Annual General Meeting 23rd May 2016 “Knots Ahead of the Rest”

Slide 2: Macro Background
Macro Background Oil price resumed the downtrend in 3rd Quarter 2015 and bottomed out at USD27 in 1st Quarter 2016. In 2015, Global E&P capital spending declined by 23% (USD165b) to USD545b in 2015 (2014 : USD710b) and is expected to decline a further 10-15% in 2016. Globally, a total of 350,0

Slide 3: Results Overview – FY 2015 vs. FY 2014 (RM'mil)
Results Overview – FY 2015 vs. FY 2014 (RM’mil) Revenue EBITDA Net Profit / (Loss) Core net profit / (loss) +7.3% +15.5% -9.1% 224.4 369.7 2,397.3 981.0 914.0 320.1 2,197.7 290.4 224.4 >-100% FY 2014 FY 2015 FY 2014 FY 2015 (73.7) FY 2014 FY 2015 FY 2014 FY 2015 (241.7) (241.8) Net profit / (loss) E

Slide 4: Revenue composition by segments – FY 2015 vs. FY 2014 (RM'mil)
Revenue composition by segments – FY 2015 vs. FY 2014 (RM’mil) Performance in established segments driven by the underlying activities FPSO OSV 1,305.6 654.6 -17.8% +37.6% 538.1 949.1 T&I 793.6 FY 2014 FY 2015 FY 2014 FY 2015 -57.7% Higher conversion activity from the ENI 1506 FPSO Decrease in OSV v

Slide 5: Businesses in 2015
Businesses in 2015 “Knots Ahead of the Rest”

Slide 6: Global presence
Global presence Main Assets ae BUMIARMADA VW 6

Slide 7: Increasing project and technical complexity
Increasing project and technical complexity Vessel Name Vessel Size Topsides Weight Turret / Mooring Armada Perkasa Panamax 3,000 Spread moored Armada Perdana Suezmax 4,200 Spread moored Armada Sterling Aframax 6,500 Internal Turret Suezmax 6,500 External Dis-connectable Armada Claire Turret Aframax

Slide 8: FPSO Project Updates as at Q1 2016
FPSO Project Updates as at Q1 2016 FPSO KRAKEN PROJECT • Client/Operator: EnQuest Plc. • Location: UKCS Block 9/02b, 400 km North East of Aberdeen and 40 km west of the Frigg Field. • Contract: Awarded 20th December 2013 worth USD2.2 billion. Fixed 8 years with options for 17 yearly extensions. • FP

Slide 9: FPSO Project Updates as at Q1 2016
FPSO Project Updates as at Q1 2016 FPSO 15-06 PROJECT • Client/Operator: ENI. • Location: Block 15/06, East Hub Field, Angola. • Contract: Awarded 20th August 2014 worth USD3.9 billion. Fixed 12 years with options for 8 yearly extensions. • FPSO Specification: 80,000bopd oil production and 1,800,000

Slide 10: FPSO Project Updates as at Q1 2016
FPSO Project Updates as at Q1 2016 FPSO MADURA PROJECT • Client/Operator: Husky-CNOOC Madura Limited (HCML). • Location: Madura Strait East Java, about 65 km east of Surabaya and about 16km south of Madura Island, Indonesia. • Contract: Awarded 11th December 2014 worth USD1.3 billion. Fixed 10 years

Slide 11: FGS Project Updates as at Q1 2016
FGS Project Updates as at Q1 2016 FGS MALTA FSU PROJECT • Client/Operator: ElectroGas Malta Limited. • Location: LNG Receiving Terminal, Delimara, Malta. • Contract: Awarded 14th April 2014 worth USD300 million. Fixed 18 years and 2 months. • FSU specification: 10-150m3/hr sendout . Boil Out Gas sen

Slide 12: OMS – a global player
OMS – a global player • Completed the three ice-class vessels which have departed for the Caspian Sea. • Secured a number of new short-term or spot charters. • Challenging year ahead as utilisation remains weak (15 OSVs are currently stacked). • Armada Installer continued to work under its contract

Slide 13: Safe operations
Safe operations Corporate HSSEQ • Two major industry workshops were conducted covering Environmental risk management, with the UK Institute of Marine Engineering, Science and Technology (IMAREST) and Maritime/shipping risks with the American Bureau of Shipping, ABS. Safety Milestones: Development Pr

Slide 14: Order book as at 31 December 2015
Order book as at 31 December 2015 Quality firm order book stands at RM27.5 bil As at 31 December 2015, the Group’s firm order book stood at RM27.5 bil. Upon expiration of the firm contract period, certain contracts contain extension options which are renewable on annual basis with a total potential

Slide 15: Leverage and capitalisation
Leverage and capitalisation Financial capacity intact to execute existing projects Net Debt / EBITDA(1) Gearing ratio(2) 4.0x 3.9x 4.9x 5.1x 4.8x 4.8x 3.4x 3.3x 3.2x 2.3x 0.9x 1.1x 0.9x 0.7x 1.9x 0.9x 2008 2009 2010 2011 2012 2013 2014 2015 2008 2009 2010 2011 2012 2013 2014 2015 (1) Calculated base

Slide 16: On-going actions
On-going actions • Focus on the conversion of the four new projects. • Continue to generate net positive cash flow from operations. • Focus on cost efficiency and cost reductions. • Strong foundation laid for future growth. • Exploring alternative funding models to grow the FPSO business. • 2017 wil

Slide 17: Thank You
Thank You “Knots Ahead of the Rest”
Source: Internet Archive copy of bumiarmada.com
More decks from Bumi Armada Bhd.
Q2 2026 Earnings Presentation20 slides · Aug 27, 2026
Q1 2026 Earnings Presentation17 slides · May 21, 2026
Q4 2025 Earnings Presentation18 slides · Feb 27, 2026
Q3 2025 Earnings Presentation17 slides · Nov 27, 2025
Q2 2025 Earnings Presentation16 slides · Aug 28, 2025
Q1 2025 Earnings Presentation15 slides · May 22, 2025