Bonterra Resources, Inc. · TSXV:BTR

Bonterra Resources — Investor Presentation (February 2020)

32 slides from Bonterra Resources's investor presentation, February 2020

  1. Slide 1: Developing Québec's Next Gold Camp

    TSX-V BTR | OTCQX BONXF | FSE 9BR2 Developing Québec’s NEXT GOLD CAMP Exploration and Resource Development in the URBAN-BARRY CAMP FEBRUARY 2020

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements This presentation contains "forward-looking information" within the meaning of Canadian securities legislation. Any information herein with respect to predictions, expectations, projections, objectives, assumptions or future events that are not historical facts may be "for

  3. Slide 3: Why Bonterra Resources

    Why Bonterra Resources Quebec– Top 4 Mining Jurisdiction in the World 2.1Million Ounce NI 43-101 Resource Estimate 3 Flagship Properties 36,000 Hectare Land Position Permitted Mill 800 Ton per Day District Play with 7 Million ozs Discovered to Date Bulk Sample and PFS Expected in 2020 10 Drills Turn

  4. Slide 4: Bonterra Assets | Land Position

    Bonterra Assets | Land Position N Bachelor Mill BACHELOR PROPERTY 12,000 hectares Desmaraisville MOROY PROJECT M&I 667,000T @ 5.17 g/t Au: 111,000 oz Inferred 396,000T @ 4.32 g/t Au: 55,000 oz URBAN-BARRY PROPERTY 22,000 hectares BARRY PROJECT Indicated: 2,052,000T @ 5.84 g/t Au: 385,000 oz Windfall

  5. Slide 5: Directors & Management Group

    Bonterra | Directors & Management Group Greg Gibson Johnny Oliveira Jamie Lavigne Pascal Hamelin Chairman & CEO Chief Financial Officer P.Geo, VP Exploration VP Operations Mr. Gibson is President and CEO Mr. Oliveira has 20 years of experience Jamie Lavigne is an experienced Pascal holds a Mining En

  6. Slide 6: Capital Structure

    Capital Structure | as at February 26, 2020 Strong cash position Kirkland Lake Gold Sodemex 12.5% Development Fund Strong Institutional 2.7% Nine Point Partners LP Ownership Sentry 7.0% Investment Mgt Eric Sprott 5.1% 6.9% Capital Structure(1) BTR VanEck Issued & Outstanding Shares 77.5 M Investment

  7. Slide 7: Gold Resources

    Bonterra Assets | Gold Resources NI 43-101 Mineral Resource Estimate - May 28th, 2019 MEASURED INDICATED INFERRED DEPOSIT Tonnes Au (g/t) Ounces Au Tonnes Au (g/t) Ounces Au Tonnes Au (g/t) Ounces Au Gladiator - - - 743,000 8.46 202,000 3,065,000 9.10 897,000 Barry - - - 2,052,000 5.84 385,000 2,740

  8. Slide 8: Gladiator Project

    Bonterra Assets | Gladiator Project 8

  9. Slide 9: Gladiator Project Gold Resource Block Model

    Bonterra Assets | Gladiator Project Gold Resource Block Model Indicated: 743,000 t @ 8.5 g/t, 202,000 oz Inferred: 3,065,000 t @ 9.1 g/t, 897,000 oz Vertical Long Section Looking Northwest, Resource Block Model, All Lenses Projected to Section Au (g/t) 1 3.5 5 300 m 300 m 600 m 600 m 900 m 900 m OPE

  10. Slide 10: Gladiator Project Vertical Cross Section

    Bonterra Assets | Gladiator Project Vertical Cross Section Looking Southwest with Selected 2019 Results and up-dip Target Area Target Area BA-19-39: 5.5 g/t Au over 1.5 m Legend Mineralized Zone Blocks above cut-off grade Felsic Dyke Shear Zone BA-19-40: 101.1 g/t Au over 3.9 m Drill Intersept 10

  11. Slide 11: St. Cyr Priority Target Areas - Total Magnetic Intensity

    Bonterra Assets | Gladiator Project St. Cyr Priority Target Areas - Total Magnetic Intensity 11

  12. Slide 12: St. Cyr Priority Target Areas - Geology

    Bonterra Assets | Gladiator Project St. Cyr Priority Target Areas - Geology 12

  13. Slide 13: Barry Project

    Bonterra Assets | Barry Project 13

  14. Slide 14: Barry Project Gold Resource Block Model

    Bonterra Assets | Barry Project Gold Resource Block Model Indicated Resources: 2,052,000 t @ 5.8 g/t; 385,000 oz Inferred Resources: 2,740,000 t @ 5.1 g/t; 453,000 oz Vertical Long Section Looking Northwest, Resource Block Model, All Lenses Projected to Section Au (g/t) 1 3.5 5 OPEN 300 m 300 m 600

  15. Slide 15: Barry Deposit Plan Map with IP

    Bonterra Assets | Barry Project Barry Deposit Plan Map with IP (Chargeability) Contoured, Lakes and 2019 Extensional Drilling Intercepts with Prioritized Domain Extension Targets Legend Gold Intersection 2019 / Barry Mineralized Zone Chargeability Target Chargeability Target 5.9 g/t Au over 1.5 m Ch

  16. Slide 16: Underground Drilling Plan and Selected Results

    Bonterra Assets | Barry Project Underground Drilling Plan and Selected Results 16

  17. Slide 17: Resource Expansion Targets – Total Magnetic

    Bonterra Assets | Barry Project Resource Expansion Targets – Total Magnetic 17

  18. Slide 18: Moroy Project

    Bonterra Assets | Moroy Project 18

  19. Slide 19: M1 Zone Long Section Looking East

    Bonterra Assets | Moroy Project M1 Zone Long Section Looking East 19

  20. Slide 20: Vertical Cross Section Looking East

    Bonterra Assets | Moroy Project Vertical Cross Section Looking East 20

  21. Slide 21: M4 Zone Plan view

    Bonterra Assets | Moroy Project M4 Zone Plan view 21

  22. Slide 22: Moroy Bulk Sample

    Bonterra Assets | Moroy Bulk Simple Moroy is developed to the mineralization on level 11 Moroy Project Bachelor Shaft Bachelor Mine Level 11, Plan view Bulk Sample Area 22

  23. Slide 23: Level 11 Bulk Sample Longitudinal and Timeline

    Bonterra Assets | Moroy Bulk Simple Level 11, Bulk Sample Longitudinal Bulk Sample Timeline • Drilling & Blasting: • January – April Sub 4 • Milling: • April – May Sub 3 • Reconciliation • June Sub 2 Sub 1 Level 11 Planned stopes 23

  24. Slide 24: Regional Exploration

    Bonterra Assets | Regional Exploration 24

  25. Slide 25: Urban-Barry Property Targeting

    Bonterra Assets | Regional Exploration Urban-Barry Property Targeting 25

  26. Slide 26: Bachelor Property Targeting

    Bonterra Assets | Regional Exploration Bachelor Property Targeting 26

  27. Slide 27: Bachelor Mill and Urban-Barry Camp

    Bonterra Assets | Bachelor Mill Bachelor Mill and Urban – Barry Camp N 24,000 oz 82,300 oz Gandex Lac Short 45,000 oz Chibougamau Mariposite 28,000 oz 6,700 oz Cartwright Lac Rose 64,800 oz Chapais Fenton Lake South Matagami Bachelor Mill MONSTER LAKE 303,700 oz Inferred1.1 Mt @ 12.14 g/t/ 433,000 o

  28. Slide 28: Bachelor Mill

    Bonterra Assets | Bachelor Mill Mill permitting process began in April 2017 to increase the existing mill capacity from 800 to 2,400 tpd PROJECT SCOPE: Remove existing 10x12 rod mill, 3 small ball mills Add a SAG mill (6.4 m x 4.0 m, 2,240 kW) Add one ball mill ( 4.7 m x 6.4 m, 2,238 kW) Add a 75 ft

  29. Slide 29: Timeline

    Bonterra Assets | Timeline 29

  30. Slide 30: The Bottom Line

    The Bottom Line Quebec– Top 4 Mining Jurisdiction in the World 2.1Million Ounce NI 43-101 Resource Estimate 3 Flagship Properties 36,000 Hectare Land Position Permitted Mill 800 Ton per Day District Play with 7 Million ozs Discovered to Date Bulk Sample and PFS Expected in 2020 10 Expansion, Infill,

  31. Slide 31: Allan Folk, VP Investor Relations

    Allan Folk 2872 Ch. Sullivan Bur. 2 VP Investor Relations Val-d’Or, Quebec J9P 0B9 ir@btrgold.com +1 819-825-8678 www.btrgold.com TSX-V BTR | OTCQX BONXF | FSE 9BR2

  32. Slide 32: Appendix 1: Model Parameters

    Appendix 1 Model Parameters 1. The classific ation of the current Mineral R esource Es timates into Measured, Indic ated and Inferred are c onsistent with c urrent 2014 CIM Definiti on Standards - F or Mineral Res ourc es and Mineral Reserves 2. Mineral resourc es which are not mineral reserv es do

Bonterra Resources — Investor Presentation (February 2020) on 6ix