Kay Cee Energy & Infra Limited · NSE:KCEIL

Kay Cee Energy & Infra — H1 FY26 Earnings Presentation

32 slides from Kay Cee Energy & Infra's earnings presentation, Nov 10, 2025

  1. Slide 1: Cover letter to NSE

    KAY CEE ENERGY & INFRA LIMITED REGD. OFFICE: G-249, INDRAPRASTHA INDUSTRIAL AREA, ROAD NO. 5, OPPOSITE PASHAN BHAWAN, TALWANDI KOTA, KOTA-324005 RAJASTHAN. CIN: U74900RJ2015PLC046976 Email: kaycee.energy.infra@gmail.com (M): +91- 6377208324/8829970700 Email: info@kayceeenergy.in Website: https://kay

  2. Slide 2: Kay Cee Energy & Infra Limited Investor Presentation H1 FY26

    KAY CEE ENERGY & INFRA LIMITED INVESTOR PRESENTATION H 1 FY2 6

  3. Slide 3: Disclaimer

    DISCLAIMER R This presentation or any other documentation or information (or any part thereof) delivered or supplied should not be deemed to constitute prospectus or placement memorandum or an offer to acquire any securities . No representation or warranty, express or implied is made as to, and no r

  4. Slide 4: Content

    CONTENT 01 Performance 02 03 04 About Us Our Services Clientele Highlights 05 06 07 08 Management Growth Drivers Industry Financials

  5. Slide 5: H1 FY26 YoY Performance Highlights

    H1 FY26 YOY PERFORMANCE HIGHLIGHTS Revenue (In Lakhs) EBITDA (In Lakhs) PAT (In Lakhs) 1,610.68 8,332.76 918.70 848.29 500.15 3,786.04 H1 FY25 H1 FY26 H1 FY25 H1 FY26 H1 FY25 H1 FY26 PAT Margin (%) EPS (In Lakhs) 7.61 13.04% 10.93% 4.56 H1 FY25 H1 FY26 H1 FY25 H1 FY26 Investor Presentation Note: The

  6. Slide 6: FY25 YoY Performance Highlights

    FY25 YOY PERFORMANCE HIGHLIGHTS Revenue (In Lakhs) EBITDA (In Lakhs) PAT (In Lakhs) 2,761.89 1,706.20 15,268.05 1,319.55 6,446.52 654.53 FY24 FY25 FY24 FY25 FY24 FY25 PAT Margin (%) EPS (In Lakhs) 15.57 11.17% 10.15% 7.61 FY24 FY25 FY24 FY25 Investor Presentation Note: The comparison is based on sta

  7. Slide 7: About Us

    ABOUT US SERVING POWER COMPREHENSIVE EPC PROVEN TRACK OPERATION AND CUSTOMIZED SECTOR SERVICES RECORD MAINTENANCE SOLUTIONS EXPERTISE We are an ISO 9001 :2015 certified As an Engineering, Procurement, Our successful execution of EPC We undertake turnkey, partial We offer operation and organization s

  8. Slide 8: Our Solutions

    OUR SOLUTIONS Power Transmission Underground Monopoles Lines Electric Transmission Lines Overhead EHV Substations Emergency Transmission Lines Restoration System Investor Presentation 7

  9. Slide 9: Power Transmission Lines

    POWER TRANSMISSION LINES COMPREHENSIVE VOLTAGE RANGE Our company excels in constructing and installing Extra High Voltage (EHV) transmission lines, ranging from 132 kV to 765 kV, meeting the diverse needs of regional and long -distance power transmission . END-TO-END SOLUTIONS We provide complete se

  10. Slide 10: Underground Electric Transmission Lines

    UNDERGROUND ELECTRIC TRANSMISSION LINES OVERVIEW KEY ADVANTAGES COST - EFFECTIVE SOLUTION Undergrounding is an alternative to • Reduced weather -related damage . Underground cables are highly overhead power transmission, offering • No risk of fire . protected and more economical in the low visibilit

  11. Slide 11: Monopoles

    MONOPOLES SPEEDY SOLUTION CUSTOMIZING TURNKEY PROJECTS Monopoles offer a Custom -designed We specialize in turnkey smaller footprint and monopoles meet transmission line faster erection specific needs like span, projects using compared to traditional angle, and cross -arm monopoles and have lattice

  12. Slide 12: Overhead Transmission Lines

    OVERHEAD TRANSMISSION LINES An overhead transmission lines are generally used mode of power transmission using lattice tower structures . The critical components of Overhead Lines are Lattice towers, insulators, conductor, hardware fitting and accessories, Earthing Material and tower accessories etc

  13. Slide 13: EHV Substations

    EHV SUBSTATIONS EPC PROJECT EXECUTION O&M SUBSTATION SERVICES Our Company is engaged into execution of Our company provides comprehensive EPC (supply, erection testing and Operation and Maintenance (O&M) services for commissioning) of switchyards . We substations up to 132 kV, including operation, u

  14. Slide 14: Emergency Restoration System

    EMERGENCY RESTORATION SYSTEM RESTORATION Emergency Restoration System (ERS) structures are a temporary solution designed to bypass the existing transmission towers of any voltage in any terrain . They will be used until the main line is reconstructed or restored . The entire structure can then be di

  15. Slide 15: Our Clientele

    OUR CLIENTELE Investor Presentation 14

  16. Slide 16: Management

    MANAGEMENT Lokendra Jain is the Chairman and Managing Director and one of the promoters of our company . He holds a degree of Diploma in Electrical Engineering and possess more than 29 years of specialized experience in Engineering, Procurement and Construction (EPC) Contracts, Extra High -Voltage (

  17. Slide 17: Growth Drivers

    GROWTH DRIVERS >a .

  18. Slide 18: Capacity Expansion: Backward Integration

    CAPACITY EXPANSION: BACKWARD INTEGRATION TIMELINES PROPOSED OPERATIONAL MANUFACTURING 3 EFFICIENCY UNIT The manufacturing unit is 4 expected to commence commercial production in We plan to establish a Fiscal 2026, positioning The in-house production facility at B-16, Road No. us as a fully integrate

  19. Slide 19: Capacity Expansion: Backward Integration

    CAPACITY EXPANSION: BACKWARD INTEGRATION Plant – I u nder development; location: G -249, Kota -5 Purchased 2018 | 85% work complete | Office premises fully completed and operational | Ancillary manufacturing part will be operational by Fiscal 2025 - 26. Plant – II under development; location: B -16,

  20. Slide 20: Strong In-House Capabilities

    STRONG IN - HOUSE CAPABILITIES PROVEN EPC IN - HOUSE INTEGRATED MODERN MACHINERY AND ERROR REDUCTION AND CAPABILITIES MODEL SKILLED WORKFORCE STRONG SUPERVISION We have established a strong Our integrated approach We have acquired a fleet of To enhance supervision and track record in executing enabl

  21. Slide 21: Collaborative Strength and Project Capabilities

    COLLABORATIVE STRENGTH AND PROJECT CAPABILITIES PROJECT ADDRESSING STRATEGIC EXECUTION GROWING PARTNERSHIPS CAPACITY DEMAND We have the capability to Due to the rising demand for We have formed collaborations independently execute projects larger - scale projects, we with prominent engineering worth

  22. Slide 22: EPC Projects for Private Entities

    EPC PROJECTS FOR PRIVATE ENTITIES COMPREHENSIVE SERVICE OFFERINGS Our services for private entities encompass shifting high -voltage transmission lines, dismantling existing lines, handling, erection, installation, testing, and commissioning of new transmission lines, along with required equipment a

  23. Slide 23: Focussing on Railways & Renewables

    FOCUSSING ON RAILWAYS & RENEWABLES FOCUS ON SOLAR UNDERGROUND SPECIALIZED PROVEN SOLAR PARK EHV LINES IN SERVICE TRACK ENERGY RAILWAYS PORTFOLIO RECORD With the growing potential We aim to provide With the high demand for Our consistent growth in We have significant of renewable energy, comprehensiv

  24. Slide 24: Orderbook Update

    ORDERBOOK UPDATE As of 31/10/2025 Gross Value Executed Unexecuted Sr. No Name of Customer (In ₹ Lakhs) (In ₹ Lakhs) (In ₹ Lakhs) 1 RRVPNL 63,930.59 19,907.05 44,023.54 2 RRVPNL 8,042.50 311.34 7,731.16 3 Gawar Construction Ltd 1,959.53 1,016.16 943.37 4 Saint Gobain 1,908.43 1,566.30 342.13 5 JSW 63

  25. Slide 25: Strategic Joint Venture

    STRATEGIC JOINT VENTURE KAY CEE ENERGY & INFRA LTD. & JOSTS ENGINEERING COMPANY LTD. OBJECTIVE: 01 02 03 • Execute EPC contracts in the power sector Joint Venture Company: Ownership: Industry: • Develop and operate renewable energy Renewable Energy & businesses Suryavayu Renewable and 50% KayCee Ene

  26. Slide 26: High Industry Demand

    HIGH INDUSTRY DEMAND PROJECTED POWER DEMAND AND REQUIRED INVESTMENT India is expected to face a power demand of 277 GW by 2027 , necessitating a significant investment of Rs 4 .25 trillion in power transmission infrastructure, according to the latest National Electricity Plan (NEP) released by the C

  27. Slide 27: High Industry Demand

    HIGH INDUSTRY DEMAND RENEWABLE ENERGY INTEGRATION AND FUTURE PLANS With substantial renewable energy (RE) potential in regions such as Rajasthan, Gujarat, and Tamil Nadu, a transmission system is being planned to integrate over 600 GW of RE capacity by 2031 - 32 . Additionally, during the period 202

  28. Slide 28: Financial Performance

    FINANCIAL PERFORMANCE >a .

  29. Slide 29: Income Statement

    INCOME STATEMENT In Lakhs Particulars H1 FY26 H1 FY25 %Chg FY25 FY24 YOY Revenues 8,332.76 3,786.04 120.09% 15,268.05 6,446.52 136.84% Other Income 69.24 48.47 48.89 39.80 Total Income 8,402.00 3,834.51 119.12% 15,316.94 6,486.32 136.14% Raw Materials 8,389.89 2,882.82 Direct Expenses 5,640.46 2,476

  30. Slide 30: Balance Sheet

    BALANCE SHEET In Lakhs Equities & Liabilities FY25 FY24 Assets FY25 FY24 Equity 1,096.00 1,096.00 Non Current Assets Reserves 5,072.88 3,366.68 Fixed Assets 2,101.91 1,867.96 Net Worth 6,168.88 4,462.68 Non current Investments 2.50 - Non Current Liabilities Deferred Tax Assets 19.54 21.92 Other Non

  31. Slide 31: Stock Data

    STOCK DATA As on 6th November 2025 As on 30 th September 2025 NSE CODE: KCEIL | ISIN: INE0RCG01017 Shareholding Pattern Share Price ( ₹) 185.35 Market Capitalization ( ₹ Cr) 226.57 36.87% No. of Shares 1,22,24,000 63.13% Face Value ( ₹) 10.00 52 week High -Low ( ₹) 418.75 - 157.00 Promoter & Promote

  32. Slide 32: Contact Us

    CONTACT US Company Investor Relations Advisors Kay Cee Energy & Infra Limited EquiBridgex Advisors Pvt Ltd - Ms. Pooja Gandhi info@kayceeenergy.in info@equibridgex.com www.kayceeenergy.com www.equibridgex.com

Kay Cee Energy & Infra — H1 FY26 Earnings Presentation on 6ix