Lundin Mining Corporation · TSX:LUN

Lundin Mining — Investor Presentation (November 2016)

34 slides from Lundin Mining's investor presentation, November 2016

  1. Slide 1: Corporate Update November 2016

    TSX: LUN OMX: LUMI Corporate Update November 2016

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance Measures This presentation contains forward-looking information, including, but not limited to, guidance on estimated annual production and cash costs. This forward-looking information is not based on histor

  3. Slide 3: Lundin Mining

    Lundin Mining High Quality Competitive Mines • Positive operating cash flows at all mines despite a low commodity price environment Meaningful Production Scale/Growth • Internal growth projects and exploration upside at all mines Conservative Balance Sheet • Cash on hand of $691 million • $350 milli

  4. Slide 4: Globally Diversified Portfolio

    Globally Diversified Portfolio Zinkgruvan Freeport Cobalt1 Zinc-Lead-Copper Cobalt Refinery (Sweden) (Finland) Eagle Nickel-Copper (USA) Neves-Corvo Copper-Zinc (Portugal) Tenke Fungurume1 Copper-Cobalt (DRC) Candelaria2 Copper-Gold-Silver (Chile) • Operations: 6 underground mines and 1 large open p

  5. Slide 5: YTD 2016 Operating Highlights

    YTD 2016 Operating Highlights  Positioned to meet or exceed guidance on strong aggregate operating performance  All mines continue to generate operating cash flow despite low commodity prices • Candelaria copper production guidance raised to reflect year-to- Copper date performance/production expe

  6. Slide 6: YTD 2016 Revenue Breakdown

    YTD 2016 Revenue Breakdown • Majority of sales were from Candelaria with good contribution from each of Neves-Corvo, Eagle and Zinkgruvan • 65% of sales derived from copper; increasing contribution from zinc revenues YTD Sales Breakdown by Mine YTD Sales Breakdown by Metal Zinkgruvan Lead Other 3% 3

  7. Slide 7: Balance Sheet Strength and Flexibility

    Balance Sheet Strength and Flexibility • Net debt position improved by $133M during 2016 to $309M • Cash position YTD increased by $135M to $691M • $350M revolving credit facility amended at lower borrowing costs and extended to June 2020 Liquidity Position (Sep. 30, 2016) Cash and Cash Equivalents

  8. Slide 8: 2016 Capital Expenditure and Exploration Guidance

    2016 Capital Expenditure and Exploration Guidance Focus on disciplined capital investment and financial flexibility in light of the commodity price environment Capital Expenditures1 (US$M) 2016 • Capital expenditures for 2016 decreased by $25M (from Total Capitalized Stripping2 35 original $220M out

  9. Slide 9: 2016 Production and Cash Cost Guidance

    2016 Production and Cash Cost Guidance Metal and Mines Production (Tonnes)1 C1 Cash Costs2 Candelaria (80%) 130,000 – 132,000 $1.35/lb Eagle 22,000 – 24,000 Neves-Corvo 48,000 – 51,000 $1.55/lb Copper Zinkgruvan 1,900 – 2,000 Tenke (@24%) 52,800 $1.26/lb Total attributable 254,700 – 261,800 Nickel E

  10. Slide 10: Operational Overview and Outlook

    Operational Overview and Outlook Eagle (100%) Neves-Corvo (100%) Candelaria (80%) Zinkgruvan (100%) Tenke Fungurume (24%) 10

  11. Slide 11: Candelaria (Cu/Au/Ag), Chile

    Candelaria (Cu/Au/Ag), Chile Atacama Province, Region III, approximately 20 km south of Copiapó 11

  12. Slide 12: Candelaria Results and Outlook

    Candelaria Results and Outlook Location Chile • YTD copper production of 117.5 kt (100%) and Ownership 80% cash costs of $1.28/lb 2016 Production 130,000-132,000 t Cu • Los Diques Tailings Project progressing on Guidance (80%) schedule, trending under budget 2016 Cost Guidance $1.35/lb Cu Expected M

  13. Slide 13: Candelaria Complex LOM Copper Production Profile

    Candelaria Complex LOM Copper Production Profile1 200 180 174 161 163 165 154 156 145 146 160 144 123 140 125 115 125 120 110 112 97 100 KT 80 60 60 40 20 0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 Cu (kt) - New Cu (kt) - Old • Profile reflects September 2

  14. Slide 14: Los Diques Project Construction

    Los Diques Project Construction • As of October 5, 2016 – Excavation of Underdrains Progress 14

  15. Slide 15: Eagle Mine (Ni/Cu), Michigan, U.S.A.

    Eagle Mine (Ni/Cu), Michigan, U.S.A. 50 km northwest of Marquette in the Upper Peninsula of Michigan 15

  16. Slide 16: Eagle Results and Outlook

    Eagle Results and Outlook • YTD production of 18.9 kt Ni and 17.7 kt Cu Location Michigan, USA Ownership 100% • Cash cost of $1.85/lb YTD, lower than 2016 23,000–25,000 t Ni $2.01/lb comparable period in 2015 Production Guidance 22,000–24,000 t Cu • Eagle East Feasibility Study on schedule for 2016

  17. Slide 17: Eagle East – Potential Meaningful Addition to Profile

    Eagle East – Potential Meaningful Addition to Profile • Preliminary Economic Assessment on Eagle East completed in June 2016* Nickel Production Copper Production 25 25 20 20 15 15 KT KT 10 10 5 5 0 0 2016 2017 2018 2019 2020 2021 2022 2023 2016 2017 2018 2019 2020 2021 2022 2023 Year Year Eagle Eagl

  18. Slide 18: Neves-Corvo (Cu/Zn), Portugal

    Neves-Corvo (Cu/Zn), Portugal Situated 220 km southeast of Lisbon 18

  19. Slide 19: Neves-Corvo Results and Outlook

    Neves-Corvo Results and Outlook • Zinc production of 53.6 kt YTD. Excellent Location Portugal recoveries on improvements in zinc plant Ownership 100% operation 2016 Production 48,000–51,000 t Cu Guidance 70,000–73,000 t Zn • YTD copper production of 35.6 kt impacted 2016 Cost Guidance $1.55/lb Cu by

  20. Slide 20: Zinkgruvan (Zn/Pb/Cu), Sweden

    Zinkgruvan (Zn/Pb/Cu), Sweden Situated 200 km southwest of Stockholm 20

  21. Slide 21: Zinkgruvan Results and Outlook

    Zinkgruvan Results and Outlook • Zinc production of 58.8 kt YTD Location Sweden Ownership 100% • YTD cash costs of $0.37/lb Zn lower than 2016 Production 80,000–85,000 t Zn corresponding period in 2015 Guidance 1,900-2,000 t Cu 2016 Cost Guidance $0.40/lb Zn • 1350 Zinc Expansion Project on schedule

  22. Slide 22: Tenke Fungurume (Cu/Co), DRC

    Tenke Fungurume (Cu/Co), DRC Situated 175 km northwest of Lubumbashi 22

  23. Slide 23: Tenke Results and Outlook

    Tenke Results and Outlook • Copper production of 161.7 kt (100%) YTD. Location Democratic Republic of Congo Record copper production in Q3 2016 Ownership 24% 2016 Production Guidance 52,800 t Cu • Cobalt production of 12.7 kt (100%) YTD (attributable share) on plan. 2016 Costs1 $1.26/lb Cu Expected

  24. Slide 24: Lundin Mining Well Positioned in Any Market

    Lundin Mining Well Positioned in Any Market Diversified Base Metal Producer High Quality Competitive Mines Meaningful Production Scale Strong Cash Flow and Margins Conservative Balance Sheet 24

  25. Slide 25: Appendices

    TSX: LUN OMX: LUMI Appendices

  26. Slide 26: Production Outlook 2016-2018

    Production Outlook 2016-2018 Attributable Production Outlook 2016 – 20181 (contained tonnes) 2016 2017 2018 Candelaria (80%) 130,000 – 132,000 120,000 – 125,000 113,000 – 120,000 Eagle 22,000 – 24,000 17,000 – 20,000 14,000 – 17,000 Copper Neves-Corvo 48,000 – 51,000 50,000 – 55,000 50,000 – 55,000

  27. Slide 27: Candelaria Integrated Mining Complex

    Candelaria Integrated Mining Complex Alcaparrosa • Successful operating Tierra Amarilla Mine track record • Large prospective Santos Mine regional mineral property position Candelaria near mine Norte Ojos-Plant PAC • Opportunity to continue to extend Candelaria Open Pit mine life with Magnetite Plan

  28. Slide 28: Eagle Mine and Eagle East Deposit Overviews

    Eagle Mine and Eagle East Deposit Overviews Grade Ni Grade Cu Contained Ni Contained Cu K Tonnes (%) (%) (kt) (kt) Eagle P&P 3,717 2.5 2.2 95 82 M&I 3,671 3.3 2.7 119 99 Inferred 44 1.1 1.1 0.5 0.5 Eagle East Inferred 1,180 5.1 4.3 61 51 28

  29. Slide 29: Eagle East Update

    Eagle East Update • Feasibility Study targeted for completion by year end 2016 • Development ramp commenced on July 12, 2016 29

  30. Slide 30: Neves-Corvo Site Overview

    Neves-Corvo Site Overview Grade Contained Grade Contained Copper K Tonnes (%) (k tonnes) Zinc K Tonnes (%) (k tonnes) P&P 26,139 2.7 694 P&P 23,449 7.2 1,678 M&I 69,986 2.7 1,857 M&I 106,819 6.1 6,527 Inferred 12,758 1.7 222 Inferred 11,386 4.4 499 30

  31. Slide 31: Zinkgruvan Site Overview

    Zinkgruvan Site Overview Grade Zn Grade Pb Contained Zn Contained Pb K Tonnes (%) (%) (k tonnes) (k tonnes) P&P 10,770 8.0 3.3 861 354 M&I 16,090 9.4 3.9 1,511 627 Inferred 7,862 8.3 3.6 653 283 31

  32. Slide 32: Tenke Fungurume Site Overview

    Tenke Fungurume Site Overview Grade Cu Grade Co Contained Cu Contained Co (100% Basis) K Tonnes (%) (%) (k tonnes) (k tonnes) P&P 144,362 2.6 0.4 3,760 510 M&I 680,341 2.5 0.3 16,857 1,832 Inferred 531,651 2.2 0.2 11,594 1,291 32

  33. Slide 33: NI 43-101 Compliance

    NI 43-101 Compliance Unless otherwise indicated, Lundin Mining Corporation has prepared the technical information in this presentation (“Technical Information”) based on information contained in the technical reports and news releases (collectively the “Disclosure Documents”) available under Lundin

  34. Slide 34: Thank You

    TSX: LUN OMX: LUMI Thank You