Telenor ASA · OSL:TEL
Telenor ASA — Concertation meeting Brussels 2003
8 slides from Telenor ASA's conference presentation, Sep 16, 2003
Slide 1: Broadband services for everyone over fixed wireless access networks (BROADWAN)
Broadband services for everyone over fixed wireless access networks (BROADWAN) Integrated Project under negotiation. Presentation by Terje Tjelta, Telenor R&D, on behalf of a consortium comprising 25 partners from service operators, vendor industry, academia and consultancy. 1 Concertation meeting B
Slide 2: BROADWAN: Two good cards
BROADWAN Two good cards True broadband Highly service for competitive everyone wireless solutions • Triple play • Hybrid networking • Uplink capacity for • Low cost demanding users • Fixed and nomadic • Full coverage: rural, and urban 2 Concertation meeting Brussels 16 September 2003
Slide 3: Main objectives
Main objectives • Development of an economical realistic network architecture for the provision of true broadband services for all citizens in Europe • Bring European industry in the lead for next generation broadband wireless solutions • Motivate advanced utilisation of broadband services at all le
Slide 4: Project structure
Project structure Heterogeneous Broadband broadband network Requirements network architecture utilisation Next Lower frequency for generation better access for high capacity hot-spots and wireless remote areas 4 Concertation meeting Brussels 16 September 2003
Slide 5: Wireless access and hybrid networks
Wireless access and hybrid networks Individual rural users Collective wireless coverage zone Satellite Wired coverage limit BFWA DTT WLAN Urban center (wired) Fixed Nomadic users and nomadic 5 Concertation meeting Brussels 16 September 2003
Slide 6: Next generation broadband fixed wireless access
Next generation broadband fixed wireless access Frequency range 1 10 100 GHz A new 5 GHz base station A new 42 GHz system to achieve superior spectral flexible and dynamically efficiency. This will enable adaptive to users and cost reductions. Basically operators varying needs. It because of more cu
Slide 7: Rural area demonstration
Rural area demonstration 7 Concertation meeting Brussels 16 September 2003
Slide 8: BROADWAN information
BROADWAN information • Expected to start late this year • Project planned for five years; now two years funding • Web area http://www.telenor.no/broadwan • Contact terje.tjelta@telenor.com 8 Concertation meeting Brussels 16 September 2003