  1. Slide 1: Awakening the Giant

    Awakening the Giant Building a mining camp around the Sleeping Giant Mine & Mill December 2025

  2. Slide 2: Forward-Looking Statements

    FORWARD- LOOKING STATEMENTS Except for statements of historical facts, some statements contained in this presentation, constitute forward looking statements, including, without limitation, anticipated developments in the Company’s operations in future periods and other events or conditions that may

  3. Slide 3: Why Invest in Abcourt?

    Why Invest in Abcourt?  Emergent Gold Producer through its 100%-owned Sleeping Giant Mine and Mill, which includes an updated resource, a positive Preliminary Economic Assessment (PEA), an operational and fully permitted 950 tpd mill with all surface, underground infrastructure in place, and advanc

  4. Slide 4: Experienced Board Focused on Shareholder Value

    Experienced Board Focused on Shareholder Value Pascal Hamelin│ CEO & Director François Mestrallet │ Director Loïc Bureau │ Chairman of the Board  Mining engineer with 34 years of experience in  A veterinarian and member of the “École  Geological engineer since 2006 nationale vétérinaire” of Lyon,

  5. Slide 5: Experienced Team of Mine Builders & Operators

    Experienced Team of Mine Builders & Operators Pascal Hamelin, ing. │ President & CEO Alain Lévesque, CPA │ CFO  Mining engineer with 34 years of experience in project  Accountant with 30 years experience in public listed management, and operating mines. companies.  Has many years of experience in

  6. Slide 6: Capital Structure

    Capital Structure Capital Structure Officers & Retail Investors Directors As of 2025-11-01 38% 27% Shares Outstanding: 1,123,575,015 Warrants: 681,586,355 (avg 0,075) Options: 52,340,800 (avg 0,075) Institutional Fully Diluted: 1,857,502,170 Investors HNW Investors 5% & Regional Contractors 52w high

  7. Slide 7: Projects Portfolio

    Projects Portfolio Gold asset Zn-Pb-Ag asset 1 Sleeping Giant (100%) 1 Cu asset 2 Laflamme (22%) 3 Discovery (100%) Sleeping Giant Mine & 4 950 tpd Mill Flordin-Cartwright (100%) 5 Cameron Shear (51%) 6 Jonpol (100%) 7 Elder Mine & Tagami (100%) 8 Aldermac - Cu (100%) 9 Abcourt-Barvue - Zn (100%) 10

  8. Slide 8: Sleeping Giant: Positive 2023 PEA leading to construction

    Sleeping Giant: Positive 2023 PEA leading to construction Base Case Scenario : Gold Price : 1800 $ US/oz, Exchange Rate : 1.00 USD = 1.30 CAD, Discount Rate : 5 %  NPV5% after taxes and mining duties (M CAD) 54.4  IRR after taxes and mining duties (%) 33.3  Initial Capital Costs (preproduction) (

  9. Slide 9: Mine XYZ: Economic potential at 3,200 USD/Oz Au

    Mine XYZ: Economic potential at 3,200 USD/Oz Au What is the potential of a similar project at 3,200 USD gold price? Next Steps for Sleeping Giant Project  All In Sustaining Cost (USD/oz) 1,400  Ramp up development and  Average Annual Production (oz) 30,000 oz/Year production toward 2,500 oz per 

  10. Slide 10: Rapidly progressing Production Rate

    Rapidly progressing Production Rate abcourt.ca 10 TSX-V: ABI

  11. Slide 11: Some facts supporting the Ramp up in production

    Some facts supporting the Ramp up in production High-grade historical gold All infrastructure in place & Fully permitted operation mine operational  Over 1987 to 2014, 3.36M tonnes  CIP mill with an optimal rate of 800  Mining leases and environmental mined at 10.29 g/t Au to produce tpd processe

  12. Slide 12: Sleeping Giant: More Resources Upsize Potential

    Sleeping Giant: More Resources Upsize Potential Surface 0.6 m @ 58.1 g/t 0.5 m @ 71.2 g/t Mined Out 0.5 m @ 130.4 g/t Deswick Stope Optimizer 0.5 m @ 170 g/t Blue Sky 0.5 m @ 112.5 g/t Not or Very Little Drilled Signifiants High Grade 0.5 m @ 65 g/t Intercepts Above 25 g/t Au Not Included in Resourc

  13. Slide 13: Sleeping Giant: Demonstrating Resource Upside

    Sleeping Giant: Demonstrating Resource Upside December 2022 NI 43-101 Compliant Mineral Resource Estimate (MRE)  Modeled 846 distinct gold structures Category Tonnes g/t Au Gold (oz) from 1.19 million metres of drilling ‒ Many structure yet to be fully explored M&I resources 755,000 7.14 173,300 

  14. Slide 14: Sleeping Giant Mine: Notes to the 2022 MRE

    Sleeping Giant Mine: Notes to the 2022 MRE Notes to the Sleeping Giant 2022 MRE i. The independent and qualified persons for the 2022 MRE, as defined by NI 43-101 are Olivier Vadnais-Leblanc, P. Geo. and Eric Lecomte, ing, all from InnovExplo Inc. ii. These mineral resources are not mineral reserves

  15. Slide 15: Sleeping Giant: Excellent Regional Potential

    Sleeping Giant: Excellent Regional Potential Mining Lease Property Boundary Drill Holes Au Intercepts over 10 gpt Historical Data (1988) Hole 411-7 48.4 gpt Au over 0.7m abcourt.ca 15 TSX-V: ABI

  16. Slide 16: New focus in the Abitibi Camp near the Cartwright Deposit

    New focus in the Abitibi Camp near the Cartwright Deposit • The Flordin deposit was explored by Cambior in the 1980’s • The Cartwright area was discovered by prospectors in the 1930’s • Both deposits are along the Cameron shear. • The sector is accessible by road. • Located 35 km north of Lebel-sur-

  17. Slide 17: Flordin-Cartwright: New Gold Discovery in July 2024

    Flordin-Cartwright: New Gold Discovery in July 2024 Best Channel Intersection: 22,7 g/t over 7,0 m abcourt.ca 17 TSX-V: ABI

  18. Slide 18: Flordin-Cartwright: Expanding the discovery from October 2024 to September 2025

    Flordin-Cartwright: Expanding the discovery from October 2024 to September 2025 Best Channel Intersection in Phase 2: 10,4 g/t over 12,0 m abcourt.ca 18 TSX-V: ABI

  19. Slide 19: Flordin-Cartwright: Exposing a significant gold zone

    Flordin-Cartwright: Exposing a significant gold zone over 300 metres long • 20 channels taken every 10-15m, • Average width of 15 to 20m, • Average grade of 5.0 gpt, • Open at depth and longitudinally abcourt.ca 19 TSX-V: ABI

  20. Slide 20: Flordin-Cartwright: Drill results from 2023 to 2025 along a 2km corridor

    Flordin-Cartwright: Already drill results from 2023 to 2025 along a 2km corridor A potential two kilometres Corridor • Abcourt exposed the gold mineralization over 200m long in the stripped area at Cartwright in 2024, and increased the stripped area to 650m in 2025. • Abcourt identified the same typ

  21. Slide 21: Flordin Deposit: Resources near the Sleeping Giant Mill

    Flordin Deposit: Resources near the Sleeping Giant Mill  Sub-vertical deposit beginning with open pit on surface with May 2023 NI 43-101 Compliant Mineral Resource Estimate (MRE) underground extension evaluated with long hole mining parameters. Potential room & pillars Potential open pit mining Pot

  22. Slide 22: Flordin Deposit: Notes to the 2023 MRE

    Flordin Deposit: Notes to the 2023 MRE Flordin Deposit: Notes to the 2023 MRE 1. The effective date of the 2023 MRE is May 15, 2023. 2. The independent and qualified persons (as defined by NI 43-101) for the 2023 MRE are Olivier Vadnais-Leblanc, P.Geo., Carl Pelletier, P.Geo., Eric Lecomte, P.Eng.,

  23. Slide 23: Near Term Objectives

    Near Term Objectives Growing & Advancing Sleeping Giant  Grow production at Sleeping Giant to 2,500 oz Au per month  3,000 m per month drill program at Sleeping Giant to extend LOM (Began in December 2023)  To declare commercial production Q2 2026 Advance Cartwright-Flordin  Extend the surface s

  24. Slide 24: Why Abcourt?

    Why Abcourt? 1 Near term gold producer Resource growth potential within the Contact Us 2 camp  475, avenue de l’église, Rouyn-Noranda, Quebec  info@abcourt.com Investor Relations: 3 Custom Mill material from other sites  Dany.Cenac-Robert@ReseauProMarket.com 4 Many upcoming catalysts abcourt.ca 2

  25. Slide 25: Appendices

    Appendices abcourt.ca 25 TSX-V: ABI

  26. Slide 26: Sleeping Giant Mill: Process Flowsheet

    Sleeping Giant Mill: Process Flowsheet InnovExplo - Expertise minière abcourt.ca 26 TSX-V: ABI

  27. Slide 27: Discovery Deposit: Building Resources near the Sleeping Giant Mill

    Discovery Deposit: Building Resources near the Sleeping Giant Mill  Sub-vertical deposit beginning on surface with underground April 2023 NI 43-101 Compliant Mineral Resource Estimate (MRE) extension  The Discovery deposit is 80 km East of the Sleeping Giant Mill. Discovery Deposit  This MRE refl

  28. Slide 28: Discovery Deposit: Notes to the 2023 MRE

    Discovery Deposit: Notes to the 2023 MRE Discovery Deposit: Notes to the 2023 MRE 1. The effective date of the 2023 MRE is Mars 28, 2023. 2. The independent and qualified persons (as defined by NI 43-101) for the 2023 MRE are Olivier Vadnais-Leblanc, P.Geo., Simon Boudreau, P.Eng.,and Eric Lecomte,

  29. Slide 29: Abcourt-Barvue Zn-Ag Project

    Abcourt-Barvue Zn-Ag Project Abcourt-Barvue Project: Historical Resource Estimate Category Type Tonnes % Zn g/t Ag ZnEq 100% owned M&I resources Combined 8,083,000 3.06 55.45 N/A Inferred resources Combined 2,037,000 2.89 114.16 N/A Historical Resources were estimated in a NI 43-101 technical report

  30. Slide 30: Sleeping Giant: Block Model, Plan view

    Sleeping Giant: Block Model, Plan view InnovExplo - Expertise minière abcourt.ca 30 TSX-V: ABI

  31. Slide 31: Courville Property

    Courville Property Pershing-Manitou NI 43-101 Resource Estimate Pershing Manitou Project Type Category Tonnes g/t Au Gold (oz) Open pit M&I resources 9,600 6.93 2,140  124 km southeast of Sleeping Giant Mill and 65 km northeast of Inferred resources 500 0.62 10 Val-d’Or Underground M&I resources 23