  1. Slide 1: Strengthening our precious metals position

    Strengthening our precious metals position RBC Annual Silver Conference December 11, 2012 David Giles, VP Exploration

  2. Slide 2: Disclaimer

    Disclaimer This document includes statements that are, or may be deemed to be, “forward-looking statements”. These forward- looking statements can be identified by the use of forward-looking terminology, including the terms “believes”, “estimates”, “plans”, “projects”, “anticipates”, “expects”, “int

  3. Slide 3: About Fresnillo

    About Fresnillo • World’s largest silver producer & Mexico’s second largest gold producer Who we are • Total workforce of 5,303 people • Mining concessions of 2.1m hectares in Mexico & 78,800 ha in Peru • Headquartered in Mexico City; listed in London and Mexico • Exploration, development, construct

  4. Slide 4: Consistent business model and unchanged strategy

    Consistent business model and unchanged strategy 1 2 Maximise the potential of Deliver growth through existing operations development projects • Operate at 100% capacity • Focus on delivery timeline • Low-cost producer • Disciplined CAPEX control • Optimise mining method • Specialized Engineering an

  5. Slide 5: Where we operate

    Where we operate Three operating mining districts and two regions with potential to become districts in the future ORISYVO HERRADURA Fresnillo plc mines (7) SAN JULIÁN DISTRICT Development projects (3) Advanced exploration projects (4) Prospects in drilling (45 aprox) Prospects at an early stage CIÉ

  6. Slide 6: Mining Districts

    Mining Districts HERRADURA DISTRICT • Mines: Herradura, Soledad-Dipolos and Noche Buena • 2011 production: 272.3k oz gold • Resources: 5.09 Moz gold • Projects: Dynamic Leaching Plant • Exploration: Centauro Deep, Tajitos, Choya, San Javier, Las Norias, El Nudo, Carina, Cerritos, El Dorado CIÉNEGA D

  7. Slide 7: Districts of the Future

    Districts of the Future SAN JULIÁN • Under construction • Silver-gold veins and disseminated ore body • Resources: 153.8 Moz silver, 780 koz gold • Approved CAPEX: US$500m • Flotation plant with 6,000 tpd capacity • Dynamic leaching plant with 3,000 tpd capacity • Average expected level of productio

  8. Slide 8: Operations and Business Review

    Operations and Business Review

  9. Slide 9: Year so far: Jan to Sept 2012

    Year so far: Jan to Sept 2012 • Record attributable gold production of 375,637 ounces, up 15.1% • Attributable silver production (incl Silverstream) of 30.4moz, down 3.6% • On track to achieve full year production targets of 41moz of silver (including Silverstream) and 460,000oz of attributable gold

  10. Slide 10: Operations Review

    Operations Review On track to achieve annual silver production target of 41Moz and 460,000 ounces of gold. 2011 PRODUCTION JAN-SEP PRODUCTION SILVER GOLD SILVER GOLD (Koz) (Oz) (Koz) (Oz) Fresnillo mine Silver underground mine 30,295 26,237 19,897 22,857 Saucito mine Silver underground mine 5,904 33

  11. Slide 11: First half 2012 Adjusted Revenues

    First half 2012 Adjusted Revenues1 Product contribution by mine Mine contribution by product (US$ M) (US$ M) 1Adjusted Revenue is revenue as disclosed in the income statement adjusted to exclude treatment and refining charges 11

  12. Slide 12: Financial highlights

    Financial highlights FY 2011 H1 2012 Average silver price US$/Oz 34.8 31.0 Average gold price US$/Oz 1,585.3 1,645.5 Revenues US$ million 2,192.7 1,085.2 Gross Profit US$ million 1.563.5 705.4 EBITDA US$ million 1,538.5 684.4 EBITDA margin 70.2% 63.1% Profit attributable to equity shareholders of th

  13. Slide 13: The Opportunity

    av FRESNILLO. - Soon Bea Hit 4 o The Opportunity

  14. Slide 14: Exploration and Development

    Exploration and Development Fresnillo District • 60moz resource identified deep near Total revised exploration budget for 2012: US$338 m San Carlos shaft • New vein drilled south of mine area Budget Herradura District allocation • Drilling continued at Centauro pit with good intersections to over 14

  15. Slide 15: On track to achieve production targets

    On track to achieve production targets SILVER GOLD MOz KOz 65 MOz 500 KOz Saucito I (ramp-up) Dynamic leaching plant Saucito II Noche Buena (ramp-up San Julián and expansion) Juanicipio San Julián Expansion at Fresnillo Centauro Deep On track to produce 65 million ounces of silver and over 500,000 o

  16. Slide 16: Project delivery programme

    Project delivery programme On track to produce 65moz of silver and 500,000 oz of gold by 2018 Expected YEAR 2012 2013 2014 2015 2016 2017 2018 Production PROJECT 50 thd Oz DYNAMIC LEACHING CONSTRUCTION PRODUCTION Au (Optimization project) 10 mill Oz DETAILED Ag y 45 thd SAN JULIÁN CONSTRUCTION PRODU

  17. Slide 17: Conclusion

    FRESNILLO. Conclusion

  18. Slide 18: Fresnillo remains on track to achieve our goal

    Fresnillo remains on track to achieve our goal • In 2012 we focused on: – Improving our safety culture and systems at all levels – Ramping up production at the Noche Buena mine – Continue development at Centauro Deep and Orisyvo – Expanding our resource base to help support our long term-targets – R

  19. Slide 19: Conclusion and Outlook

    Conclusion and Outlook We will continue to build upon our competitive differentiators: Operational excellence World class assets Experienced personnel, efficient mining We operate the largest primary silver mine in methods, continuous reserve replenishment the world and control the largest area of a