Petrofac Limited · OTC:POFCY
Petrofac — Investor Day (June 2011)
38 slides from Petrofac's investor day presentation, Jun 14, 2011

Slide 1: Capital Markets Day 14 June 2011
Capital Markets Day 14 June 2011

Slide 2: Important Notice
Important Notice • The information in this document has not been independently verified and no representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness or correctness of the information or opinions contained herein. None

Slide 3: 1. Introduction and strategy update
Ayman Asfari, Group Chief Executive 1. Introduction and strategy update

Slide 4: Agenda
Agenda 1. Introduction and strategy update Ayman Asfari, Group Chief Executive − What is our strategy for growth? 2. Integrated Energy Services − What is the market opportunity? − What is our track record? Andy Inglis, Chief Executive − How will we meet our customers‟ needs? Integrated Energy Servic

Slide 5: Our history
Our history Petrofac P Entered Turkmenistan, Iraq, Nigeria and Romania Awarded 15 year Production First US$1 billion Enhancement contract awarded contract in to E&C in Oman Romania Petrofac Signed first Petrofac listed Petrofac US$3.4 billion International RSC contract on London Emirates contract to

Slide 6: A focused and distinctive strategy
A focused and distinctive strategy Focus • A clear focus on the oil & gas sector • Prioritising resource-rich geographies Differentiation • World-class competency delivered locally • A preference for organic growth with “bolt-on” acquisitions to build our capability and geographic presence • Ultimat

Slide 7: Leveraging capability
Leveraging capability Net income per employee 2010 US$‟000 CAGR 06-10 Outsourcing 3 7% Companies 1 Engineering 16 10% Services/ EPC 2 Oil Field Services 3 24 (15%) Petrofac 4 34 10 44 21% IT Consultants5 40 0% Financial Services 6 88 (14%) UK Law Firms7 >170 N/A Upstream IOC 8 >550 (4%) Note: Based

Slide 8: Results to date
Results to date • Strong earnings growth has led to sector-leading total shareholder returns Revenue 4,354 TSR change since PFC IPO (October 2005) 6 yr CAGR 24% 3,655 3,330 Petrofac Ltd. 737% 2,440 AMEC PLC 253% 1,864 John Wood Group PLC 226% 1485 WorleyParsons Ltd. 223% Saipem S.p.A. 184% Tecnicas

Slide 9: What is our strategy for growth?
What is our strategy for growth? Key priorities for growth Geographical • Expand existing business into new geographies expansion • e.g. Iraq, Turkmenistan, West Africa Offshore • Develop our EPC business offshore Integrated • Implement our integrated services strategy Energy Services • Continue to

Slide 10: Integrated Energy Services
Integrated Energy Services Reward Integrated Energy Services Engineering, Procurement & Construction, Operations & Maintenance Production Sharing Contracts Production Enhancement Risk Services Contracts Lump-sum turnkey Cost plus KPIs Contracts services Reim Contract risk 9

Slide 11: Organisation
Organisation Reporting Business Segments Units Engineering & Construction Sharjah Engineering & Construction Engineering & • We will deliver integrated services Construction through Integrated Energy Ventures Services Offshore Offshore Engineering & Engineering & Integrated • Integrated Energy Servi

Slide 12: Growth potential
Growth potential Over our 5 year planning horizon, we anticipate that: • Engineering & Construction and Offshore Engineering & Operations will deliver double-digit earnings growth • Integrated Energy Services will be the part of our business growing most quickly and will represent an increasing prop

Slide 13: 2. Integrated Energy Services
Andy Inglis, Chief Executive IES 2. Integrated Energy Services

Slide 14: NOCs will drive global oil production capacity growth
NOCs will drive global oil production capacity growth IEA Projections of World Oil Production by Company Type NOC Supply trends 100 70 A Giant fields in decline 80 65 mm bpd 60 Percent 60 40 B Increasing complexity of new supply sources 20 55 0 50 2009 2020 2030 C Average development/ discovery size

Slide 15: Distinct market segments by field size and complexity
Distinct market segments by field size and complexity Reserve split by field size/complexity in NOC controlled countries1 total reserve volume ~ 2,200bn boe NOC NOC/IOC Giant > 500mm boe Field size Large 200 - 500mm boe Medium 50 - 200mm boe Small 25 - 50mm boe IES Low Medium High Technical complexi

Slide 16: Petrofac addressable market: around 2,400 fields
Petrofac addressable market: around 2,400 fields Reserve split by field size/complexity in NOC controlled countries1 Number, total fields ~4,500 Giant > 500mm boe e.g. Ticleni Field size Berantai Large Cendor 200 - 500mm boe Medium 50 - 200mm boe e.g. Chergui Small 25 - 50mm boe IES Low Medium High

Slide 17: Accelerating trend towards service contract structures
Accelerating trend towards service contract structures Percentage of oil & gas production in NOC Number of countries with service-based countries under service contracts1 contracts c. 2 4 c. 11 10 11 4 4 0.1 0.1 3 1990 2000 2010 2020E 1990 2000 2010 2020E Countries exploring service contracts Countr

Slide 18: What is our track record for integrated service delivery?
What is our track record for integrated service delivery? 2011 – Signed Berantai Risk Service Contract, Offshore Malaysia 2010 – Signed Ticleni Production Enhancement Contract, Romania 2007 – Acquired interest in Chergui gas field, Tunisia 2010 – EnQuest formed 2007 – Entered following Dons service

Slide 19: Building our integrated service capability
Building our integrated service capability Production engineering Well Well management management Training Training Training Brownfield Brownfield Brownfield engineering engineering engineering Maintenance Maintenance Maintenance Maintenance Operations Operations Operations Operations Asset Asset As

Slide 20: How will we meet our customers' needs?
How will we meet our customers’ needs? Production Sharing Production Risk Service Contract Contract (PSC) Enhancement (RSC) Contract (PEC) Business concept Field development/ Mature field Build, operate, transfer operation management How we add value Innovative concept Increased production

Slide 21: Cendor, Malaysia
Cendor, Malaysia • We entered the Cendor PSC at the development phase of the project in 2004 • We have added value through a fast-track, cost-effective early production scheme that de-risked the Cendor fault block reservoir • The permanent development scheme for the Cendor fault block (Cendor ph2) i

Slide 22: Ticleni, Romania
Ticleni, Romania • We have a 15 year PEC to manage the Ticleni and satellite fields in Romania • We are applying our subsurface capability to grow production: – optimising pump settings – well workovers – bringing broken wells back on line – waterflood programme • Our interests are aligned as we are

Slide 23: Berantai, Malaysia
Berantai, Malaysia • With local partners Kencana and Sapura, we are leading the US$1 billion+ development of the Berantai field and will then operate it for 7 years • We add value through our innovative concept selection and fast-track/cost-effective project execution • Our RSC aligns our interests

Slide 24: Where is the future opportunity?
Where is the future opportunity? Key Caspian Greenfield North Sea Brownfield East Europe SE Asia Mexico Middle East and North Africa Nigeria • There is significant resource potential Focus on areas • There are recurring opportunities where • We have relationships and capability to deliver locally 23

Slide 25: How will we organise to manage risk?
How will we organise to manage risk? Chief Executive, Integrated Energy Services Andy Inglis Delivery teams Support teams Legal & Commercial • Strategic discipline Developments Rob Jewkes Jeanne-Marie de Larrazabal • Rigour of capital allocation Production Solutions Finance Gordon East Carl Thompson

Slide 26: What will be the shape of Integrated Energy Services?
What will be the shape of Integrated Energy Services? Over our 5 year planning horizon, we expect that • An increasing proportion of IES long-term cash flows and earnings will come from RSCs and PECs • PSC contracts will become a minority of the IES portfolio (predominantly existing Cendor and Cherg

Slide 27: 3. Integrated Energy Services financial impacts
Keith Roberts, Chief Financial Officer 3. Integrated Energy Services financial impacts

Slide 28: How do we account for IES contracts?
How do we account for IES contracts? • How we account for IES contracts will depend on whether the contract is a Production Sharing Contract or a contract for services 27

Slide 29: How do we account for IES contracts?
How do we account for IES contracts? What defines the contract type? Production Sharing Pure Service Contract Contract High/medium1 Exploration risk None/ Low High Development cost risk Low / Medium2 High/medium1 Reservoir risk None/ Low Medium Commodity price risk None/ Low Cost and profit oil Reve

Slide 30: How do we account for IES contracts?
How do we account for IES contracts? • Risk Service Contracts and Production Enhancement Contracts fall somewhere on the spectrum between contracts for services and Production Sharing Contracts 29

Slide 31: How do we account for IES contracts?
How do we account for IES contracts? What defines the contract type? • Contracts fall into two broad categories with the following commercial characteristics: Production Enhancement Contracts Risk Service Contracts • We are responsible for providing at risk investment • We develop the asset on behal

Slide 32: What will the IES earnings profile look like? Ticleni
What will the IES earnings profile look like? Ticleni • Capex, opex and return recovered through a tariff mechanism, including a higher tariff for above baseline production • Returns are potentially wide-ranging depending on performance: material upside achievable through incremental production • Co

Slide 33: What will the IES earnings profile look like? Berantai
What will the IES earnings profile look like? Berantai • Remunerated based upon delivery of services (higher revenues in development phase) • Revenues and margins will depend upon project execution/operational performance, and will reflect confidence in delivery as project progresses • Significant c

Slide 34: How will we finance the IES growth plan?
How will we finance the IES growth plan? • Currently envisage gross investment of between US$0.5 - 1.0 billion per year into IES • Projects are typically either fast-track developments (time frame of 1 – 3 years) or already producing (PEC contracts) so net investment is considerably less • This leve

Slide 35: What will the IES earnings profile look like?
What will the IES earnings profile look like? As the characteristics of the business and the embedded portfolio risk changes... PED IES Oil price risk Subsurface risk Capital intensity Income sustainability ...so too will the earnings profile of Integrated Energy Services 34

Slide 36: Summary and closing remarks
Summary and closing remarks Our strategy meets the growing needs of our customers for an integrated service The market opportunity is significant - enabling us to deliver repeatable long-term cash flows, revenues and profits from the provision of integrated services Continued commitment to our onsho

Slide 37: Question & answer session
Petrofac P & answer session ion >F = er S WAL "BVA 7 Quest

Slide 38: Contact Information
Contact Information: ir@petrofac.com 020 7811 4900
Source: Internet Archive copy of petrofac.com
More decks from Petrofac Limited
Investor Presentation (2025)22 slides · Aug 15, 2025
H1 2024 Earnings Presentation25 slides · Sep 30, 2024
FY2023 Earnings Presentation29 slides · May 31, 2024
H1 2023 Earnings Presentation27 slides · Aug 10, 2023
FY2022 Earnings Presentation33 slides · Apr 27, 2023
Investor Presentation (2023)20 slides · 2023