Sandfire Resources Ltd · ASX:SFR

Sandfire Resources — Non-Deal Roadshow (September 2011)

31 slides from Sandfire Resources's roadshow presentation, Sep 1, 2011

  1. Slide 1: DeGrussa and beyond: Global Investor Roadshow – September 2011

    For personal use only DeGrussa and beyond Global Investor Roadshow – September 2011 1

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer Competent Person’s Statement For personal use only • The information in this public presentation that relates to Exploration Results and Mineral Resources is based on information compiled by Mr John Evans who is a Fellow of the Australasian Institute of Mining an

  3. Slide 3: Our Mission

    For personal use only Our Mission • To develop and operate the 100%-owned premier high-grade DeGrussa VMS copper-gold mine • To deliver superior returns to our owners • To discover additional VMS deposits within the emerging Doolgunna mineral field • To make new discoveries within our existing portf

  4. Slide 4: Company Snapshot – cash flow imminent

    For personal use only Company Snapshot – cash flow imminent • DeGrussa Project moving into production: • Discovery to development in two years (2009- 2011) • DFS* project operating cash flow of A$2.4 billion (pre-tax) on A$4.2 billion revenue • DFS does not include oxide copper (44,000 tonnes Cu con

  5. Slide 5: Company Snapshot – the next phase of growth

    Company Snapshot – the next phase of growth • Exploration ramping up targeting additional VMS For personal use only clusters within 400km2 Doolgunna Project: • Extensive bank of information now accumulated within prospective DeGrussa mine corridor • Prospective corridor extended to 22km, providing o

  6. Slide 6: Recent Achievements

    For personal use only Recent Achievements • DeGrussa Definitive Feasibility Study completed and approved • Development activities well advanced with ~300 personnel on site • Mining and process plant construction underway • First copper production on track for Q1 2012 (DSO) • Key project development

  7. Slide 7: Corporate Summary

    Corporate Summary Issued Capital: 149.9M ordinary shares Board For personal use only 10.4M options DEREK LA FERLA – Non-executive Chairman Cash (31 July 2011): A$46.9M KARL SIMICH – Managing Director/CEO Major Shareholders W. JOHN EVANS – Executive Technical Director Oz Minerals 18.8% Posco 15.9% JO

  8. Slide 8: Asset Overview

    Asset Overview Western Australia Northern Territory – For personal use only Borroloola Project COPPER-GOLD LEAD-ZINC • Warramana • DeGrussa – production and exploration COPPER • Greater Doolgunna – exploration • Tawallah 1/2 GOLD IRON ORE • Greater Doolgunna – exploration • Roper Bar LEAD-ZINC URANI

  9. Slide 9: From Concept to Cash

    For personal use only From Concept to Cash Discovery to DFS in Discovered April 2009 2 years Maiden Mineral Resource February 2010 Pre-Feasibility Study, Ore Reserve March 2011 Mine development commenced April 2011 Definitive Feasibility Study June 2011 Today Plant construction underway Project fund

  10. Slide 10: From Concept to Cash: DFS Outcomes

    For personal use only From Concept to Cash DFS Outcomes First Production Q1 2012 (DSO), Q3 2012 (Conc.) 10.72Mt @ 5.1% Cu, 1.7g/t Au Life-of-mine extraction from Ore (541,000t contained copper, Reserves and Mineral Resources 599,000oz contained gold) discovered to date 93% Mineral Resource to Ore Re

  11. Slide 11: Years, +200,000m of Drilling, Four Deposits

    For personal use only 2 Years, +200,000m of Drilling, Four Deposits 11

  12. Slide 12: DeGrussa Project – Open Pit Operations

    For personal use only DeGrussa Project – Open Pit Operations • Early extraction of DSO Ore Reserves: • 0.14Mt @ 25.6% Cu, 2.5g/t Au • 37,000t copper, 12,000oz gold (Contained) • Early sulphide copper ore for plant commissioning • Oxide copper resources to be stockpiled for proposed processing 12

  13. Slide 13: DeGrussa – Key Parameters

    DeGrussa – Key Parameters • Life-of-mine extraction of 10.72Mt @ 5% Cu, 1.7g/t Au (541,000t For personal use only copper, 599,000oz gold – contained) • Conventional open pit mining operation (~2 years) and long-term underground mine (initial 7+ year mine life) • Conventional 1.5Mtpa on-site concentr

  14. Slide 14: DeGrussa – Financial Evaluation and Price Assumptions

    DeGrussa – Financial Evaluation and Price Assumptions Life-of-mine (LOM) For personal use only $ Billion Project revenue 4.2 Royalties (5% weighted average) (0.2) Operating costs and sustaining capital (1.6) Project operating cash flow (pre-tax) 2.4 Pre-production capital expenditure (0.4) Project c

  15. Slide 15: DeGrussa – Capital and Operating Costs

    For personal use only DeGrussa – Capital and Operating Costs Capital Cost Breakdown A$M Construction (plant, equipment and infrastructure) 267 Open pit mining to access DSO 44 Underground mine development 56 Other pre-production 17 Total pre-production capital 384 Life-of-Mine Operating Cost Estimat

  16. Slide 16: DeGrussa – Annual Grade and C1 Cost Profile

    For personal use only DeGrussa – Annual Grade and C1 Cost Profile 16

  17. Slide 17: DeGrussa – Annual Grade and C1 Cost Profile

    For personal use only DeGrussa – Annual Grade and C1 Cost Profile • Definitive Feasibility Study optimises project cash flows • Higher grades + lower C1 costs in first three years = increased cash flow 17

  18. Slide 18: DeGrussa Project – Development Underway

    DeGrussa Project – Development Underway • Box-cut excavation completed – For personal use only development of Evans Decline has commenced ~350m advanced • Pre-strip of open pit commenced April 2011 – two years from discovery • Bulk earthworks for process plant completed • ~300 people on site • All m

  19. Slide 19: DeGrussa Project – Development

    For personal use only DeGrussa Project – Development Pre-Feasibility Definitive Feasibility Study Project Financing Infrastructure Construction Major Equipment Concentrator Construction Open Pit Direct Shipping Ore Underground Massive Sulphide Concentrator Ramp-up Shipment 19

  20. Slide 20: VMS Geological Model

    VMS Geological Model • Volcanogenic massive sulfide (VMS) ore deposits are a type of metal sulfide For personal use only ore deposit (mainly copper, zinc and lead) created by volcanic-associated hydrothermal events in submarine environments • Predominantly layered accumulations of sulfide minerals t

  21. Slide 21: Global VMS Camps

    For personal use only Global VMS Camps • Most significant VMS deposits occur in clusters that define major mining camps – major source of global copper, zinc, lead production, eg: • Bathurst (New Brunswick) – 229.8Mt @ 0.46% Cu, 7.66% Zn, 3.01% Pb, 91g/t Ag, 0.46g/t Au (camp discovered 1952) • Kidd

  22. Slide 22: Is DeGrussa a VMS deposit?

    Is DeGrussa a VMS deposit? • Four lenses of mineralisation typical of VMS For personal use only deposit cluster • Classic host sequence of intra-volcanic sediments • Typical seafloor alteration with regionally extensive litho-geochemical signature • Classic VMS sulphide textures, including remnant c

  23. Slide 23: Potential of Global VMS Camps

    Potential of Global VMS Camps Volcanic District No. of Deposits Million Tonnes Ore Million Tonnes Metal Area of District (km²) For personal use only Hokuroku, Japan 18 90 6.2 720 Bathurst No1, Canada 12 180 15.1 880 Bathurst No2, Canada 15 98 5.8 1150 Flin Flon, Canada 10 65 4.3 560 Snow Lake, Canad

  24. Slide 24: DeGrussa – Unlocking the “Corridor of Riches”

    For personal use only DeGrussa – Unlocking the “Corridor of Riches” • 22km long, 1.2km wide prospective corridor which can be explored to +2km vertical depth • Of this, only 1.2km strike length has been intensively explored to 600m vertical depth • Minimal drilling has been conducted below 50m depth

  25. Slide 25: Major Exploration Push

    For personal use only Major Exploration Push • Developing regional geology model from: • Deep drilling • Sterilisation & pre-development drilling • Mapping & geophysical interpretation • Priority VMS corridor extends for 22km • Lithogeochemistry program underway to aid target vectoring • Intensive e

  26. Slide 26: DeGrussa Mineral Field – Regional Exploration

    For personal use only DeGrussa Mineral Field – Regional Exploration 26

  27. Slide 27: Summary

    Summary • Development of DeGrussa Project underway For personal use only • On track to produce first copper next year: • First DSO ore from open pit due Q1 2012 • First underground ore expected Q2 2012 • High-margin production profile – positioned to take advantage of strong copper, gold and other c

  28. Slide 28: DeGrussa and beyond: Global Investor Roadshow – September 2011

    For personal use only DeGrussa and beyond Global Investor Roadshow – September 2011 28

  29. Slide 29: Appendix – DeGrussa: Mineral Resources

    Appendix – DeGrussa: Mineral Resources Table 1: DeGrussa Copper-Gold Project – March 2011 JORC Resource Statement For personal use only Resource Contained Contained Competent Zone Location Tonnes (Mt) Copper (%) Gold (g/t) Category Copper (t) Gold (oz) Person Gold Measured Open Pit 0.14 - 1.5 - 7,00

  30. Slide 30: Appendix – DeGrussa: Ore Reserves

    Appendix – DeGrussa: Ore Reserves Table 2: DeGrussa Copper-Gold Project – March 2011 Ore Reserve Statement Reserve Mining Contained Copper Contained Gold For personal use only Deposit Tonnes (Mt) Copper (%) Gold (g/t) Category Method (t) (oz) Open Pit - DeGrussa Probable 0.14 25.6 2.5 37,000 12,000

  31. Slide 31: Appendix: Competent Person’s Statements

    Appendix: Competent Person’s Statements Competent Person’s Statement – Mineral Resources For personal use only • The information in this report that relates to Mineral Resources (except the Indicated Resource of Supergene Chalcocite) is based on information compiled by Diederik Speijers who is a Fel

Sandfire Resources — Non-Deal Roadshow (September 2011) on 6ix