Noront Resources Ltd

Noront Resources — Investor Presentation (July 2018)

30 slides from Noront Resources's investor presentation, July 2018

  1. Slide 1: Corporate Presentation Q1 2018

    CORPORATE PRESENTATION Q1 2018 NORONT RESOURCES 1

  2. Slide 2: Cautionary Note Regarding Forward-Looking Information

    CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation. Examples of such forward-looking information includes information regarding the timing, extent and success of explo

  3. Slide 3: North America's Next Mining District

    NORTH AMERICA’S NEXT MINING DISTRICT COMMENTARY RING OF FIRE LOCATION • 2007 Discovered Eagle’s Nest Ni-Cu-PGE deposit • 2008 Blackbird Chromite discovery • 2012 Positive Feasibility Study on Eagle’s Nest • 2014 Ontario government committed C$1bn to Ring of Fire infrastructure development • 2015 Ame

  4. Slide 4: Consolidation of the Ring of Fire Camp

    CONSOLIDATION OF THE RING OF FIRE CAMP District Scale Play RING OF FIRE SUDBURY BASIN Sudbury Basin 5000 0 5000 10000 Podolsky (meters) Coleman Morrison Strathcona Mill McCreedy West Nickel Rim South Clarabelle Mill Smelter Copper Cliff Victoria Creighton Legend Current and Former Mines Totten Mills

  5. Slide 5: Noront Management & Board

    NORONT MANAGEMENT & BOARD MANAGEMENT Alan Coutts 30 years of domestic and international experience in mine development and operations with Falconbridge, President & CEO Noranda and most recently Managing Director, Australasia with Xstrata Nickel Stephen Flewelling 35 years of experience in all aspec

  6. Slide 6: Corporate Information

    CORPORATE INFORMATION Overview Listing TSX-V Symbol NOT May 29, 2018 $0.38 52 Week High $0.52 52 Week Low $0.27 Market Capitalization ~ $137.0 M Shares O/S ~ 360.5 M Shares F/D ~ 484.3 M Long Term Debt 1,2 US$ 40 M Major Shareholders Resource Capital Funds 19.89% Baosteel 6.33% 1. RCF Loan (secured

  7. Slide 7: Deep Project Pipeline

    DEEP PROJECT PIPELINE A World-Class Nickel Deposit and Chromite Resource DEVELOPMENT STRATEGY Thunder Bird • First mine will be Eagle’s Nest – Ni-Cu-PGM Kyle Butler deposit JJJ McFaulds Blackbird • Followed by the development of the nearby AT-12 Eagle's Nest Blackbird Chromite deposit 1 Black Thor B

  8. Slide 8: Regional Infrastructure

    REGIONAL INFRASTRUCTURE Key to Development of the Ring of Fire • 2014: The Province of Ontario committed $1 billion for Ring of Fire infrastructure development • 2015-16: The province, communities and industry collaborate on various studies and analysis • 2017: Announcement by Ontario of funding for

  9. Slide 9: Ring of Fire's First Development

    RING OF FIRE’S FIRST DEVELOPMENT Eagle’s Nest Nickel-Copper-PGE Deposit EAGLE’S NEST MINE COMMENTARY N Esker Camp Portal Area S • 2012 Positive Feasibility Study on Eagle’s Nest 2.5km to Airstrip Surface − After tax NPV (8%) of $C543mm with 28% IRR1 − Resource development has potential to extend min

  10. Slide 10: Eagle's Nest Reserves & Resources

    EAGLE’S NEST RESERVES & RESOURCES High Grade Nickel-Copper-PGM Mineral Reserve & Resource 1 Eagle’s Nest Metal in Concentrate Category T (000) Ni (%) Cu (%) Pt (gpt) Pd (gpt) 34.2M lbs of Ni per annum 19.2M lbs of Cu per annum Proven & Probable 11,131 1.68 0.87 0.89 3.09 23,470 oz of Pt per annum In

  11. Slide 11: Attractive Cost Profile

    ATTRACTIVE COST PROFILE Potential to be a Low First Quartile Nickel Producer 2021 Nickel Business C1 Cost Eagle’s Nest Positioned to be one of the lowest operating cost nickel mines in the world at US$3,395/tonne (US$1.54/lb) net of byproduct credits assuming a 70% payability (2012 feasibility study

  12. Slide 12: Nickel Outlook

    NICKEL OUTLOOK Nickel in Electric Vehicle (EV) Batteries Changes the Market Place • Nickel demand to increase hugely from Electric Vehicle batteries • Ni-Mn-Co (NMC) cathodes are emerging as the dominant choice due to high energy density requirements • Ni accounts for as much as 55 – 70% of metallic

  13. Slide 13: Nickel Outlook

    NICKEL OUTLOOK Declining Sulphide Nickel Supply • Strong demand for sulphide nickel in non-stainless steel applications with strong demand driven by electric vehicle battery sector • Very limited new supply coming on line with a shortfall of new mining projects in the pipeline and smelter rationaliz

  14. Slide 14: Nickel Outlook

    NICKEL OUTLOOK Price Recovery – More Positive Fundamentals • Nickel supply deficit will continue; stocks after 3 years of deficits returning to a level which will support higher prices • Growing strong demand driven by Chinese stainless and electric vehicles/batteries • Limited new supply with deart

  15. Slide 15: Eagle's Nest Project

    EAGLE’S NEST PROJECT Project Timeline 2017 2018 2019 2020 2021 2022 Community Dialogue PDA and IBA Negotiations Update Eagle’s Nest Feas. Detailed Engineering Mine Site EA Permitting Finance (3 Phases) Construction Commissioning Production 15

  16. Slide 16: Ring of Fire Chromite Deposits

    RING OF FIRE CHROMITE DEPOSITS A World-Class Chrome Resource Tonnes Tonnes Blackbird1 Cr2O3 (%) Black Thor2 Cr2O3 (%) (millions) (millions) Measured 9.3 37.44 Measured 107.6 32.2 Indicated 11.2 34.36 Indicated 30.2 28.9 Measured and Indicated 20.5 35.76 Measured and Indicated 137.7 31.5 Inferred 23.

  17. Slide 17: Noront Chromite Strategy

    NORONT CHROMITE STRATEGY • Use the development of Eagle’s Nest infrastructure (camp, mine, airstrip and road construction) to support initial chromite mine • Produce a Ferrochrome product for sale into the US market • Stage 1: Moderate-sized Mine/Smelter development concurrent with Eagle’s Nest – Ut

  18. Slide 18: Stage 1 Chromite Development

    STAGE 1 CHROMITE DEVELOPMENT Blackbird Mine COMMENTARY • Blackbird contains 20.5 million tonnes of measured and indicated resource • Close proximity to Eagle’s Nest (less than 1km) • Although deposit comes to surface, mine as underground in order to avoid large open pit with inherent waste rock pile

  19. Slide 19: Stage 1 Chromite Development

    STAGE 1 CHROMITE DEVELOPMENT Ferrochrome Smelter • Locate Ferrochrome smelter on Ontario Brownfield site − Potential sites in Sault Ste. Marie, Thunder Bay, Timmins and Sudbury − Key factors include power and rail infrastructure, access to US market, skilled workforce, and appropriate site • Traditi

  20. Slide 20: Ferrochrome Processing Plant

    FERROCHROME PROCESSING PLANT Proposed Plant Lay-out 20

  21. Slide 21: Ferrochrome & Stainless Steel Growth

    FERROCHROME & STAINLESS STEEL GROWTH CHROMITE CONCEPT ANNUAL GROWTH OF SS • Chromite ore (FeCr2O4) is mined and concentrated then smelted into Ferrochrome (FeCr) • Ferrochrome is used in the manufacture of Stainless Steel (SS) • All Stainless Steel requires 12-18% Chrome (Cr) • Historic Stainless St

  22. Slide 22: North American Stainless Steel Production

    NORTH AMERICAN STAINLESS STEEL (SS) PRODUCTION NA SS Market & Production • NA SS market is small, representing roughly 7% of world production • There is no Ferrochrome production in NA so US SS plants depend on imports of Ferrochrome to feed their furnaces • The bulk of Ferrochrome imports SS NA Pla

  23. Slide 23: Ring of Fire Exploration Upside

    RING OF FIRE EXPLORATION UPSIDE: Significant potential for additional discoveries • Ring of Fire geology is poorly exposed (no outcrop) with challenging access, so additional discoveries are likely with further exploration • Traditional Archean greenstone volcanic belt terrain with multiple commodit

  24. Slide 24: Exploration

    EXPLORATION Cu-Zn Exploration Success • New discoveries have been made at McFaulds #8, #9 and #10 • The goal is to discover ~10 MT of sulphide mineralization to feed a centralized concentrator • There are 2 deposits (MCF1 & 3), and 7 occurrences (MCF2, 4, 5, 6, 8, 9, 10) over a 6km strike length • D

  25. Slide 25: Ring of Fire Social License

    RING OF FIRE SOCIAL LICENSE Enhanced Community Engagement • Committed to local hiring and training as part of our exploration programs • Over the past year, 65% of Noront’s exploration employees have come from First Nation communities • Visits to the site by senior community leaders and elders foste

  26. Slide 26: Why Noront?

    WHY NORONT? • Exceptional land package and project pipeline in Ontario • Multiple commodities in an emerging metals camp • Controlling interest in all major Ring of Fire discoveries to date • First class management team and Board of Directors with proven success in discovery, finance, construction a

  27. Slide 27: Appendix

    APPENDIX 27

  28. Slide 28: Ring of Fire Consolidation

    RING OF FIRE CONSOLIDATION Acquisition of Cliffs Chromite & MacDonald Mines Properties • In March 2015, Noront acquired the Ring of Fire assets held by Cliffs Natural Resources Inc. (NYSE: CLF) for USD$27.5 M, funded by Franco-Nevada Corp. (NYSE/TSX: FNV) • Cliffs originally purchased these assets f

  29. Slide 29: Eagle's Nest Deposit

    EAGLE’S NEST DEPOSIT Feasibility Study – September 2012 Production • Mining Life – 11 years (Potential for 9 additional years) • Mining Rate – 1,095,000 t/a; 3,000 t/d • Average Production – 150,000 dry t/a of concentrating containing: – 15,500 t of nickel – 8,700 t of copper – 23,400 oz of platinum

  30. Slide 30: Eagle's Nest 2012 Feasibility Study

    EAGLE’S NEST 2012 FEASIBILITY STUDY Capital and Operating Cost Estimates Pre-Production Capital: LOM Average Operating Costs: • $609 M, comprising • $97/t Ore milled, comprising. − $195 M Mining − $34/t Mining − $113 M Processing − $33/t Processing − $100 M Infrastructure − $21/t General & Administr

Noront Resources — Investor Presentation (July 2018) on 6ix