Ellomay Capital Ltd · AMEX:ELLO

Ellomay Capital — Investor Presentation (May 2021)

29 slides from Ellomay Capital's investor presentation, May 11, 2021

  1. Slide 1: Integrated Developer, Owner and Operator of Renewable Energy Projects

    Integrated Developer, Owner and Operator of Renewable Energy Projects Investors Presentation – May 2021

  2. Slide 2: General disclaimer and forward-looking statements

    General:The information contained in this presentation is subject to, and must be read in conjunction with, all other publically available information, including our Annual Report on Form 20-F for the year ended December 31, 2020, and other filings that we make from time to time with the SEC. Any pe

  3. Slide 3: Investor Highlights

    Investor Highlights Financial and technological expertiseRenewable energy as a long term, adaptable business 3 Trusted by financial institutes and banks From development to operation Active in various markets and locations Ongoing growth with conservative leverage ratios Public company traded in TAS

  4. Slide 4: Our Vision

    Our Vision To be ahead of the curve in green energy generation and storage technologies. To be a profitable and sustainable business based on enhanced financing strategies and advanced technological expertise. To provide comprehensive solutions, from development to operation, enabling a stable suppl

  5. Slide 5: Our Objectives

    Continuous growthGrowing our renewable energy and power generation activities– from development tooperation – in Europe and Israel. Constant cash flowCreating continuous cash flow from various assets in diverse renewable energy and energy storage applications. Monetary PolicyMaintaining relatively l

  6. Slide 6: Business Development Roadmap

    Business Development Roadmap Talasol, Spain – Signed a PPA for 80% of the expected output 6 Sold 49% of Talasol 2019 2020 Talasol entered financing agreements with Deutsche Bank and EIB Commercial operation of second Biogas Project in the Netherlands Financial closing and start construction in Talas

  7. Slide 7: Financial Forecast (in million of Euro)

    Financial Forecast (in million of Euro) 2021 (E) 2022 (E) 2023 (E) 2024 (E) 7 Revenues 47-50 55-58 75-78 85-89 Adjusted EBITDA 26-27 33-34 48-50 55-58 Adjusted FFO 14-15 19-20 30-31 35-36 Net Profit 3 5-6 11 12-13 The PV Plant located in Talmei Yosef, Israel is presented under the fixed asset model

  8. Slide 8: Development Projects – Growth

    Development Projects – Growth 8 Early Stage Development 850 MW Under Advanced Development 479 MW Italy+ Spain - aggregated 850 MW PV Israel - 40 MW PV + Storage. Under / Ready for Construction 204 MW Connected to the grid 416 MW Dorad Power Station 156 MW Manara Cliff, Pumped Storage Italy - 439 MW

  9. Slide 9: Diverse Green Energy Infrastructure

    Diverse Green Energy Infrastructure Development, Construction, Operation Solar Energy | PV 9 Waste to Energy | Bio Gas Clean Energy | Natural Gas Energy Storage | Pumped Storage

  10. Slide 10: Projects Summary (EUR Millions)

    10 Projects Summary (EUR Millions) Projects %Ownership License MW Expected Distribution in 2021 Expected Annual Revenues in 2021 Expected Annual Adjusted EBITDA in 2021 Expected Adjusted Annual FFO in 2021 Expected Debt as of December 31, 2021 Expected interest on bank loans payment in 2021 Expected

  11. Slide 11: Projects Summary (EUR Millions)

    Projects Summary (EUR Millions) %Ownership License MWp/ MWp/h Expected Annual Revenues Under / Reay for Construction Spain PV 11 100% Expected production start: 2022 28 MW Israel – Manara Cliff 83.34 % Expected production start: 2026 156 MW Under Development Israel – PV + Storage 100% Expected produ

  12. Slide 12: Waste-to-Energy (Biogas) Projects

    Waste-to-Energy (Biogas) Projects 12 EUR Millions 2021 (E) 2022 (E) 2023 (E) Revenues 15 15 Cost of Sale -6.8 -6.8 Gross Margin 8.2 8.5 Opex -3.1 -3 Ebitda 4 5.1 5.3 Interest on bank loans -0.4 -0.4 -0.4 Taxes on income - - - Adjusted FFO 4.7 4.9 See Appendix C for reconciliation and disclosure rega

  13. Slide 13: Israel - Manara Cliff - Pumped storage project

    Israel - Manara Cliff- Pumped storage projectTotal storage capacity ~ 1900 MWh Expected Capacity: 156 MW Location:Manara Cliff - Israel Expected Cost:EUR 390M Ownership:Ellomay Capital Ltd. - 83.34 % AMPA Investments Ltd. - 16.66% * Plant type:1 pumped hydro storage plant Notice To Proceed (NTP):Apr

  14. Slide 14: Spain – Talasol

    Spain – Talasol * Business strategy and timeline: Acquired:2017 Capacity:300 MW Plant type:1 PV plant Starting power production: Q4/2020 Location:Talaván, Cáceres, Spain Final Cost: 227M EUR Expected Annual Revenue:EUR 23-25M June 2018: METKA –procurement and engineering agreement June 2018:PPA agre

  15. Slide 15: Talasol PV Plant

    Talasol 300 MW PV Plant Connection lines within the project Evacuation line construction 15 Grid ConnectionDecember 2020

  16. Slide 16: Framework Agreements for Development of PV Projects in Italy

    Framework Agreements for the Development of 1209, MW PV Projects in Italy Expected Capacity: Expected power production: Expected Cost: 1,209 MW 20 MW – 2021 665 MIL EUR 178 MW – 2022 261 MW – 2023 332 MW – 2024418 MW – 2025 Location:Italy Signed:2020 Plant type:Multi PV plants 16 *There may be a tra

  17. Slide 17: PV + Storage in Israel

    Tender winning date July 14, 2020 Location Israel Total installed capacity (MWh) –DC* 40 Total installed capacity (MWh, Calc.) –AC* 20 % of electricity through battery 19.7% Expected annual power production (MW) 72,771 Expected construction cost NIS 160 M Tariff (Ag) 19.90 License operation period (

  18. Slide 18: Key Balance Sheet Figures

    Key Balance Sheet Figures 18 December 31,2017 % Of BS December 31,2018 % Of BS December 31,2019 % Of BS December 31,2020 % Of BS Cash and cash equivalent, deposits and marketable securities 26,124 13% 39,014 18% 53,197 17% 76,719 17% Financial Debt* 106,515 54% 117,435 56% 164,904 53% 280,893 61% Fi

  19. Slide 19: Key Financial Ratios

    Key Financial Ratios December 31 ,2017 December 31 ,2018 December 31,2019 December 31,2020 Financial Debt to CAP * 58% 60% 61% 69% Financial Debt, net to CAP * 44% 40% 41% 50% * See Appendix B for calculations Strong Balance Sheet, Sufficient Liquidity 19

  20. Slide 20: Summary

    Summary Renewable energy industry enjoys favorable business prognosis and supportive regulation Competitive pricing, no need for governmentalsubsidizing High segmental and geographic diversity. Revenue not dependent on a specific project Long term agreements reduce demand market risk Value based fin

  21. Slide 21: Renewable Energy Market and Business Environment

    Renewable energy is an ongoing, worldwide sustainable economy trend, with an ever growing production and consumption of green energy. Renewable Energy Market and Business Environment 1.http://www.brinknews.com/eu-2020-renewable-energy-goals-on-track/2.http://appsso.eurostat.ec.europa.eu/nui/show.do?

  22. Slide 22: Israel - Renewable Energy Production Goals

    22 Israel - Renewable Energy Production Goals 5.00% 10% 20% 30% 35.00%30.00%25.00%20.00%15.00%10.00%5.00%0.00% 2025 2030 2.26%Actually produced Expected to increased to 25-30% by 2030 2020 2014

  23. Slide 23: The Photo-Voltaic Market Overview

    The Photo-Voltaic effect enables conversion of light into electricity using semiconductors. IEA:PV expected todoubleuntil 2023 The Photo-Voltaic Market Overview https://www.iea.org/renewables2018/ ©OECD/IEA Bioenergy Solar Thermal 23 Hydropower Geothermal Wind Marine Solar PV Renewable energy consum

  24. Slide 24: Waste-to-Energy Market Overview

    Waste-to-Energy Market Overview Biogas is a renewable energy source, produced by fermentation of organic matter. Expected CAGR 2018-2024 is 6%* Number of biogas plants per 1 Mio capita in European countries in 2017 28.43 30.14 31.95 33.87 35.9 38.05 40.33 2017 2018 2019 2020 2021 2022 2023 136.1 1 5

  25. Slide 25: Pumped Hydro Storage Market Overview

    The Pumped Hydro Storage method stores energy in the form of gravitational potential energy of water, pumped from a lower elevation reservoir to a higher elevation. 365/24/7Energy storage enables power delivery all day and all year round. Pumped Hydro Storage Market Overview https://www.gminsights.c

  26. Slide 26: Thank You

    THANK YOU For further Info:Ran Fridrich, CEO: ranf@ellomay.comKalia Weintraub, CFO: kaliaw@ellomay.comwww.ellomay.com

  27. Slide 27: Appendix A – Adjusted EBITDA and Adjusted FFO

    Appendix A – Adjusted EBITDA and Adjusted FFO 27 Use of NON-IFRS Financial MeasuresAdjusted EBITDA and Adjusted FFO are non-IFRS measures. EBITDA is defined as earnings before financial expenses, net, taxes, depreciation and amortization and FFO (funds from operations) is calculated by adding tax an

  28. Slide 28: Appendix B – Financial Debt calculations

    As of December31, As of December31, As of December31, As of December31, 2017 2018 2019 2020 Current liabilities Current maturities of long term bank loans € (3,103) € (5,864) € (4,138) € (10,232) Current maturities of long term loans € - € - € - € (4,021) Debentures € (4,644) € (8,758) € (26,773) €

  29. Slide 29: Appendix C – Biogas EBITDA and Adjusted FFO

    Appendix C – Biogas EBITDA and Adjusted FFO 29 Use of NON-IFRS Financial MeasuresEBITDA and Adjusted FFO are non-IFRS measures. EBITDA is defined as earnings before financial expenses, net, taxes, depreciation and amortization and FFO (funds from operations) is calculated by adding tax and financing

Ellomay Capital — Investor Presentation (May 2021) on 6ix