  1. Slide 1: Merger with Tellurian

    October 2016 Merger with Tellurian NASDAQ: MPET FILED BY MAGELLAN PETROLEUM CORPORATION PURSUANT TO RULE 425 UNDER THE SECURITIES ACT OF 1933 AND DEEMED FILED PURSUANT TO RULE 14a-12 UNDER THE SECURITIES EXCHANGE ACT OF 1934 SUBJECT COMPANY: TELLURIAN INVESTMENTS INC. (FILE NO. 333-213923)

  2. Slide 2: Forward-looking statements

    1 Forward-looking statements This presentation contains forward-looking statements within the meaning of U.S. federal securities laws. The words “anticipate,” “assume,” “believe,” “budget,” “estimate,” “expect,” “forecast,” “initial,” “intend,” “plan,” “potential,” “project,” “will,” and similar exp

  3. Slide 3: Combined company ownership

    2 Combined company ownership  Tellurian Investments Inc. (“Tellurian”) was founded in February 2016 to develop low cost LNG export projects on the US Gulf Coast – Tellurian was co-founded by Charif Souki and Martin Houston and is led by Meg Gentle (CEO)  Definitive Merger Agreement between Magella

  4. Slide 4: Merger conditions

    3 Merger conditions Board  Proposed merger results from extensive strategic alternatives review process – None of Magellan’s remaining assets currently generate revenues  Ability to participate in unique business plan – Driftwood LNG positioned to take advantage of growing LNG market  Attractive

  5. Slide 5: Proposed mtpa LNG export facility in Louisiana

    4 Proposed 26 mtpa LNG export facility in Louisiana Location Site Driftwood LNG project  26 mtpa liquefaction capacity = 5 LNG plants, each made up of 1 natural gas pre-treatment unit and 4 liquefaction units with nominal capacity of 1.3 mtpa each (i.e. 5.2 mtpa per plant)  ~800-acre site on the C

  6. Slide 6: Developing low cost LNG export projects on the US Gulf Coast

    5 Developing low cost LNG export projects on the US Gulf Coast  Engineering and construction improvements – Design based on existing technologies and off-the-shelf equipment (vs. expensive bespoke designs) – Higher density of production, using less pipe – Targeting construction costs of $450 to $55

  7. Slide 7: Strategically aligned with best-in-class partners to reset LNG cost benchmarks

    6 Strategically aligned with best-in-class partners to reset LNG cost benchmarks Integration with development partners Function Partner Description EPC  Bechtel is a world leader in the LNG industry and has built 41 facilities producing 120 mtpa to date: c. 45% of global capacity  Founders have de

  8. Slide 8: Proposed project schedule

    7 Proposed project schedule Key milestones  Approximately 2 years to conduct environmental studies, permitting and FERC application – FERC pre-filing process initiated in June 2016 and stakeholder engagement underway – FERC expected to issue ‘notice to proceed’ in 2018  Approximately 4 years from

  9. Slide 9: Pro-forma management team

    8 Charif Souki, Chairman  Founded Cheniere Energy, the first LNG export company in the United States, growing it to a $9 Bn company while serving as CEO from 2002 to 2015  A lifelong entrepreneur, Charif has spent 20 years raising and investing capital in a range of industries globally Pro-forma m