  1. Slide 1: Corporate Presentation

    Corporate Presentation Nov. 2019 1

  2. Slide 2: Disclaimer

    Disclaimer This document contains forward-looking statements that involve risks and uncertainties. These statements may generally, but not always, be identified by the use of words such as “outlook”, “guidance”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “target” and similar expressions to

  3. Slide 3: Agenda

    Agenda 1. ADMIE Holding & IPTO Overview 2. Islands Interconnection 3. Ariadne Interconnection 4. GRID Telecom Key Speaker: 5. Peer group analysis Iason Rousopoulos Chairman of ADMIE Holding Deputy CFO of IPTO SA

  4. Slide 4: ADMIE at a glance

    ADMIE at a glance  Sole Transmission System Operator (TSO) in Greece Transmission Distribution Generation Supply Employees Transported Energy 1.272 51.5 TWh Network1 RAB 11.732km Net Profit2 €1,5bn 111,868 km is the distance between Paris, France and Christmas Island, Australia €85.9m 2relates to F

  5. Slide 5: Investment proposition

    Investment proposition Natural monopoly in Greece 11,732 km of HV transmission lines Boosting dividend returns Reduced borrowing costs and established minimum 50% earnings Investments payout c. €4b of cumulative investments from 2019 to 2027 Rational regulatory Leading TSO as Strategic environment I

  6. Slide 6: ADMIE Holding & IPTO Overview

    1. ADMIE Holding & at a glance IPTO Overview 6

  7. Slide 7: Corporate Structure

    Corporate Structure Hellenic Silchester & Other Inst. Private Republic Funds Investors Investors 51.1% 13.0% 22.8% 13.1% 05.09.2019 Athens Stock Exchange ATHEX: ADMIE 51.0% Bloomberg: ADMIE GA Reuters: ADMr.AT 232,000,000 common shares 25.0% 24.0% 7

  8. Slide 8: Key milestones

    Key milestones • Accelerating phase D of • RAE: new Cycladic Islands regulatory review • Inauguration of Interconnection 2018-21 Attica - Crete • Entry of the Dodecanese Full Ownership • Inauguration of interconnection and North Aegean TSO legislation Unbundling law Phase A’ Cyclades Refinance of Sy

  9. Slide 9: Strategic Plan

    Strategic Plan Leadership • Acceleration of all island interconnections • Participation in Energy Exchange and implementation of the target model. Growth • Renovation and optimal management of assets • Strong financial profile Digitalization 1 2 3 • Optimization of operations, systems and procedures

  10. Slide 10: IPTO 2018 Highlights

    IPTO 2018 Highlights TOTAL REVENUES EBITDA Net PROFIT €249.2m €183 m €85.6m PY €256.5m PY €172 m PY €61.7m  Slight decrease by -6% on rent;  OPEX (ex. D&A) decreased by  Active cash management led to the amount due will be recovered -21,6%, mainly on the back of a higher financial Income by in 20

  11. Slide 11: IPTO selected items

    IPTO selected items Group IPTO S.A. Group IPTO S.A. P&L Balance sheet 2018 2018 2017 Chg yoy 31.12.2018 31.12.2018 31.12.2017 System rent 222,7 222,7 236,9 -6,0% Non-current assets 1.676,3 1.876,3 1.607,4 Total revenues 249,2 249,2 256,5 -2,8% Reversals/(Provisions & Current assets 1.436,3 1.235,9 2

  12. Slide 12: ADMIE Holding 2018 Highlights

    ADMIE Holding 2018 Highlights €42.3m €244k -75% y/y Share of +83.4% y/y Investments Reported (Income) OPEX €156k €0.20 +73.5% y/y +100% y/y Net Financial Earnings Income Per Share Active cash management benefits offset higher OPEX 12

  13. Slide 13: ADMIE Holding selected items

    ADMIE Holding selected items Balance sheet 31.12.2018 31.12.2017 P&L 2018 2017 Non-current assets 550,5 520,1 Income from Affiliate 42,4 24,0 Current assets 14,7 2,3 EBITDA 42,1 23,1 of which: Cash & equiv. 4,8 2,2 Operating Income 42,1 23,0 Total Assets 565,2 522,4 Net profit 42,3 23,0 Cash flows 2

  14. Slide 14: IPTO 2018-2023 outlook

    IPTO 2018-2023 outlook EUR 2018 Guidance Comments Regulated €1.45B ~€2.60B (2023) Increase 80% Asset Base (RAB)* Investments Ariadne Interconnection €171M ~ €2.20B (2023) (System & Users) included Consolidated with Ariadne EBITDA* €183.6M ~ €280M (2023) Interconnection Dividend ~ €0.0316 ~€0.09 (202

  15. Slide 15: Tax adjustments in 2019 enhancing business

    Tax adjustments in 2019 enhancing business Two major taxation changes during 2019*:  Corporate tax from 28%24%  Dividend tax from 10%5% *Formal announcement has been made from the Government. It is expected to be voted soon 17

  16. Slide 16: Islands Interconnection

    2. Islands at a glance Interconnection 16

  17. Slide 17: Islands Interconnection

    Islands Interconnection Main Objectives System stability Ensuring a safe supply of energy for the islands electricity system Cost Reduction • Drastic reduction of electricity generation cost in the islands • Substitution of oil units with RES plants and imports from the mainland PSOs elimination Mor

  18. Slide 18: Main investment projects 2019-2028

    Main investment projects 2019-2028 Capex for the period according to the submitted Ten Year Network Development Plan (TYNPD) Expected Project Cost ID Project description commissioning (2019-28) €m Corridor A’ 400 kV to Peloponnese (OHL 1 2019 67 Megalopoli – Patras – Acheloos) 2020 2 Cycladic Island

  19. Slide 19: Major Projects 2018-2028

    Major Projects 2018-2028 (Expected commissioning year) Cyclades Cyclades Cyclades Cyclades Koumoundourou Dodecanese Phase A Phase B Phase C Phase D Patra Rouf 20 2018 2019 2020 2021-22 2023 2024 2025-28 Peloponnese Crete Crete Peloponnese N. Aegean Corridor A’ Phase I Phase II Corridor B’ 19

  20. Slide 20: Crete Interconnection

    Crete Interconnection Interconnection of Crete with the mainland through two distinct links The project is implemented in two phases (A, B) Phase A’ : Connection Peloponnese - Crete Attica Commissioning: 2020 Estimated budget: c. €330m Peloponnese Contractualisation: 11.2018 - Fulgor: western submar

  21. Slide 21: Cycladic Interconnection

    Cycladic Interconnection Phase A Phase B 150kV 150kV 66kV 66kV 150kV 200MVA 150kV 200MVA Lavrio Tinos 150kV 140MVA Lavrio Tinos 150kV 140MVA Mykonos Mykonos Syros Syros Paros Naxos Paros Interconnection of Naxos island with Paros and Mykonos islands (close Radial Interconnection of Syros island with

  22. Slide 22: Cycladic Interconnection

    Cycladic Interconnection Phase C Phase D 150kV 66kV Lavrio Tinos 150kV 200MVA 150kV 140MVA Mykonos Syros Paros Naxos Expansion to the West and Southern Cycladic Islands Construction of second submarine cable between Lavrio and Syros Interconnection of Lavrio - Serifos – Milos – Folegandros - Thira –

  23. Slide 23: New projects coming

    New projects coming Dodecanese • Expected commissioning:2027 Interconnection • Project Cost:1550m€ • Expected commissioning:2030 • Project Cost:apr.1000m€ 25

  24. Slide 24: Ariadne Interconnection

    3. Ariadne at a glance Interconnection 24

  25. Slide 25: Ariadne Interconnection management quotes

    “… by undertaking the most important infrastructure project currently under construction in Greece and one of the most important interconnections across Europe, IPTO becomes an even stronger company and consolidates its leading position in the power transmission energy industry” Manos Manousakis, CE

  26. Slide 26: Crete – Attica Interconnection

    Crete – Attica Interconnection The company Ariadne Interconnection SPSA, a currently 100% subsidiary of IPTO, has been established as a SPV (Special Purpose Vehicle – SPV) in order to finance and construct the project of Crete – Attica Interconnection The Attica-Crete interconnection is a 2X500MW ca

  27. Slide 27: Crete – Attica Interconnection

    Crete – Attica Interconnection The project is considered Project of Major Importance (PMI), so a Premium rate of return can be approved by the regulator (RAE), on top of the normal rate of return. The percentage of the premium return can be from 1% to 2.5% and is provided from the electrification of

  28. Slide 28: Crete – Attica Interconnection

    Crete – Attica Interconnection Commissioning: 2022 Attica Estimated budget: c. €1b Implementation: Ariadne Interconnection Peloponnese II DC 2x500MW Technical Characteristics I AC 2x200MVA 340km 132km submarine • VSC MMC Converters submarine • Voltage: ̴500kV • Bipolar Configuration • Link Capacity:

  29. Slide 29: GRID Telecom

    4. GRID at a glance Telecom 29

  30. Slide 30: Services

    Services In the near future Grid Telecom will be Having direct access to the extended proving collocation services to mobile (2.500 km) fiber optic network throughout telecom operators on IPTO’s Powers Pylons Greece owned by IPTO, Grid Telecom which are set up all over Greece. provides super high sp

  31. Slide 31: Our Vision

    Our Vision  Submarine cables transfer 99% of internet traffic.  Many local operators (East Europe) seek routes to major gateways (Athens and Chania)  Balkans are currently under- served and by-passed by the main fiber corridors connecting Asia, Africa and Western Europe  IPTO could provide acces

  32. Slide 32: Peer Group analysis

    Peer Group analysis Company Country Market Cap Equity RAB1 Trading status £30.8bn £19.3bn 60% premium €11.9bn €6.6bn 81% premium €1.8bn €1.6bn 11% premium €9.6bn €4.4bn 118% premium €0.96bn2 €1.4bn -32% discount 1Equity RAB= Reported RAB – proportionate Net Debt 2based on price as of 11-11-2019 and

  33. Slide 33: Q & A

    Q & A at a glance

  34. Slide 34: Appendix

    Appendix IPTO key financial items/ Regulatory Framework 34

  35. Slide 35: Net profit drivers

    € Th. Net profit drivers • The expected reduction in tax rates was not included in tax calculations. • Total OPEX decreased by 4.8m, as result of a decrease in Payroll and an increase in other OPEX categories. Payroll was positively affected by VES in 2018 and a reduction in the expense regarding th

  36. Slide 36: Regulatory overview

    €m Regulatory overview Year 2018 2019 2020 2021 Average RAB 1,449.8 1,684.5 1,941.3 2,059.8 x WACC (real, pre-tax) 7.0% 6.9% 6.5% 6.3% = Allowed remuneration 101.5 116.2 126.2 129.8 + Authorized OPEX 77.3 77.9 78.5 79.1 + Regulatory Depreciation 55.2 58.3 76.4 77.1 = Allowed revenue 234.0 252.4 281.

  37. Slide 37: Regulatory period 2018 – 2021

    €m Regulatory period 2018 – 2021 Regulated Asset & Rate of Return Allowed Revenue build out 2.500,0 8,0% 7,0% 6,9% 6,5% 6,3% 7,0% 1,5 2.000,0 6,0% 126 130 1.500,0 5,0% 116 101 4,0% 2.060 281 286 1.000,0 1.941 3,0% 254 1.684 234 76 77 55 58 1.450 2,0% 500,0 1,0% 77 78 78 79 0,0 0,0% 2018 2019 2020 20

  38. Slide 38: WACC calculation

    WACC calculation WACC components 2018 2019 2020 2021 Risk-free 0.7% 0.7% 0.7% 0.7% Market risk 5.0% 5.0% 5.0% 5.0% Equity beta 0.68 0.73 0.67 0.72 Country risk 2.3% 2.0% 1.8% 1.5% Cost of equity post-tax 6.4% 6.4% 5.9% 5.8% Tax rate 29.0% 29.0% 29.0% 29.0% Cost of equity pre-tax 9.0% 9.0% 8.3% 8.2%

  39. Slide 39: Required Revenue calculation

    Required Revenue calculation Regulatory Period Four years Regulatory Asset Base Undepreciated invested capital + maintenance/ (RAB) development CapEx/ WiP + working capital - disposals - subsidies Allowed Revenue (AR) Operator's Allowed Revenue In real terms for each year AR = O + Dep + R O annual o