E2gold, Inc. · TSXV:ETU
E2gold — Investor Presentation (March 2023)
19 slides from E2gold's investor presentation, Mar 1, 2023
Slide 1: Lead. Innovate. Discover.
Lead. Innovate. Discover. SYMBOL - TSX-V:ETU | OTCQB: ETUGF Corporate Presentation| Winter 2023
Slide 2: Disclaimer
Disclaimer E2Gold Inc. (the “Company” or “E2Gold”) is a mineral exploration focused title disputes; revisions to the Company’s proposed activities as plans continue to Technical Disclosure company and the Hawkins Gold Project is in the mineral exploration stage only. The be refined; significant expe
Slide 3: Why E2Gold
Why E2Gold Key takeaways: • The right neighborhood – world class mining Oba jurisdiction along Hemlo-Timmins corridor 1 • Solid foundation – at-surface 328,800 oz gold resource open all around, ready for new discovery E2Gold “Camp” • Committed partners – Kinross Gold and Crescat Capital each own 10%
Slide 4: Location on Timmins-Hemlo Trend
Location on Timmins-Hemlo Trend Porcupine-Destor Cadillac-Larder Lake Break Highlights Hawkins Project Band-Ore Project (Historic Resources) • Along major regional gold trends • A district-scale play • Main Zone: 706,000t @ 6.86g/t for • Upside potential: gold resources • McKinnon Zone, 6.2Mt @ 1.65
Slide 5: Claims Acquisition History
Claims Acquisition History Stats: • 68,110 ha (681 km2) • 80 Km long • 3,217 claims Lead.Innovate.Discover. 5 5
Slide 6: Hawkins Project: A District-Scale Property
Hawkins Project: A District-Scale Property KB Claims Central Hawkins Corridor Eastern Block McKinnon Zone in Trench • 80 km long-classic gold-greenstone belt anchored by McKinnon Zone Inferred Resource Puskuta Lake • Covers most of the KB Greenstone Belt which Shear Zone includes the Sugar Zone Gold
Slide 7: The McKinnon Zone
The McKinnon Zone McKinnon Inferred Resource: 328,000 oz Maldonite (Au-Bi) in pyrite Au, 6.2 Mt @1.65 Au g/t. Geologic Characteristics • Geologic characteristics are similar to other gold deposits such as Hemlo and Borden: • Planar disseminated gold Resource over a large area: 3.5 Km strike by avg.
Slide 8: Drilling at McKinnon
Drilling at McKinnon McKinnon Zone Contoured Longitudinal Section (looking north) FROM LENGTH Next Steps: HOLE (m) TO (m) (m) AU (g/t) • Long-term: expand the Resource at depth MK21-005 Including 93.0 96.0 99.0 96.5 6.0 0.5 5.78 30.90 determine ore shoot orientation and 96.5 97.0 0.5 9.71 • Struct
Slide 9: McKinnon: A Structural Story
McKinnon: A Structural Story McKinnon Zone IP Resistivity showing cross-cutting structures Structural interpretation over the Central Hawkins Corridor Central Hawkins Corridor prospects overlaying magnetics. Lead.Innovate.Discover. 9 9
Slide 10: Next Steps: Proof of Concept & Drilling
Next Steps: Proof of Concept & Drilling Grid 3 Au soils and IP conductivity anomalies overlaying TMI. Lead.Innovate.Discover. 10
Slide 11: Goldfields: The Right Geology
Goldfields: The Right Geology • High grade gold in siliceous layers within folded pillowed basalt sequence • Historical soil anomalies surrounding a “felsite” plug (granite) • Next Steps: broaden the historical work through linecutting, IP, geochemistry, followed by trenching/drilling Anomalies in t
Slide 12: Target Development Beyond McKinnon
Target Development Beyond McKinnon Till Sampling • Lidar Survey completed in 2022 • Outcrop location • Overburden mapping • Till sampling survey planning underway, first test survey to begin this winter • Standard for future exploration and drill targeting: Geophysics Geochemistry Trenching/Drilling
Slide 13: Hawkins: Multiple Exploration Fronts
Hawkins: Multiple Exploration Fronts Ongoing and planned activities at various stages of exploration, from reconnaissance mapping and prospecting to drilling McKinnon Zone Oba Program Plan • McKinnon: Structural work & planning for next drill program Eastern Block KB • Grid 3: interpretation/plannin
Slide 14: Band-Ore Project: Highlights
Band-Ore Project: Highlights • 10 km-long property near highway: little work over 30 years but with numerous high-grade targets • Drill program on Main and No. 4 Zones completed in Fall: 7 holes for 1,002 m • Follow-up drilling/trenching dependent on Fall results and will include untested IP targets
Slide 15: Band-Ore Project: First Drill Results
Band-Ore Project: First Drill Results • Drill program on Main and No. 4 Zones completed in Fall 2022: 7 holes for 1,002 m • Main Zone hosted in 2,000 m by 300 m wide QF Porphyry, in anastomosing, pyritic shear zones • No. 4 zone hosted in pyritic, silicified sericite(+/-chlorite) schist (metaseds, v
Slide 16: Contact Us
Contact Us Eric Owens, CEO, & Director T: 416-509-5385 E: eric.owens@e2gold.ca Ellie Owens, President C: 647-575-2888 E: ellie.owens@e2gold.ca 2020 Field crew at the Goldfield's Showing 16
Slide 17: Appendix: TSX-V:ETU Share Structure
Appendix: TSX-V:ETU Share Structure Cap Table Shares Issued 147,071,309 Warrants* 90,168,180 Options** 9,420,000 52-wk H/L $0.30/$0.03 Market Cap (@ $0.05) $ 7,353,565 *Warrant Breakdown: **Option Breakdown: 2.7M @ $0.28 exp. Dec 2022 6.8M @ $0.13 exp. Aug 2024; 45.7M @ $0.15 exp. Jul 2023 0.2M @ $0
Slide 18: Appendix: McKinnon Zone: Mineralogy
Appendix: McKinnon Zone: Mineralogy Maldonite (Au-Bi) in pyrite Electrum GarnetEpidote Fe-Sphalerite Pyrite Electrum on quartz Lead. Innovate. Discover.
Slide 19: Appendix: Notes on Resource Calculations
Appendix: Notes on Resource Calculations Note 1: Historic resources are not compliant with National Instrument 43-101, and should not be relied on. The Band-Ore mineral resource estimates are considered to be ‘historical’ in nature and are not compliant with National Instrument 43-101. Neither Golde