Golden Cross Resources Ltd · ASX:GCR

Golden Cross Resources — Open Cut Mining 2011 Forum

44 slides from Golden Cross Resources's conference presentation, Nov 8, 2011

  1. Slide 1: Open Cut Mining 2011 Forum

    OPEN CUT MINING 2011 FORUM 7 November - 8 November 2011 Duxton Hotel , Perth, WA, Australia Kim Stanton-Cook, Managing Director

  2. Slide 2: Disclaimer

    Disclaimer This material contains certain forecasts and forward-looking information, including information about possible or assumed future performance, exploration results, resources or potential growth of Golden Cross Resources Ltd (GCR), industry growth or other trend projections. Such forecasts

  3. Slide 3: Copper Hill – Evolving Open Pit Optimisation

    Copper Hill – Evolving Open Pit Optimisation “Grade and Recovery Matter” Painting: “The Molong Copper Mine “ Watercolour by Conrad Martens c. 1845, National Library of Australia

  4. Slide 4: Golden Cross 100% owned projects map

    Darwin » Mount Isa (Cu-Au U) Highland Sherrin-Lily —\ Acie o —— 5 2 Pentland Queensland Coal Olympic Domain (cu Av) Bale ag a) Codna Hill Boonah Warriner Creek: Warwiék Brisbane Oolgelima Hill— \ Giddinna Burra (Cu Au) Koolymilka on 2 Rast (Au Cu Pb Zn Fe)_> i Cargo " ‘sydney N F (Au Cu) Adelaide 50

  5. Slide 5: Copper Hill is well located in the Central West of NSW

    Copper Hill is well located in the Central West of NSW

  6. Slide 6: Copper Hill aerial view and nearby mines

    Cadia 45 km to southeast Northparkes 80 km to northwest Molong township Wattle Hill Copper Hill Boundary Buckley’s Hill Copper Hill, aerial view looking south

  7. Slide 7: Copper Hill Project Simplified Flowsheet

    CCR 1-10 x COPPER HILL PROJECT SIMPLIFIED FLOWSHEET Electro- Winning Fe2Os for sale LME grade cathode copper i er OS — ous 5 conceit wy Acid a => Ny — w wwe SALE eS x oom ecov® y us | AS os" 985 oO xe _ nuts 7 a iu in Fe203 » er? . \\0 carey CIL \N Copper Gold Dore tl 4 | MINT GOLDEN CROSS RESOURCES

  8. Slide 8: Copper Hill total geological resource

    Copper Hill Total Geological Resource @ 0.2% copper cut-off 197 million tonnes @ 0.31% copper and 0.26 g/t gold New Resource Estimate due this month 2 million tonnes per annum mill throughput under consideration • Lower capital costs • Faster time-line to production • Reduced water & power requireme

  9. Slide 9: Optimised pit resource inside and outside shell

    ‘ The optimised pit was generated using Whittle software to maximise undiscounted cash flow using US$5.30/lb copper and US$2,120/oz gold commodity prices and recoveries of 85% for copper and 80% for gold and 45o overall pit slopes. The table above reports the resources that fall inside the pit shell

  10. Slide 10: Production Strategy Scenario with lower capital costs

    Production Strategy Scenario with lower capital costs Stage 1 10 Mt ore at 0.49% copper and 0.55g/t gold to produce 36,500 tonnes copper and 79,100 ounces gold in concentrate. 2 million tonnes per annum to mill, manageable capex, early cash flow generated, 3-year pay-back possible

  11. Slide 11: Copper Hill 10 million tonne Stage 1 Starter Pit

    Copper Hill 10 million tonne Stage 1 ‘Starter Pit’. View from the south-east

  12. Slide 12: Production Strategy Scenario with mill expansion capacity

    Production Strategy Scenario (with mill expansion capacity) Stage 2 9.7 Mt ore at 0.40% copper and 0.40 g/t gold to produce 29,200 tonnes copper and 55,900 ounces gold in concentrate. Stage 3 10.6 Mt ore at 0.32% copper and 0.32g/t gold 26,100 tonnes copper and 49,300 ounces gold in concentrate.

  13. Slide 13: Copper Hill 30 million tonne pit 3D site layout

    Copper Hill 30 million tonne pit 3D Site Layout Plan – View from the south-east

  14. Slide 14: Production Strategy Scenario expanded 6–8 Mtpa capacity

    Production Strategy Scenario expanded 6 – 8 Mtpa capacity Stage 4 72.8 Mt ore at 0.24% copper and 0.23g/t gold to produce 132,400t tonnes copper and 245,300 ounces gold in concentrate. …contingent on sustained copper and gold prices around current spot…

  15. Slide 15: Central deposit interval within reach of pit planning

    Within the central Copper Hill deposit, one interval is within reach of current pit planning with 70 metres grading 0.56% copper and 1.04 g/t gold from 25 metres. The potential 100Mt pit would capture the next interval of 174 metres grading 0.40% copper and 0.40 g/t gold from 121 metres.

  16. Slide 16: Pit optimisation assumptions, costs and parameters

    Progressive pit optimizations have been prepared using the following assumptions, costs and parameters : • March Geological and Resource model • Ore Mining and Milling rate of 2 Mtpa • 50/50 bank/spot metal (Cu at AUD$7.242/kg, Au at AUD$1214/oz) • Copper recovery of 75% (Transition & Primary), nil

  17. Slide 17: More assumptions, costs and parameters

    More assumptions, costs and parameters : • No low grade stockpiling • Con freight cost $34.00/t • Discount rate 10% • Con port costs $5/t • Moisture 10% • Shipping costs (nil) • Concentrate Treatment $106/dmt • Concentrate grade 25% Cu and • Marketing (nil) 17g/t gold • Concentrate refining USD$0.08

  18. Slide 18: Sensitivity analysis: copper and gold recoveries

    SENSITIVITY ANALYSIS Copper & Gold recoveries CASE COPPER GOLD Recovery Recovery C7I Fixed Fixed C7J Variable Fixed C7K Fixed Variable C7L Variable Variable Variable copper recoveries of: 75% at 0.3% Cu, 81.2% at 0.4% Cu, and 85.1% at 0.5% Cu. based on a constant tails grade of 0.076% Cu. Variable g

  19. Slide 19: Revised variable copper recovery assumption

    Following metallurgical testing and analysis, a revised assumption for copper recovery, one that is variable according to the ore head grade rather than fixed at 75%, was made. The suggested copper recovery formula is based on a constant tails grade of 0.076% Cu. This results in recoveries of: 75% a

  20. Slide 20: Variable gold recovery modelling

    The same approach as that used for copper for the gold recovery is now modelled. A formula based on a 0.10g/t tails grade and a residual recovery of 70.5% gives variable gold recoveries as shown below. At a gold head grade of: 0.3g/t the overall recovery is 47% at 0.4g/t it is 52.8%, and at 0.5g/t t

  21. Slide 21: Operating profit versus ore and copper grade

    110 0.6 100 + 0.55 90 80 70 | 30 Sk } 035 10 0.3 0.45 ¥ 04 OP PROFIT (% of Maximum) COPPER GRADE (%) 0 10 20 30 40 50 60 70 ORE (Mt) _._ Undis _.. BC Disc _._ WC Disc —_._ Avg Disc —o_ Cu Grade (%) The “Best Case” (BC) scenario is when the pit is developed from the inner most pit shells outwards. It

  22. Slide 22: Base Case – Pit Optimisation

    Base Case - Pit Optimisation PIT SHELLS #26 and #18 Item Pit Shell #18 | Pit Shell #26 Pit Base Level 385 350 Pit Mass (Mt) 36.592 57.454 Waste (Mt) 16.732 26.798 Total Float Ore (Mt) 19.783 30.580 Float Copper Grade (%) 0.464 0.418 Float Gold Grade (g/t) 0.491 0.434 Strip Ratio (tt) 0.846 0.876 Und

  23. Slide 23: 5m contours of pit shell C1-18

    5m CONTOURS OF PIT SHELL C1-18 (19.7Mt) 5m Contours of pit shel! C1-18 Outline of 100Me Pit DEN CROSS RESOURCES

  24. Slide 24: 5m contours of pit shell C1-26

    5m CONTOURS OF PIT SHELL C1-26 (30.SMt) || Sm Contours of pit shell C1-26 | Zt Outline of 100Mt Pit Tt tea /4 DEN CROSS RESOURCES

  25. Slide 25: 5m contours of pit shell C5-26

    5m CONTOURS OF PIT SHELL C5-26 | Sm Contours of pit shell C5-26 f ; OAT \ + Uh + #1) E y \ i Ha < + i Mi £ au i T 5 w i 7) \ Zz ‘ eS \ ; S&S oe Outline of 100Mt Pit DEN CROSS RESOURCES

  26. Slide 26: Four most recent pit optimisations

    We have considered the most recent four pit optimisations: • C7I - Base Case : Fixed copper recovery (75%) and fixed gold recovery (45%) • C7J - Variable copper recovery and fixed gold recovery (45%) • C7K - Fixed copper recovery (75%) and variable gold recovery • C7L - Variable copper and variable

  27. Slide 27: Cases C7i to C7L: % improvement in operating profits

    PIT OPTIMISATIONS Cases C7i to C7L: % improvement in operating profits

  28. Slide 28: Base Case Pit Optimisation C7i

    BASE CASE PIT OPTIMISATION ‘C7i’ Fixed copper recovery at 75% & fixed gold recovery at 45% Operating Profits and Grade 110 0.65 100 0.6 90 OP PROFIT (% of Maximum) 80 0.55 COPPER GRADE (%) 70 0.5 60 50 0.45 40 30 0.4 20 0.35 10 0 0.3 0 10 20 30 40 50 60 70 ORE (Mt) Undis BC Disc WC Disc Avg Disc Cu

  29. Slide 29: Pit Optimisation C7j

    PIT OPTIMISATION ‘C7j’ Variable copper recovery & fixed gold recovery at 45% Operating Profits & Grade 140 0.65 120 0.6 OP PROFIT (% of Maximum) 100 0.55 COPPER GRADE (%) 80 0.5 60 0.45 40 0.4 20 0.35 0 0.3 0 10 20 30 40 50 60 70 ORE (Mt) Undis BC Disc WC Disc Avg Disc Cu Grade (%)

  30. Slide 30: Pit Optimisation C7k

    PIT OPTIMISATION ‘C7k’ Fixed copper recovery at 75% & variable gold recovery Operating Profits & Grade 140 0.65 120 0.6 OP PROFIT (% of Maximum) 100 0.55 COPPER GRADE (%) 80 0.5 60 0.45 40 0.4 20 0.35 0 0.3 0 10 20 30 40 50 60 70 ORE (Mt) Undis BC Disc WC Disc Avg Disc Cu Grade (%)

  31. Slide 31: Pit Optimisation C7L

    PIT OPTIMISATION ‘C7L’ Variable copper recovery & variable gold recovery Operating Profits and Grade 160 0.6 140 0.55 OP PROFIT (% of Maximum) 120 COPPER GRADE (%) 0.5 100 0.45 80 0.4 60 0.35 40 20 0.3 0 10 20 30 40 50 60 70 ORE (Mt) Undis BC Disc WC Disc Avg Disc Cu Grade (%)

  32. Slide 32: Pit Optimisations Summary

    PIT OPTIMISATIONS - SUMMARY Cases C7i to C7L: % average discounted operating profits 90 80 OP PROFIT (% of MAXIMUM) 70 60 50 40 30 20 10 0 5 10 15 20 25 30 PIT SHELL NUMBER Case C7i Case C7j Case C7k Case C7L

  33. Slide 33: Yearly copper grades and operating profits

    GRADE (%) O55 os 0.45 04 035 03 025 YEARLY COPPER GRADES & OPERATING PROFITS HS cu Grade _. Undisc Op Profit —— Disc Op Profit OP PROFIT ($M)

  34. Slide 34: Copper and Gold The Future

    China India 0 US Germany ROW 01 03 05 07 09 13f 15f 11e 1212 Copper and Gold 14 14 36 12 The Future Electrical wiring/…

  35. Slide 35: LME Copper inventories and price

    LM E 560.0 $11,200 LME Copper Copper 480.0 ———— —S a = $9,600 eo La Soe a Inventories falling. 400.0 | | y || $8,000 . _ | | | <4 4 CRU says that in 3 320.0 : $6,400 the last few weeks cs | the bulk of copper = f | | price movements = 240.0 | | | | $4,800 have been due to z | | | | investor activity

  36. Slide 36: Copper demand forecast to grow in the long term

    Copper demand is forecast to grow in the long term, largely driven by electrical transmission infrastructure demand Major copper consumers Major uses of copper by sector (2009) Mt % 25 12 12 20 Electrical 14 wiring/ 15 electricity infrastructure 10 36 14 12 5 Electrical wiring/ electricity infrastru

  37. Slide 37: LME Copper Prices Dec 05 to Nov 11

    | 600 1 31-Dec-11 + 30-Sep-11 30-Jun-11 31-Mar-11 t 31-Dec-10 30-Sep-10 P 30-Jun-10 31-Mar-10 31-Dec-09 ; 30-Sep-09 30-Jun-09 31-Mar-09 31-Dec-08 USD/t & AUD/t 30-Sep-08 LME Copper Prices + 30-Jun-08 } 31-Mar-08 31-Dec-07 30-Sep-07 —USS/t 3mo —EURIt 3mo ——AUD/t 3 mo 30-Jun-07 31-Mar-07 31-Dec-06 30-

  38. Slide 38: Gold price Dec 05 to Nov 11

    29-Nov-11 31-Aug-11 02-Jun-11 04-Mar-11 04-Dec-10 05-Sep-10 07-Jun-10 09-Mar-10 09-Dec-09 10-Sep-09 12-Jun-09 14-Mar-09 14-Dec-08 15-Sep-08 17-Jun-08 19-Mar-08 20-Dec-07 21-Sep-07 23-Jun-07 25-Mar-07 —Gold AUD Gold EUR 25-Dec-06 26-Sep-06 28-Jun-06 30-Mar-06 30-Dec-05 800 600 400 © g 8 (Zo/$) 8914d

  39. Slide 39: Copper Hill Planning for Development

    Copper Hill Planning for Development

  40. Slide 40: Copper Hill site layout

    rhal VWwaste Dump —- Fibre Optic Ca ¥ ROM Pad a y Shades Road

  41. Slide 41: Mill & Plant Site

    SONTENT TABLE DIRTY WATER DESCRIPTION COLLECTION CRAIN PAD \ \ PARY CRUSHER AREA NS [SHER AREA [ICC 6 TRANSFORMER SN SIBIEISI Bel 9/218 = = i i HE i i “18 41314 PUARy CRUSHER Talfines THICKER ‘COCENTRATE THICKER AREA TENTRATE AREA BLGGING AREA {cess ware ‘AFRE WATER fae ware EACLE JANTHNANCE fXSHOP.

  42. Slide 42: Crushing & Comminution – Process Flow Diagram

    CRUSHING & COMMINUTION – PROCESS FLOW DIAGRAM

  43. Slide 43: Flotation – Process Flow Diagram

    FLOTATION – PROCESS FLOW DIAGRAM

  44. Slide 44: Copper Hill

    Newcrest’s Cadia 45 km to southeast Rio’s Northparkes 80 km to northwest Molong township P ow er: 132 K v Sub-station 4 km Plant & Mill Site Wattle Hill Copper Hill Low strip ratio Buckley’s Hill Copper Hill • Capex Scoping Study near com pletion • New Resource Estim ate im m inent ASX- GCR