  1. Slide 1: Industry & Investment NSW: Mineral Explorers Presentation - Copper Hill

    For personal use only Industry & Investment NSW: Mineral Explorers Presentation COPPER HILL A copper – gold porphyry deposit JORC resource: 420,000 tonnes of copper and 1.2 million ounces of gold Kim Stanton-Cook Managing Director 18th May 2010

  2. Slide 2: Disclaimer and Competent Person Statement

    For personal use only DISCLAIMER This material contains certain forecasts and forward-looking information, including information about possible or assumed future performance, exploration results, resources or potential growth of Golden Cross Resources Ltd (GCR), industry growth or other trend projec

  3. Slide 3: Copper and gold deposits are GCR's primary targets

    For personal use only Copper and gold deposits are GCR’s primary targets plus base metals, uranium, nickel and coal. Copper – Gold in New South Wales Copper Hill: Inferred-Indicated- Measured JORC Resource containing 1.2 million ounces gold and 420,000 tonnes copper

  4. Slide 4: The GCR-CUMIC Alliance

    For personal use only …and now, the GCR-CUMIC Alliance Another link between Australia and China ….which has led to the GCR – CACS relationship and the Feasibility Study which has commenced.

  5. Slide 5: Golden Cross Resources Australian Project Locations

    Darwin @ Mount Isa (UP CuAu) Highland Sherrin-Lily Quita Bowen (4u Ag) ; Mount Isa Mt Mackenzie 10 Mile Ck Olympic Domain Queensland Coal (Cuau) (Coal) Oolgelima Hill Chinchilla South 2 Warriner Creek Dalby “9 Brisbane Codna Hill Warwick ___ _Koolymilka Mulga Tank " Burra (cu Au) Qi ot || Broken Hil

  6. Slide 6: Golden Cross Resources Australian Project Locations

    2 = O @ D =) © ‘= S Q — @ a. — O LL Perth Mulga Tank (U Ni Au) | WV Kalgoorlie Lachlan Fold Belt Curnamona Province Bowen Basin Mt Isa Inlier Georgina Basin Yilgarn Block m= Olympic Domain Mulga East Darwin @ Mount Isa (UP Cu-au) Highland Sherrin-Lily Quita Mount Isa Olympic Domain (Cuau) Oolgelima

  7. Slide 7: Copper Hill

    For personal use only Copper 铜山 Hill

  8. Slide 8: Copper Hill grade distribution

    For personal use only Copper Hill Grade distribution @ 0.4% Cu cutoff 0.6% Cu O.4% Cu <500 metres> North

  9. Slide 9: Copper Hill Project Whittle Shells

    Copper Hill Project Whittle Shells for Cases 1, 2 & 3) = fe) o) D =) = = fe) A) — ® ‘) — S) LL

  10. Slide 10: Copper Hill JORC Resource Estimate

    铜山 Copper Hill JORC Resource Estimate For personal use only Copper Tonnes Copper Gold (g/t) Contained Contained Cutoff (Mt) (%) Copper (Kt) Gold (M oz) (%) 0.20 133 0.31 0.28 421 1.20 Containing 3.3 million tonnes sulphur in chalcopyrite (CuFeS2) & pyrite (FeS2)

  11. Slide 11: Conceptual Pit Optimisation Parameters

    Copper Hill Project – Conceptual Pit Optimisation Parameters AMDAD Optimised Pit Parameters Case 1 Case 2 Case 3 For personal use only US$/oz Au 600.00 800.00 1000.00 US$/lb Cu 1.90 2.70 3.50 DCF (10%) for 8Mtpa ore throughput. Capital of $420 million A$115 A$360 A$542 deducted million million milli

  12. Slide 12: Potential average annual production rates

    Based on the Case 2 model and assuming 85% For personal use only recoveries and a twenty year mine life , the following average annual production rates are possible for Copper Hill: Copper: 15 to 20,000 tonnes p.a. Gold: 50 to 60,000 ounces p.a. Sulphur: 158,000 tonnes p.a. With potential Acid produ

  13. Slide 13: Maximising Value

    铜山 Maximising Value For personal use only • By producing copper metal, bullion gold, sulphuric acid and iron granules • Higher value products with minimal waste and greatly improved environmental outcomes

  14. Slide 14: Existing Technologies will be used

    Copper 铜山 Hill For personal use only Existing Technologies will be used. On-site: Crushing-Grinding-Flotation At Port Pirie: Roaster-Acid Plant then Copper by SW-EW Gold by CIP/CIL All aspects of this proposal will use ‘off-the shelf’, conventional processes.

  15. Slide 15: Maximising Value: roasting of sulphides

    铜山 Maximising Value For personal use only • Roasting of Copper Hill sulphides (CuFeS2 and FeS2) produces a calcine from which the copper and gold would be leached with sulphuric acid from the sulphur dioxide (SO2) exhaust gas to produce cathode copper (SX/EW) and bullion gold by CIP/CIL at maximum r

  16. Slide 16: Copper Hill Project Simplified Flowsheet

    < O O) Q =) = ‘= fe) D — ® ©) — S) UL COPPER HILL PROJECT SIMPLIFIED FLOWSHEET Sulphide Roaster Concentrate CALCINE Copper SX W Copper ml Electro- Winning Fe2Os for sale LME grade cathode copper Sulphuric Acid Gold Dore

  17. Slide 17: Copper Hill Infrastructure

    Molong 132Kv Sub-station For personal use only 4.5km Existing Railway Copper Hill Infrastructure

  18. Slide 18: Feasibility Study Has Commenced

    For personal use only FEASIBILITY STUDY HAS COMMENCED China National Automation Control Systems Corp (CACS) and Golden Cross have signed a Consultancy Agreement. WHAT’S INVOLVED? The study will cost about $5.8 million and will take approximately 18 months. THE FEASIBILITY STUDY IS CHINA-DIRECTED The

  19. Slide 19: Feasibility Study Parameters

    For personal use only FEASIBILITY STUDY PARAMETERS • Mine and Plant Capital •Mining Operating Costs • Plant and Mill Costs • Infrastructure Costs • Housing & Workforce • Power, Water and Transport • Environmental Issues • Metal Prices • Processing: Capital and Operating Costs

  20. Slide 20: Summary

    For personal use only SUMMARY • Copper Hill, 100%-owned by GCR •Robust economics at current metal prices • Positive economics at lower metal prices • New metal recovery strategy using existing technologies