Sky Metals Limited · ASX:SKY
Sky Metals — Investor Presentation (September 2023)
22 slides from Sky Metals's investor presentation, September 2023

Slide 1: Developing Large Scale Tin Deposits in NSW – To Feed Global Electrification
DEVELOPING LARGE SCALE TIN DEPOSITS IN NSW – TO FEED GLOBAL ELECTRIFICATION SEPTEMBER 2023

Slide 2: Disclaimer - Important Information
A SX: S K Y D IS C L A IM E R - IM P O R T A N T IN F O RM A TIO N Disclaimer Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by such forward looking informatio

Slide 3: Experienced and Proven Management
AS X : SKY S K Y’ S T E A M EXPERIENCED AND PROVEN MANAGEMENT NORMAN SECKOLD | Chairman RICHARD HILL | Non-Executive Director CAPITAL STRUCTURE 30+ years in the full-time management of natural resource 25+ years experience in the mineral resources sector as a Shares on issue 454.6M companies. Past C

Slide 4: Tin: Key Technology Metal
ASX: S K Y A P P E N D IX : T IN M A R K E T TIN: KEY TECHNOLOGY METAL Supply crunch driven by 30+ year under investment & growing demand for tin primarily within EVs, Renewable Energy and all electronic goods. Demand Increase with Emerging Technologies

Slide 5: Tin: The Forgotten Electrification Metal – Global Supply Constraints
ASX: S K Y T IN M A R K E T Visible Global Tin Stockpiles TIN: THE FORGOTTEN ELECTRIFICATION METAL – GLOBAL SUPPLY CONSTRAINTS Inelastic tin price driven by irreplaceable demand in electronics sector and global electrification. Record low stockpiles – US strategic stockpile depleted, Chinese stockpi

Slide 6: Tallebung Tin Project: Major Historic Tin Operation
ASX : SKY TALLEBUNG TIN PROJECT MAJOR HISTORIC TIN OPERATION • Tin discovered in the 1890s and mined into the mid-1980s. • Small shafts and open pits mined hardrock tin veins until large scale alluvial mining production in the 1960s-70s. • Infrastructure already in place from previous mining include

Slide 7: Large Historic Open Pit Alluvial Mining Operation
ASX : SKY T A L L E B U N G T IN P R O J E CT LARGE HISTORIC OPEN PIT ALLUVIAL MINING OPEATION 7

Slide 8: Tallebung Tin Project: Large Hardrock Tin Resource
ASX : SKY TALLEBUNG TIN PROJECT LARGE HARDROCK TIN RESOURCE • Maiden MRE completed, March 2023: 10.2 Mt @ 0.18% Tin for 18kt of contained Tin. • Initial Exploration Target estimate: 16 – 21 Mt @ 0.16 – 0.20% Tin • Tin mineralisation highly amenable to 3x upgrade using TOMRA Ore Sorting – 0.18% Tin t

Slide 9: TOMRA – Game Changer
ASX : SKY T A L L E B U N G T IN P R O J E CT Cassiterite Ore from Tallebung – Scale in mm Black Tin – cassiterite “nuggets” detected by ore sorter and accepted TOMRA – GAME CHANGER Host rock and quartz vein without tin are rejected by ore sorter • TOMRA Ore Sorting more than triples grade (+300%).

Slide 10: TOMRA – Game Changer (video)
ASX : SKY T A L L E B U N G T IN P R O J E CT TOMRA – GAME CHANGER 10 Video Courtesy of Carlos Crowley Vazquez, BOEq and TOMRA Ore Sorting Solutions

Slide 11: TOMRA – Proven Technology
ASX : SKY T A L L E B U N G T IN P R O J E CT TOMRA – PROVEN TECHNOLOGY • Renison Tin Mine, Australia’s largest operating tin mine, uses TOMRA Ore Sorters to increase tin grade and decrease mass for processing – reducing processing costs. • TOMRA Ore Sorters commissioned at Rension 5 years ago in 20

Slide 12: Exceptional, Consistent TOMRA Ore Sorting Results
ASX : SKY Feed: 0.18% Tin T A L L E B U N G T IN P R O J E CT EXCEPTIONAL, CONSISTENT TOMRA ORE SORTING RESULTS • TOMRA Ore Sorting first tested on drill chips from Tallebung, successfully demonstrated: Rejected Accepted • Upgrading of 0.19% tin to 0.70% tin • +96% recovery of tin Waste: <0.01% Tin

Slide 13: Uniquely Simple Metallurgy – Low-Cost Processing
ASX : SKY T A L L E B U N G T IN P R O J E CT UNIQUELY SIMPLE METALLURGY – LOW-COST PROCESSING • Simple, conventional gravity circuit produces a very desirable +60% tin concentrate for sale. • TOMRA Sorting and DMS results in only a Cassiterite Ore from Tallebung – Scale in mm quarter of mined mass

Slide 14: Resource Growth Potential and Shallow High-Grade Start Up
ASX : SKY T A L L E B U N G T IN P R O J E CT RESOURCE GROWTH POTENTIAL AND SHALLOW HIGH-GRADE START UP • Gravity anomaly coincident with tin mineralisation extends well beyond current extent of drilling. • Shallow, at surface high-grade tin zone identified for fast payback potential at commencement

Slide 15: Next Steps
ASX : SKY T A L L E B U N G T IN P R O J E CT NEXT STEPS Expand the maiden MRE and convert +20Mt Exploration Target. Drill high-grade tin zones and grow an Indicated Resource for Mine Scoping Studies. Bulk sampling across the deposit, growing confidence in low cost sorting upgrade and metallurgy. Re

Slide 16: Developing Large Scale Tin Deposits in NSW – To Feed Global Electrification
DEVELOPING LARGE SCALE TIN DEPOSITS IN NSW – TO FEED GLOBAL ELECTRIFICATION

Slide 17: Upcoming Work Program
ASX : SKY W O R K P R O GR A M UPCOMING WORK PROGRAM Indicative Work Program Timeline • Assess the mining economics at FY2024 Tallebung once Indicated Project Activities Q1 Q2 Q3 Resources have been defined. Resource Infill and Tallebung • Expand the Tallebung Resource and Extension Drilling Program

Slide 18: Narriah Project – Tin-Tungsten-Lithium
AS X: S K Y A P P E N D IX : N A R R IA H P R O J E C T NARRIAH PROJECT – TIN-TUNGSTEN-LITHIUM • 59 rock chips have been taken from six major workings. • Preliminary assay results show multiple +0.5% Tin, +0.2% Tungsten and +0.1% Lithium rock chips. • Previous drilling of only three percussion holes

Slide 19: Doradilla – 16km Mineral Powerhouse
ASX : SKY A P P E N D IX : D O R A D ILLA P R O J E CT DORADILLA – 16km MINERAL POWERHOUSE SCHEMATIC LONG SECTION

Slide 20: Tin and REE Potential
ASX : SKY A P P E N D IX : D O R A D ILLA P R O J E CT TIN AND REE POTENTIAL • Three tin deposits previously discovered in the 1970s, namely Doradilla, Midway and 3KEL, the 16km strike of these is named the ‘DMK’ Line. • SKY has discovered REE within the tin deposits in all three deposits on the ‘DM

Slide 21: Next Steps
ASX : SKY A P P E N D IX : D O R A D ILLA P R O J E CT NEXT STEPS Further assaying of previous historic drilling for REE – 100s of holes drilled for tin along the DMK Line, SKY has only assayed 46 holes for REE so far. Drilling program planned to test Midway Granite targets and to infill between Mid

Slide 22: Tin: The Forgotten Electrification Metal
ASX: S K Y A P P E N D IX : T IN M A R K E T TIN: THE FORGOTTEN ELECTRIFICATION METAL Inelastic tin price driven by irreplaceable demand in electronics sector 20-year 3M tin price (AUD/tonne) (source: LME).
Source: Internet Archive copy of skymetals.com.au
More decks from Sky Metals Limited
Investor Presentation (November 2026)33 slides · Nov 10, 2026
Technical Presentation (August 2026)25 slides · Aug 10, 2026
Noosa Mining Investor Conference (July 2026)20 slides · Jul 24, 2026
Resources Rising Stars Conference (April 2026)21 slides · Apr 9, 2026
Investor Presentation (November 2025)21 slides · Dec 2, 2025
NSW Government Critical Minerals Investment Showcase 202523 slides · Oct 20, 2025