Slide 1: Snoball Property
Snoball Property
Slide 2: Snoball Backstory
Snoball Backstory First developed as a gold-silver prospect by Noranda in the early 1990s (soil and rock geochemistry followed by drilling at lower elevations (12 DDH for 1,500 metres)) Developed further as a prospect by Evergold 2016-2019; expanded anomaly up-slope to strong values on Pyramid P
Slide 3: Snoball Prospect Viewed North
Snoball Prospect Viewed North Pyramid Peak ~2012 metres ASL Snoball Ridge Apex drill pad 500 metre vertical elevation Red trace difference represents Pyramid Peak >150 ppb to Snoball gold-in- Pond soils & talus fines ~1500 m ASL Snoball Pond 1,000 metres
Slide 4: Pyramid Peak Close-Up
In 2020 all holes were drilled from here – the “Apex” pad. We Pyramid Peak identified the “C Zone” trend with narrow high-grade intercepts Close-Up and, further down- mountain, an area of high-grade gold, silver and pathfinder elements in rocks and soils which we targeted in a short 2021 drill progr
Slide 5: Selected 2020 Snoball Drill Results
Selected 2020 Snoball Drill Results Narrow, High-Grade Gold +/- Silver in Several Holes 11.40 g/t Au and 4.51 g/t Ag over 1.50 metres1 from 33.00 metres in hole SB20-002 12.90 g/t Au and 54.24 g/t Ag over 1.44 metres from 47.75 metres in hole SB20-005 Within 3.19 g/t Au and 28.37 g/t Ag over 9
Slide 6: High-Grade Gold-Silver in Snoball Drill Core
High-Grade Gold-Silver in Snoball Drill Core As announced in news August 18, 2020: 12.90 g/t Au and 54.24 g/t Ag over 1.44 metres from 47.75 metres in hole SB20-005 within 3.19 g/t Au and 28.37 g/t Ag over 9.62 metres from 42.00 metres
Slide 7: High Grades in Rocks Also
High Grades in Rocks Also Au Ag Sample No. (g/t) (g/t) Readers should note that grab samples CBR1604002 11.4 94.1 Photo, left: are by their nature selective, and the CBR1604003 32.5 296.0 Boulder of high- associated Au-Ag values are not CBR1604004 80.2 452.0 grade gold and necessarily silver-rich ve
Slide 8: 2021 Snoball Drill Program
2021 Snoball Drill Program 2020’s “Apex” drill pad 400 metres of core drilling completed in 4 holes