Resource (2)

    Balama Central Mineral Resource (2) Total Mineral Resource for Balama Central is 32.9 million tonnes at 10.2 per cent TGC for 3.36Mt of graphite reported at a 6.0% TGC cut-off and includes Indicated Resources of 26Mt @ 10.3% TGC1 for 2,733Kt of graphite reported at a 6.0% TGC cut-off Balama Central

Battery Minerals — Benchmark World Tour 2018 on 6ix