Bumi Armada Bhd. · MYX:ARMADA

Bumi Armada Bhd — Shareholder Meeting (May 2016)

17 slides from Bumi Armada Bhd's shareholder meeting presentation, May 23, 2016

  1. Slide 1: Annual General Meeting

    Slide 1: Annual General Meeting

    Annual General Meeting 23rd May 2016 “Knots Ahead of the Rest”

  2. Slide 2: Macro Background

    Slide 2: Macro Background

    Macro Background  Oil price resumed the downtrend in 3rd Quarter 2015 and bottomed out at USD27 in 1st Quarter 2016.  In 2015, Global E&P capital spending declined by 23% (USD165b) to USD545b in 2015 (2014 : USD710b) and is expected to decline a further 10-15% in 2016.  Globally, a total of 350,0

  3. Slide 3: Results Overview – FY 2015 vs. FY 2014 (RM'mil)

    Slide 3: Results Overview – FY 2015 vs. FY 2014 (RM'mil)

    Results Overview – FY 2015 vs. FY 2014 (RM’mil) Revenue EBITDA Net Profit / (Loss) Core net profit / (loss) +7.3% +15.5% -9.1% 224.4 369.7 2,397.3 981.0 914.0 320.1 2,197.7 290.4 224.4 >-100% FY 2014 FY 2015 FY 2014 FY 2015 (73.7) FY 2014 FY 2015 FY 2014 FY 2015 (241.7) (241.8) Net profit / (loss) E

  4. Slide 4: Revenue composition by segments – FY 2015 vs. FY 2014 (RM'mil)

    Slide 4: Revenue composition by segments – FY 2015 vs. FY 2014 (RM'mil)

    Revenue composition by segments – FY 2015 vs. FY 2014 (RM’mil) Performance in established segments driven by the underlying activities FPSO OSV 1,305.6 654.6 -17.8% +37.6% 538.1 949.1 T&I 793.6 FY 2014 FY 2015 FY 2014 FY 2015 -57.7% Higher conversion activity from the ENI 1506 FPSO Decrease in OSV v

  5. Slide 5: Businesses in 2015

    Slide 5: Businesses in 2015

    Businesses in 2015 “Knots Ahead of the Rest”

  6. Slide 6: Global presence

    Slide 6: Global presence

    Global presence Main Assets ae BUMIARMADA VW 6

  7. Slide 7: Increasing project and technical complexity

    Slide 7: Increasing project and technical complexity

    Increasing project and technical complexity Vessel Name Vessel Size Topsides Weight Turret / Mooring Armada Perkasa Panamax 3,000 Spread moored Armada Perdana Suezmax 4,200 Spread moored Armada Sterling Aframax 6,500 Internal Turret Suezmax 6,500 External Dis-connectable Armada Claire Turret Aframax

  8. Slide 8: FPSO Project Updates as at Q1 2016

    Slide 8: FPSO Project Updates as at Q1 2016

    FPSO Project Updates as at Q1 2016 FPSO KRAKEN PROJECT • Client/Operator: EnQuest Plc. • Location: UKCS Block 9/02b, 400 km North East of Aberdeen and 40 km west of the Frigg Field. • Contract: Awarded 20th December 2013 worth USD2.2 billion. Fixed 8 years with options for 17 yearly extensions. • FP

  9. Slide 9: FPSO Project Updates as at Q1 2016

    Slide 9: FPSO Project Updates as at Q1 2016

    FPSO Project Updates as at Q1 2016 FPSO 15-06 PROJECT • Client/Operator: ENI. • Location: Block 15/06, East Hub Field, Angola. • Contract: Awarded 20th August 2014 worth USD3.9 billion. Fixed 12 years with options for 8 yearly extensions. • FPSO Specification: 80,000bopd oil production and 1,800,000

  10. Slide 10: FPSO Project Updates as at Q1 2016

    Slide 10: FPSO Project Updates as at Q1 2016

    FPSO Project Updates as at Q1 2016 FPSO MADURA PROJECT • Client/Operator: Husky-CNOOC Madura Limited (HCML). • Location: Madura Strait East Java, about 65 km east of Surabaya and about 16km south of Madura Island, Indonesia. • Contract: Awarded 11th December 2014 worth USD1.3 billion. Fixed 10 years

  11. Slide 11: FGS Project Updates as at Q1 2016

    Slide 11: FGS Project Updates as at Q1 2016

    FGS Project Updates as at Q1 2016 FGS MALTA FSU PROJECT • Client/Operator: ElectroGas Malta Limited. • Location: LNG Receiving Terminal, Delimara, Malta. • Contract: Awarded 14th April 2014 worth USD300 million. Fixed 18 years and 2 months. • FSU specification: 10-150m3/hr sendout . Boil Out Gas sen

  12. Slide 12: OMS – a global player

    Slide 12: OMS – a global player

    OMS – a global player • Completed the three ice-class vessels which have departed for the Caspian Sea. • Secured a number of new short-term or spot charters. • Challenging year ahead as utilisation remains weak (15 OSVs are currently stacked). • Armada Installer continued to work under its contract

  13. Slide 13: Safe operations

    Slide 13: Safe operations

    Safe operations Corporate HSSEQ • Two major industry workshops were conducted covering Environmental risk management, with the UK Institute of Marine Engineering, Science and Technology (IMAREST) and Maritime/shipping risks with the American Bureau of Shipping, ABS. Safety Milestones: Development Pr

  14. Slide 14: Order book as at 31 December 2015

    Slide 14: Order book as at 31 December 2015

    Order book as at 31 December 2015 Quality firm order book stands at RM27.5 bil As at 31 December 2015, the Group’s firm order book stood at RM27.5 bil. Upon expiration of the firm contract period, certain contracts contain extension options which are renewable on annual basis with a total potential

  15. Slide 15: Leverage and capitalisation

    Slide 15: Leverage and capitalisation

    Leverage and capitalisation Financial capacity intact to execute existing projects Net Debt / EBITDA(1) Gearing ratio(2) 4.0x 3.9x 4.9x 5.1x 4.8x 4.8x 3.4x 3.3x 3.2x 2.3x 0.9x 1.1x 0.9x 0.7x 1.9x 0.9x 2008 2009 2010 2011 2012 2013 2014 2015 2008 2009 2010 2011 2012 2013 2014 2015 (1) Calculated base

  16. Slide 16: On-going actions

    Slide 16: On-going actions

    On-going actions • Focus on the conversion of the four new projects. • Continue to generate net positive cash flow from operations. • Focus on cost efficiency and cost reductions. • Strong foundation laid for future growth. • Exploring alternative funding models to grow the FPSO business. • 2017 wil