Fortis Inc. · TSX:FTS

Fortis — Investor Presentation (December 2024)

48 slides from Fortis's investor presentation, December 2024

  1. Slide 1: Investor Presentation

    INVESTOR PRESENTATION December 2024

  2. Slide 2: Forward Looking Information

    FORWARD LOOKING INFORMATION Fortis includes forward-looking information in this presentation within the meaning of applicable Canadian securities laws and forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 (collectively referred to as "forward-looki

  3. Slide 3: Fortis at a Glance

    FORTIS AT A GLANCE TSX/NYSE: FTS 93% transmission and distribution assets 10 regulated utilities in Canada, U.S., and Caribbean 3.5 million electricity and gas customers 9,600 dedicated employees 99% Regulated utility assets $5.2 billion 2024F Capital expenditures $38.8 billion 2024F rate base ~8% a

  4. Slide 4: Our Vision & Strategy

    OUR VISION & STRATEGY A Premium North American Utility Delivering a Cleaner Energy Future SUSTAINABLE GROWTH • Operational Excellence • Financial Strength • Diversified Regulated Portfolio • Local Business Model • Strong Governance 4

  5. Slide 5: Our Common Ground

    OUR COMMON GROUND Provision of Safe & Reliable Service Good Governance Priority #1 Fortis Ranked #1 out of 215 S&P/TSX companies in The Globe & Mail 2024 Board Games • Health and safety of our employees, customers and contractors • Utilities operate within the parameters of common policies and best

  6. Slide 6: Delivering Safe & Reliable Service

    DELIVERING SAFE & RELIABLE SERVICE All-Injury Average Electricity Customer Frequency Rate(1) Outage Duration (Hours) 1.78 1.52 4.3 4.2 3.8 3.8 3.3 2.3 1.8 1.9 2.0 2.0 2019 2020 2021 2022 2023 2019 2020 2021 2022 2023 Fortis USA Bureau of Labor Statistics Fortis(2) Electricity Canada and U.S. Energy

  7. Slide 7: Maintaining Customer Affordability

    MAINTAINING CUSTOMER AFFORDABILITY Key Areas of Focus Controllable Operating • Preventative maintenance and the Costs per Customer introduction of innovative practices to reduce costs • Prioritization of capital investment based on operational needs and associated rate impact • Utilization of availa

  8. Slide 8: Reducing Carbon Emissions

    REDUCING CARBON EMISSIONS Our planned trajectory to net-zero i 9, Achieved @£22 ————— Actual GHG Emissions Reduction GHG Emissions Reduction Since 2019 ————_ Forecast GHG Emissions Reduction 50% GHG Emissions Reduction Target Illustrative Emissions Reduction 2023 Coal-Free Generation Mix 75% GHG Emi

  9. Slide 9: Sustainability Reporting

    SUSTAINABILITY REPORTING Climate Report (March 2024) • Climate scenario analysis conducted using low and high emissions scenarios over three time horizons (present day, 2030 and 2050) • Physical climate risks and opportunities were assessed on priority assets using nine climate hazards • Transition

  10. Slide 10: Five-Year Plan Highlights

    FIVE-YEAR PLAN HIGHLIGHTS Capital Rate Funding Dividend Expenditures Base Plan Growth $26B 6.5% >12% 4-6% 2025-2029 2024-2029 Average Cash Flow Annual Dividend Growth Capital Plan CAGR To Debt Metrics Guidance Extended to 2029 $1B ~$14B ~59% ~4% Increase over Increase to $53B Funded by Cash From Q4

  11. Slide 11: 2025-2029 $26B Capital Plan

    2025-2029 $26B CAPITAL PLAN $1 Billion Increase Key Drivers Over Prior Plan of Growth(1) ITC >99% $26.0B ↑ $0.4B FortisAlberta ↑ $0.4B Regulated Investments $25.0B • MISO LRTP and reliability improvement projects • Customer growth & incremental expenditures for Only 9 metering & facilities Major Cap

  12. Slide 12: Five-Year Rate Base CAGR of ~6.5%

    FIVE-YEAR RATE BASE CAGR OF ~6.5% Consolidated 5-Year Rate Base Rate Base CAGR by Segment $53.0B ITC 7.0% $38.8B U.S. Electric & Gas(1) 6.8% Other Electric(2) 6.3% Western Canadian 5.8% Electric & Gas(3) 2024F 2029F Note: U.S. dollar-denominated rate base converted at a foreign exchange rate of 1.36

  13. Slide 13: Balanced Approach to Funding Growth

    BALANCED APPROACH TO FUNDING GROWTH $26B Key Highlights Capital Plan • Funding plan largely consistent with 2025-2029 Equity prior year plan Corporation’s DRIP at current participation levels(1) 11% and employee share purchase plans • Equity funded through DRIP program 30% Net Debt • $500M ATM progr

  14. Slide 14: Funding Plan Supports Investment-Grade Credit Ratings

    FUNDING PLAN SUPPORTS INVESTMENT-GRADE CREDIT RATINGS Credit Ratings & Cash Flow to Outlooks Debt Metrics Baa3 A-(1) A (low) Stable Negative Stable 12.1% 12.2% 11.6% 11.4% 11.6% 11.1%(2) Key Credit Strengths Strong business risk profile Geographic and regulatory 2023A 2024F 2025-2029F Avg. diversity

  15. Slide 15: Strong Liquidity

    STRONG LIQUIDITY Q3 2024 Long-Term Preference Share Credit Dividends Facilities Debt Issuances • Fortis Inc. – $500M 7-year notes at 4.17% • Preference share dividend rate resets • UNS Energy – US$400M 10-year notes at ▪ Series M – $600M (Q4 2024)(1) 5.20% ▪ Series H – $192M (Q2 2025) $4.2B $4.4B •

  16. Slide 16: Opportunities to Expand and Extend Growth Beyond the Plan

    OPPORTUNITIES TO EXPAND AND EXTEND GROWTH BEYOND THE PLAN • MISO LRTP Tranche 2.1 • 2023 IRP • Tilbury LNG Expansion • Transmission Investments At least US$3B expected in Investment opportunity of Marine bunkering Supporting delivery of offshore Michigan and Minnesota where ~US$2.5-$5.0B through 203

  17. Slide 17: Key Transmission Investments

    KEY TRANSMISSION INVESTMENTS MISO LRTP Tranche 2.1 • In September 2024, MISO released its final Tranche 2.1 portfolio of projects which includes 24 projects totaling US$21.8B • At least US$3B of capital investment expected at ITC for projects in Michigan and Minnesota where ROFRs are in effect; majo

  18. Slide 18: Long Capex Runway

    LONG CAPEX RUNWAY Responding to stakeholder expectations and capitalizing on opportunities to expand & extend growth Connect more renewable Replace aging assets to generation to the grid maintain reliability Build more renewable Invest in technology to ensure C02 generation and provide security and

  19. Slide 19: Recent Regulatory Activity

    RECENT REGULATORY ACTIVITY MISO Base ROE Transmission ROFR ACC Generic 2025 General Regulatory Lag Docket Rate Application • In 2022, the U.S. Court of Appeals for the D.C. • In 2023, the Iowa District Court ruled that the • In December 2024, a formula rate plan policy • In August 2024, Central Huds

  20. Slide 20: Three-Year Look Back

    THREE-YEAR LOOK BACK Adjusted EPS & Rate Base Adjusted Dividend Payout Ratio 41.5 3.3 $3.09 $37.0B 3.1 115% 36.5 $34.1B $30.5B $31.1B 2.9 $2.78 105% 31.5 $2.59 2.7 $2.57 26.5 95% 2.5 21.5 2.3 85% 16.5 2.1 79% 78% 75% 74% 75% 11.5 1.9 6.5 65% 1.7 1.5 1.5 55% 2020 2021 2022 2023 2020 2021 2022 2023 Ad

  21. Slide 21: Total Shareholder Returns

    TOTAL SHAREHOLDER RETURNS Cumulative 20-Year Total Shareholder Return Average Annual 676% Total Shareholder Returns 1-Year​ 20.0% 406% 394% 5-Year​ 7.8%​ 10-Year​ 8.4%​ 20-Year​ 10.8%​ 2004 2009 2014 2019 2024 Fortis S&P/TSX Composite Index S&P/TSX Capped Utilities Index Note: Cumulative and average

  22. Slide 22: Dividend Guidance Supported by Long-Term Growth Strategy

    DIVIDEND GUIDANCE SUPPORTED BY LONG-TERM GROWTH STRATEGY ~4% Increase in Q4 2024 Dividend 51 Years of Consecutive Increases in Dividends Paid 4-6% Annual Dividend Growth Guidance through 2029 73 75 77 79 81 83 85 87 89 91 93 95 97 99 01 03 05 07 09 11 13 15 17 19 21 23 24 22 22 22

  23. Slide 23: Why Invest in Fortis?

    WHY INVEST IN FORTIS? SUSTAINABLE GROWTH Focused on Executing Strong Robust Transparent Rate Base Growth Transmission Funding Plan Investment Pipeline Cleaner 4-6% Annual Investment-Grade Energy Transition Dividend Growth Credit Ratings LOW-RISK Safe, Well-Run Utilities Regulatory & Constructive Str

  24. Slide 24: Appendix

    APPENDIX FORTIS...

  25. Slide 25: Table of Contents

    TABLE OF CONTENTS ITC Holdings Corp. 26-27 UNS Energy 28-30 Central Hudson 31-32 FortisBC 33-34 FortisAlberta 35-36 Other Electric Utilities 37-38 2025-2029 Capital Plan by Business Unit 39 Major Capital Projects 40 2024-2029 Rate Base by Business Unit 41 Sensitivity Exposure 42 Ongoing Regulatory P

  26. Slide 26: ITC Overview

    ITC OVERVIEW FERC REGULATED ELECTRIC TRANSMISSION UTILITY 26,100 km $12.8 billion Lines of transmission 2025F rate base Assets in 8 U.S. States 22,102 MW Michigan and Iowa key states Peak demand ~750 Fortis owns 80.1% dedicated employees Interest in ITC FERC Rate Regulated 10.73-11.41% Allowed ROE C

  27. Slide 27: ITC Capital Investment Overview

    ITC CAPITAL INVESTMENT OVERVIEW $4.0B Infrastructure Investments Grid Security Rebuild, reliability, resiliency, system efficiencies, increased capacity, circuit overloads, pocket load growth MISO LRTP $1.7B MISO Long-Range Transmission Plan Includes portion of investments for Tranche 1 & 2.1 $7.6B

  28. Slide 28: UNS Energy Overview

    UNS ENERGY OVERVIEW VERTICALLY INTEGRATED ELECTRIC AND GAS UTILITY 23,200 km $7.7 billion of electric T&D lines 2025F rate base 5,100 km 3,314 MW of natural gas T&D lines Peak demand 719,000 ACC & FERC Regulated electric and gas customers Cost of service/historical test year & FERC formula transmiss

  29. Slide 29: UNS Energy Capital Investment Overview

    UNS ENERGY CAPITAL INVESTMENT OVERVIEW Generation $2.0B Energy Resources Maintenance Expected energy storage, renewables and other investments associated with exit from coal IT, General & Other $1.3B Distribution Infrastructure Energy Resources Grid resiliency and modernization $5.3B $1.1B Transmiss

  30. Slide 30: 2023 TEP IRP Supports Exit from Coal

    2023 TEP IRP SUPPORTS EXIT FROM COAL Exit from Coal On Track Delivering reliable, cleaner energy that is lower risk and affordable for customers 2017-2023 2024-2032 TEP 2023 IRP Highlights(3,970 MW) 508 MW Coal-free ✓ 2,240 MW of wind and solar generation Completed Coal Retirements generation mix by

  31. Slide 31: Central Hudson Overview

    CENTRAL HUDSON OVERVIEW ELECTRIC AND GAS T&D UTILITY 15,200 km ~1,200 of electric T&D lines dedicated employees 2,400 km $3.4 billion of natural gas T&D lines 2025F rate base New York Public Service 315,000 electric customers Commission Regulated Cost of service on future test year 90,000 9.5% 48% n

  32. Slide 32: Central Hudson Capital Investment Overview

    CENTRAL HUDSON CAPITAL INVESTMENT OVERVIEW Transmission Infrastructure $1.35B Distribution Infrastructure Distribution automation and modernization $2.3B Distribution Infrastructure $600M IT, General & Other Building the workforce of the future Capital Plan(1) 2025-2029 $350M Transmission Infrastruc

  33. Slide 33: FortisBC Overview

    FORTISBC OVERVIEW GAS LDC AND INTEGRATED ELECTRIC UTILITY 51,600 km ~2,700 of natural gas T&D lines dedicated employees 7,300 km $8.1 billion of electric T&D lines 2025F rate base 1.1 million BCUC Regulated natural gas customers Cost of service with incentive mechanisms 191,000 Gas 45% 9.65% electri

  34. Slide 34: FortisBC Capital Investment Overview

    FORTISBC CAPITAL INVESTMENT OVERVIEW Renewable Gases $2.7B Reliability & Integrity Investments AMI Project Ongoing capital and includes customer growth and general plant investments $1.2B LNG Projects $4.8B Reliability LNG Tilbury 1B Tilbury LNG Storage Expansion Capital Plan & Integrity Investments

  35. Slide 35: FortisAlberta Overview

    FORTISALBERTA OVERVIEW ELECTRIC DISTRIBUTION UTILITY 90,500 km $4.7 billion distribution lines 2025F rate base ~85% 592,000 of revenue derived from customers fixed-billing determinants 2,643 MW AUC Regulated Peak demand Performance-based rate-setting (PBR) 9.28% 37% ~1,200 2024 Equity dedicated empl

  36. Slide 36: FortisAlberta Capital Investment Overview

    FORTISALBERTA CAPITAL INVESTMENT OVERVIEW IT, General & Other $2.7B Distribution Infrastructure Safety and reliability of distribution assets, meter upgrades, pole management program, modernization Distribution Infrastructure $3.4B $700M IT, General & Other Capital Plan 2025-2029 36

  37. Slide 37: Other Electric Overview

    OTHER ELECTRIC OVERVIEW ELECTRIC T&D UTILITIES 23,000 km Five of electric T&D lines regulated electric utilities(1) 484,000 Equity investments customers Wataynikaneyap Partnership & Belize Electricity ~1,550 Three dedicated employees North American countries $4.0 billion 8.75% 43.0% 2025F rate base

  38. Slide 38: Other Electric Capital Investment Overview

    OTHER ELECTRIC CAPITAL INVESTMENT OVERVIEW IT, General & Other $1.1B Distribution Infrastructure Transmission $700M Generation Diversification $2.5B Infrastructure Capital Plan(1) Distribution $400M Transmission Infrastructure Infrastructure 2025-2029 $300M IT, General & Other Generation Diversifica

  39. Slide 39: 2025-2029 Capital Plan by Business Unit

    2025-2029 CAPITAL PLAN BY BUSINESS UNIT Capital Plan 2025-2029 ($MILLIONS) 2025F 2026F 2027F 2028F 2029F TOTAL Regulated – Independent Electric Transmission ITC 1,403 1,488 1,523 1,600 1,573 7,587 Regulated – U.S. Electric & Gas UNS Energy 1,276 1,087 1,201 1,138 581 5,283 Central Hudson 462 480 440

  40. Slide 40: Major Capital Projects

    MAJOR CAPITAL PROJECTS 2025- Estimated Completion ($ Millions) 2024F 2029F Date Major Capital ITC MISO LRTP(1) 27 1,739 Post-2029 Projects ~23% UNS IRP Related Generation(2) - 1,621 Various UNS Roadrunner Reserve Battery Storage Project 1 313 23 2025 UNS Roadrunner Reserve Battery Storage Project 2

  41. Slide 41: 2024-2029 Rate Base by Business Unit

    2024-2029 RATE BASE BY BUSINESS UNIT Rate Base 5-YEAR CAGR to ($BILLIONS, EXCEPT FOR CAGR) 2024F 2025F 2026F 2027F 2028F 2029F 2029 Regulated – Independent Electric Transmission ITC(1) 12.3 12.8 13.9 14.8 15.7 16.5 7.0% Regulated – U.S. Electric & Gas (2) UNS Energy 7.6 7.7 8.3 8.8 9.8 10.7 6.7% Cen

  42. Slide 42: Sensitivity Exposure

    SENSITIVITY EXPOSURE Foreign Exchange • Assumed forecast USD:CAD FX rate of 1.30 for 2025-2029 • 65% of regulated earnings(1) / 60% of capital plan in USD at U.S. & Caribbean utilities • +/- $0.05 change in USD:CAD ▪ EPS: ~$0.06 ▪ Five-year capital plan: $600M ROE & Equity Ratio ROE Equity +/- 25 bp

  43. Slide 43: Ongoing Regulatory Proceedings

    ONGOING REGULATORY PROCEEDINGS MISO Base ROE In 2022, the U.S. Court of Appeals for the D.C. Circuit vacated certain FERC orders that established the methodology used to calculate the MISO base ROE; matter dates back to complaints filed at FERC in 2013 and 2015; D.C. Circuit noted FERC did not adequ

  44. Slide 44: Sustainability Leadership

    SUSTAINABILITY LEADERSHIP Climate and Innovation Community and Indigenous Relations • 2050 net-zero direct emissions goal with interim targets to reduce GHG emissions • Building on our strong record of mutually beneficial partnerships with 50% by 2030 and 75% by 2035 Indigenous peoples • Progress: M

  45. Slide 45: Debt Maturities & Preference Share Dividends

    DEBT MATURITIES & PREFERENCE SHARE DIVIDENDS Debt Maturities Preference Share Dividend Rate Resets & Conversions 10-Year Debt Maturities 2024 $2.5 $2.0 billions $1.5 Series M - $600M December 1, 2024(2) $1.0 $0.5 Series H - $192M Series I - $58M $- June 1, 2025 (2) 2025F 2026F 2027F 2028F 2029F 2030

  46. Slide 46: Strong Investment-Grade Credit Ratings

    STRONG INVESTMENT-GRADE CREDIT RATINGS (1) Company Fortis Inc. A-(2) Baa3 A (low) ITC Holdings Corp. A-(2) Baa2 n/a ITC Regulated Subsidiaries A A1 n/a TEP A- A3 n/a Central Hudson BBB+ Baa1 n/a FortisBC Energy n/a A3 A FortisBC Electric n/a Baa1 A (low) FortisAlberta A- Baa1 A (low) Newfoundland Po

  47. Slide 47: Strong Leadership Team

    STRONG LEADERSHIP TEAM Fortis Inc. Executive David Hutchens Jocelyn Perry Jim Reid Gary Smith Stuart Lochray President & CEO EVP, CFO EVP, Sustainability & CLO EVP, Operations & Innovation Sr. VP Capital Markets & Business Development Utility CEOs Linda Apsey Stephanie Raymond Roger Dall’Antonia Rut

  48. Slide 48: Glossary

    GLOSSARY ACC Arizona Corporation Commission GCOC generic cost of capital AMI Advanced Metering Infrastructure GHG greenhouse gas ATM At-the-market equity program GWh Gigawatt hours AUC Alberta Utilities Commission IRP Integrated Resource Plan BC British Columbia IT Information technology BCUC Britis

Fortis — Investor Presentation (December 2024) on 6ix