Copper Giant Resources Corp · TSXV:CGNT
Copper Giant Resources — Libero Copper — Investor Presentation (March 2025)
32 slides from Copper Giant Resources's investor presentation, March 2025
Slide 1: The Next Copper Giant
THE NEXT COPPER GIANT VISION – EXPERTISE - RESOURCE MARCH 2025 TSXV: LBC OTCQB: LBCMF FRA: 29H
Slide 2: Disclosure
DISCLOSURE Certain statements included in this presentation are forward-looking statements within the meaning of Canadian securities laws, including the following statements: the ability of Libero Copper Corporation (“Libero” or the “Company”) to develop resources and then further develop reserves a
Slide 3: Who We Are
WHO WE ARE COLOMBIA COPPER FIORE &MOLY MOCOA 2.1 MILLION FRANK GIUSTRA TONNES1 Principal Shareholder CEO Fiore Group OF CONTAINED COPPER (4.6 billion pounds) 2000’s • Endeavour Financial 0.23 MILLION • Endeavour Mining • Wheaton River Minerals (which later became TONNES Goldcorp) OF CONTAINED MOLYBD
Slide 4: Colombia Experience
EXPERIENCE COBRE PANAMA PANAMA Frank Giustra 85Mt/year PRINCIPAL SHAREHOLDER 660Mlb/year Copper CEO Fiore Group (1.5% of World Supply) Segovia Co-founder of Aris Mining Avg. Grade 0.37% Copper Aris Mining COLOMBIA Marmato Ernest Mast Frank Balint DIRECTOR STRATEGIC ADVISOR CEO Cobre Panama – 30-year
Slide 5: Colombia: Prolific Jurisdiction
PROLIFIC JURISDICTION JURASSIC COPPER BELT COLOMBIA MOCOA 636Mt (Inf) 1 @ 0.45% CuEq2 (0.33% Cu and 0.038% Mo), contained 2,9Mt of CuEq2 PANANTZA - SAN CARLOS MIRADOR WARINTZA 1For further technical information about the mineral resource estimate see slide 31. ²Libero Copper defines copper equivalen
Slide 6: Team
TEAM MANAGEMENT DIRECTORS Ian Harris Ernest Mast MSc. Metallurgical Mining engineer with 25 years engineer with 30 years of experience, 20 in South experience. America. Thyana Álvarez Jay Sujir Senior partner with Farris, Vaughan, 20 years working with and for communities Wills & Murphy LLP. Member
Slide 7: Share Structure
SHARE STRUCTURE CAPITAL STRUCTURE KEY SHAREHOLDERS As of Dec 31, 2024 Shares Issued & Outstanding: 57.3 M Warrants: 44.7 M Options: 5.2 M Fully Diluted: 102.0 M Market Cap: C$18 M Cash: ~3.0 M 29% MANAGEMENT, TRADING SUMMARY INSIDERS AND 35.5% 11% AFFILIATES RETAIL O 0.6900 H 0.7600 L 0.6500 C 0.650
Slide 8: Copper in the headlines
AI Wreaks Havoc on Copper is the Global Power Systems Five reasons missing ingredient - Bloomberg of the energy why we are Inside a copper transition entering the next copper “ output plunge at No. 1 - Economist global producer super cycle Codelco - Reuters Copper in ‘the- Mining.com foothills New Y
Slide 9: Fueling a Long-Term Copper Supply Crisis
SHORT TERM VOLATILTY Fueling a Long-Term Copper Supply Crisis 5.2 5.0 NEAR TERM EVENT DRIVEN 4.8 Hard/Soft Landing? Copper (US$/lb) 4.6 “Copper the US Elections: New Oil” Tariffs Goldman Sachs Crypto-boom 4.4 4.2 FED First China Rate Cuts Economy 4.0 3.8 3.6 Mar May Jul Sep Nov 2025 TSXV: LBC | OTCQ
Slide 10: Layered Demand
LAYERED DEMAND Traditional, Transition & Digital 600 2040F ´Traditional´ 39.1M tonnes Energy economic growth transition Digital 500 Developed replacement EVs Electrification of industry Date centres 5G • Copper demand keeps rising with the world’s ongoing electrification, but demand Wind Internet of
Slide 11: Lack of Discovery & Copper Outlook
LACK OF DISCOVERY & COPPER OUTLOOK Brownfields Squeezed Only two project over 50ktpy • Lack of greenfields investment — and squeezing every last ton out of brownfields — has left the well dry • Major new discoveries have dried up and deposits are getting deeper, driving up costs • 239 major copper d
Slide 12: Mocoa
MOCOA
Slide 13: Project: Mocoa
PROJECT: MOCOA Location 4.6 BILLION Putumayo, Colombia (1,300-1,600masl) POUNDS OF CONTAINED COPPER Deposit (2.1 million tonnes) Porphyry ¹Technical Report on the Mocoa Copper-Molybdenum Project, Colombia, dated January copper – molybdenum 17thinformation,, prepared by Michel Rowland Brepsant, FAusI
Slide 14: Project Infrastructure
PROJECT INFRASTRUCTURE CAUCA NARIÑO PUTUMAYO LARGE LAND HOLDING GRID POWER 80 km2 property National grid with NATIONAL ROAD SYSTEM 100%-owned; 2x 230Kv lines Project is connected that national road Located over the system with nearby access to regional Jurassic belt. airports. 190km northeast of PAS
Slide 15: One of the World's Largest Undeveloped Molybdenum Deposits
ONE OF THE WORLD’S LARGEST UNDEVELOPED MOLYBDENUM DEPOSITS Contained Molybdenum Mo Grade (%) PROJECT (M lbs) Pebble Mine (Alaska) Northern Dynasty Minerals 5,600 0.024% Malmbjerg (Greenland) Greenland Resources 703 0.106% 1Mocoa (Colombia) Libero Copper 511 0.036% Ruby Creek (Canada) Stuhini Explora
Slide 16: 2025 Exploration Plan
2025 EXPLORATION PLAN NEBLINA WEST TARGET 1000 metres Copper equivalent (CuEq) for drill hole interceptions is calculated as: CuEq (%) = Cu (%) + 4.2 Mo (%), utilizing metals prices of Cu – US$4.00/lb and Mo – US$20.00/lb and metal recoveries of 90% Cu and 75% Mo. EXISTING RESOURCE AREA (CURRENTLY D
Slide 17: Drill Results to Date
DRILL RESULTS TO DATE MD-043 @264m. MD-043 @284m. Hydrothermal breccia with massive Hydrothermal breccia with ▪ Strong and consistent copper and molybdenum chalcopyrite and moly in-fill massive chalcopyrite and moly mineralization from surface to the bottom of the hole in-fill ▪ Multi-stage minerali
Slide 18: Consistent Copper Results
CONSISTENT COPPER RESULTS COPPER ONLY METAL FACTOR (%CU-M) 574m @ 1.55% Cu from 50m Entreé / Oyu Tolgoi – UGD735 773m @ 1.02% Cu from 430m NGEX / Lunahuasi – DPDH021 1,298m @ 0.59% Cu from 192m Filo Corp / Filo del Sol – FSDH094 1,517m @ 0.49% Cu from 325m Aldebaran / Altar – ALD-24-243 1,226m @ 0.5
Slide 19: Cross Section: North-South
CROSS SECTION: NORTH-SOUTH NS SECTION NORTH WE SECTION SOUTH LOOKING WEST TSXV: LBC | OTCQB: LBCMF | FRA: 29H 19
Slide 20: Cross Section: West-East
CROSS SECTION: WEST-EAST NS SECTION NS SECTION WE SECTION WE SECTION WEST EAST EAST LOOKING NORTH TSXV: LBC | OTCQB: LBCMF | FRA: 29H 20
Slide 21: MD-046: Eastern Step-Out
MD-046: EASTERN STEP-OUT MD-046 (Drilling) MD-045 MD-046 (currently drilling) TSXV: LBC | OTCQB: LBCMF | FRA: 29H 21
Slide 22: Expansion & Targets
EXPANSION & TARGETS TSXV: LBC | OTCQB: LBCMF | FRA: 29H 22
Slide 23: The Libero Way
THE LIBERO WAY 75 Emp. 85% Putumayo 230 Local suppliers 527 Jobs created Local Manufacturing Strong Communication LOCAL Water Baseline: University-Community STRENGTH Montclar Agreement Offical Condagua Dialogue POLITICAL INTERNAL WILL VALUES • National Strategic Plan (May 4, 2024) Significant nation
Slide 24: Local Strength
LOCAL STRENGTH Cuaran Vélez Diverso Mocoa Montclar Water Sampling Supplies safety boots to Provides Libero’s uniforms, Cooperation Agreement Training Program Libero Copper, marking the grew from 3 to 15 Jobs, On November 21, 2022, Libero Copper partnered with first time these essential Empowering Wo
Slide 25: National Reputation
NATIONAL REPUTATION 10th Annual Brújula Minera (“Mining Compass”) at the National Mining Conference – Ranking of Mining Company Reputation Reputation with Government Authorities: Ranked 13th, the Reputation in Mining Municipalities: Ranked 12th, second-highest exploration company after AngloGold Ash
Slide 26: Political Will
POLITICAL WILL “LIBERO COPPER COMPLETES MONTCLAR “LIBERO COPPER ANNOUNCES UPDATE TO BRIDGE, SUPPORTING EXPANDED COLOMBIA’S CADASTRAL RECORDS EXPLORATION AT MOCOA PORPHYRY COPPER- ENHANCING MOCOA PROJECT POTENTIAL” MOLYBDENUM PROJECT, COLOMBIA” Nov 12, 2024 Feb 12, 2025 UPDATED MOCOA RESERVE RESOU`RC
Slide 27: Importance of Sponsorship
IMPORTANCE OF SPONSORSHIP “ March 11, 2024 “Libero Copper Secures As part of the Fiore Group, we have unparalleled access to capital $2.9 M Financing” and strategic support. Underpinned by an amazing asset and backed by February 15, 2024 a team of experienced mine builders ” “Libero Copper Closes an
Slide 28: Building a Pathway to a Mine
BUILDING A PATHWAY TO A MINE TSXV: LBC | OTCQB: LBCMF | FRA: 29H 28
Slide 29: Libero Copper's Unique Position
LIBERO COPPER’S UNIQUE POSITION EXPERIENCE Mirador Cobre Panamá Aris Mining TWO TIERS OF $/LB + ADVANCING RESOURCE VALUATION THE NEXT MAJOR COPPER MAJOR PLAYER RESOURCE Mocoa NON- 4.6 billion ADVANCING IN COPPER + ACCESS TO CAPITAL Fiore VISION RESOURCE COPPER COPPER OUTLOOK VALUATIONS TSXV: LBC | O
Slide 30: Additional Information
ADDITIONAL INFORMATION Ian Harris President & CEO +1 604 294 9039 harris@liberocopper.com Tetiana Konstantynivska TSXV: LBC | OTCQB: LBCMF VP Investor Relations +1 778 829 8455 tk@liberocopper.com www.liberocopper.com
Slide 31: Mocoa - Mineral Resource Notes
MOCOA - MINERAL RESOURCE NOTES LOCATION CATEGORY MTONNES CuEq (%) Cu (%) Mo (%) CuEq (Blbs) Cu (Blbs) Mo (Mlbs) Oxide and Transition Inferred 139 0.41 0.32 0.026 1.25 0.99 78.3 Sulphide Inferred 497 0.46 0.33 0.04 5.06 3.61 432.7 Total Inferred 636 0.45 0.33 0.036 6.31 4.6 510.5 Notes: 1.The mineral
Slide 32: Mocoa – QA/QC and Technical Notes
MOCOA – QA/QC AND TECHNICAL NOTES Notes on drill results 1.*Copper equivalent (CuEq) for drill hole interceptions is calculated as: CuEq (%) = Cu (%) + 4.2 × Mo (%), utilizing metal prices of Cu - US$4.00/lb, Mo - US$20.00/lb. Metal recoveries utilized for the resource model are 90% for Cu and 75% f