Flex Ltd. · NASDAQ:FLEX
Flex — Axiom Solutions International — Investor Day (November 2026)
67 slides from Flex's investor day presentation, Nov 10, 2026

Slide 1: Power for the Next Moment
POWER FOR THE NEXT MOMENT INNOVATION DAY // NOVEMBER 10, 2026 // AUSTIN, TEXAS

Slide 2: Today's Agenda
TODAY’S AGENDA INTRODUCING FROM DIRT WINNING ACROSS UNLOCKING THE CLOSING REMARKS AXIOM TO TOKENS THE ARCHITECTURE POWER STORY Chris Butler Revathi Advaithi Chief Technology & Rob Campbell Kevin Krumm Revathi Advaithi Chief Executive Officer Strategy Officer Chief Commercial Officer Chief Financial

Slide 3: Cautionary Statement Regarding Forward-Looking Statements and Non-GAAP Disclosures
Cautionary Statement Regarding Forward -Looking Statements and Non -GAAP Disclosures This presentation contains forward -looking statements within the meaning of Section 27A of the Securities Act of 1933, as amende d, and Section 21E of the Securities Exchange Act of 1934, as amended. Words such as

Slide 4: Introducing Axiom
SECTION 01 Introducing Axiom Revathi Advaithi Expected Chief Executive Officer

Slide 5: Axiom at a glance
Axiom at a glance REVENUE (CY26E) R&D + SERVICE MANUFACTURING END TO END PORTFOLIO LOCATIONS LOCATIONS ~$10B 8 19 EMPLOYEES ENGINEERS GLOBAL SCALE & POWER REACH COOLING COMPUTE ~35K ~5K ~11M ft² SERVICES 5

Slide 6: A generational investment in infrastructure
A generational investment in infrastructure AI is bringing the digital and industrial worlds together. A MULTIYEAR AI POWER REQUIRED BY AI GRID INVESTMENT PLANNED INVESTMENT CYCLE 200+ $1T+ GW $1.4T Estimated average annual New power to be added for data US utility investment, 2026 to hyperscaler ca

Slide 7: A new era of infrastructure demands a new approach
A new era of infrastructure demands a new approach THE NEW ERA OF DIGITAL THE TRADITIONAL MODEL AXIOM WAS BUILT TO AND ELECTRICAL WILL NOT SCALE LEAD IN THIS NEW ERA INFRASTRUCTURE ▪ The traditional industrial model ▪ We built Axiom to bring the digital ▪ AI is driving a step -change in the was buil

Slide 8: A portfolio built for the new infrastructure model
A portfolio built for the new infrastructure model Leading capabilities across the full power, cooling and compute system 2017 Board power First rack level power 2nd hyperscale compute Added direct to chip Expanded capabilities acquired programs for / rack program ramps liquid cooling utility from E

Slide 9: A distinctive set of products engineered to work together
A distinctive set of products engineered to work together POWER CONVERSION PRODUCTS Inverters M Rack M System (Agile 800R) CRITICAL POWER PRODUCTS LV/MV Switchgear PDUs RPPs Busway Modular Utility Metering RACK & CHIP LEVEL POWER PRODUCTS Power modules Vertical power CBU Power shelf 800V sidecar COM

Slide 10: Axiom can shape and deliver the system as one
Axiom can shape and deliver the system as one Power, Cooling, and Compute capabilities spanning utility interface through the AI workload We design the architecture, not just the products POWER CONVERSION Optimize the system, not just individual components EMBEDDED POWER We remove complexity from th

Slide 11: Built on world-class manufacturing DNA, designed for the AI era
Built on world -class manufacturing DNA, designed for the AI era Axiom combines the portfolio and technology required for the new infrastructure model with manufacturing scale and an AI -native operating system AI -NATIVE OPERATING MODEL ACROSS THE ENTERPRISE INTELLIGENT SYSTEMS REAL - TIME VISIBILI

Slide 12: Axiom is fundamentally different from its peers
Axiom is fundamentally different from its peers WHAT MAKES IT HARDWARE INTEGRATORS AXIOM DIFFERENT Integrate compute at scale, with limited Designs, manufactures and integrates proprietary power or thermal product IP power, cooling and compute as one Purpose -built for the new system, across the ele

Slide 13: Shaping infrastructure with our customers from utility to silicon
Shaping infrastructure with our customers from utility to silicon UTILITIES COLOCATION HYPERSCALERS SILICON PROVIDERS Grid interconnection, Critical power distribution Integrated power, cooling Co -development of next - substation and utility and modular power and compute systems to generation power

Slide 14: Leadership matched for the opportunity ahead
Leadership matched for the opportunity ahead Significant industry experience with track record of results YEARS AT YEARS AT YEARS AT YEARS AT YEARS AT 7 FLEX 2 FLEX 11 FLEX 9 FLEX 1 FLEX INDUSTRY INDUSTRY INDUSTRY INDUSTRY INDUSTRY 35 YEARS 30 YEARS 40 YEARS 15 YEARS 25 YEARS Prior Experience Prior

Slide 15: From Dirt to Tokens
SECTION 02 From Dirt to Tokens Chris Butler Expected Chief Technology & Strategy Officer

Slide 16: AI is power-limited and the fastest from megawatts to tokens wins
AI is power -limited and the fastest from megawatts to tokens wins EFFICIENCY More compute from every megawatt the grid delivers. SIMPLIFICATION Fewer conversion stages, vendors and handoffs from grid to token. SPEED Capacity online in up to half the time. 16

Slide 17: AI presents new customer challenges
AI presents new customer challenges INCREASING RACK DENSITY Industry focused efforts towards 800V and liquid c ooling POWER AVAILABILITY Poor efficiency and long waits for interconnection INCREASING COMPLEXITY Density challenge is adding complexity LABOR CONSTRAINTS Shortage of skilled onsite resour

Slide 18: AI presents new customer challenges
AI presents new customer challenges INCREASING RACK DENSITY Industry focused efforts 800V and Liquid Cooling EFFICIENCY POWER AVAILABILITY Poor efficiency and long waits for interconnection SIMPLIFICATION INCREASING COMPLEXITY SPEED Density challenge is adding complexity LABOR CONSTRAINTS Shortage o

Slide 19: 100+ years of AC. 3-5 years to DC.
100+ years of AC. 3 –5 years to DC. A century spent refining one architecture. AI is forcing a reset in a single product cycle. 1880s – 1900s 1920s – 1950s 1960s – 1980s 1980s – 2000s 1990s – 2010s 2010s – TODAY AC NETWORKS GRID SCADA AND SOLID -STATE UPS AND SMARTER AND SUBSTATIONS EXPANSION AUTOMA

Slide 20: Incumbents protect the past. Axiom ships what's next
Incumbents protect the past. Axiom ships what’s next INDUSTRIAL INCUMBENTS The legacy AC playbook 800VDC -native, built for speed AC -centric portfolios: UPS, PDU and power 800VDC -native: agile digital rectifier, ARCHITECTURE racks — the very boxes 800VDC removes grid -forming SST, integrated backu

Slide 21: The value of efficiency, speed, and simplification
The value of efficiency, speed, and simplification ~ $20 – $30B ~ $1.5– $2.5B compute lease revenue potential per GW / year of potential revenue lost per GW for every month of delay ~ $12 – $15B < 1 year to build the power and cooling infrastructure for 1 GW of potential revenue pays it back, so pay

Slide 22: One grid to token platform
One grid to token platform MV AND LV SWITCHGEAR BUSWAY AND DATABAR AGILE AND GRID - FORMING BESS LIFECYCLE SERVICES PDUs AND RPPs PREFAB PODS AND SKIDS 800V DIGITAL RECTIFIERS SST (ROADMAP) ▪ Logistics and fulfillment ▪ Repair and refurbishment 01 CRITICAL POWER 02 POWER CONVERSION ▪ Remote monitori

Slide 23: Critical power, set and connected on site
Critical power, set and connected on site MV & LV Busway & switchgear databar PDU & RPP Modular Protection and distribution Power and data run overhead Branch distribution and remote Utility control buildings and from the utility feed to the to every row power panels at the row power pods, built and

Slide 24: Facility power conversion, built in-house
Facility power conversion, built in -house Grid - forming BESS M - Rack Agile 800R ■ Next -gen ready Sets voltage and frequency and absorbs AI Liquid -cooled, modular grid -forming Digital rectifier with agile backup: 34.5 kV in, load swings in milliseconds inverter: SiC, >99% efficient, 5 –7.5 MW 8

Slide 25: Few players control power inside the rack
Few players control power inside the rack Power Power Sidecar shelf BBU CBU module ■ Leading player 800 VDC or ± 400 VDC 50 V rack distribution: Battery backup units on Capacitive storage that Board -level DC/DC and beside the rack, feeding 33 kW shelves at 97.5% the 50 V bus for ride - smooths AI l

Slide 26: Cloud and cooling, commissioned before it ships
Cloud and cooling, commissioned before it ships Compute Fluid network CDU Cold Plate Integrated manufacturing: Facility -to-rack liquid Coolant distribution units Direct -to-chip cooling at the built, commissioned, piped, distribution, supply and return moving heat from rack to processor ■ Token -re

Slide 27: One grid to token platform
One grid to token platform MV AND LV SWITCHGEAR BUSWAY AND DATABAR AGILE AND GRID - FORMING BESS LIFECYCLE SERVICES PDUs AND RPPs PREFAB PODS AND SKIDS 800V DIGITAL RECTIFIERS SST (ROADMAP) ▪ Logistics and fulfillment ▪ Repair and refurbishment 01 CRITICAL POWER 02 POWER CONVERSION ▪ Remote monitori

Slide 28: One system, one owner, tuned for efficiency
One system, one owner, tuned for efficiency OUR PORTFOLIO CUSTOMER VALUE Power conversion EFFICIENCY MV · GRID - FORMING · 800VDC 80 MW+ unlocked per GW Power distribution AXIOM SYSTEM DESIGN SWITCHGEAR · BUSWAY · PDUS System efficiency SIMPLIFICATION Rack and board power at the core, everything des

Slide 29: Today's power architecture, grid to token
Today’s power architecture, grid to token Grid Chip Facility power train (AC) IT rack PSU Power shelf 480 →50 V MV switchgear Transformer LV switchgear UPS PDU Busway BBU BBU battery ride -through CBU CBU capacitive load smoothing Inside the server 13.8 –34.5 kV AC 480 VAC IBC VRM GPU 50 →12 V 12→0.

Slide 30: Small losses at every stage add up to 20%
Small losses at every stage add up to 20% Grid Chip IT rack Facility power train (AC) PSU Power shelf 480 →50 V 97.5% MV switchgear Transformer LV switchgear UPS PDU Busway BBU BBU battery ride -through 99.9% 98.5% 99.8% 96.0% 98.0% 99.6% CBU CBU capacitive load smoothing Inside the server 13.8 –34.

Slide 31: Most players own only a slice of the chain
Most players own only a slice of the chain Grid Chip Facility power train (AC) IT rack PSU Power shelf 480 →50 V MV switchgear Transformer LV switchgear UPS PDU Busway BBU BBU battery ride -through CBU CBU capacitive load smoothing Inside the server 13.8 –34.5 kV AC 480 VAC IBC VRM GPU 50 →12 V 12→0

Slide 32: What the next architecture needs
What the next architecture needs Grid Chip Facility power train (AC) IT rack PSU Power shelf 480 →50 V MV switchgear Transformer LV switchgear UPS PDU Busway BBU BBU battery ride -through CBU CBU capacitive load smoothing Inside the server 13.8 –34.5 kV AC 480 VAC IBC VRM GPU 50 →12 V 12→0.6 V 0.6 V

Slide 33: A bridge step for today's VAC racks
A bridge step for today’s 480 VAC racks EFFICIENCY SIMPLIFICATION SPEED Axiom Agile 480 consolidates medium -voltage conversion and backup ahead of existing LV distribution Grid Chip TODAY ~92 % PSU BBU IBC VRM 480 → 50V CBU 50 →12V 12→0.6V to the rack MV switchgear Transformer LV switchgear UPS PDU

Slide 34: One fault took >3GW off the grid
One fault took >3GW off the grid Integrating the UPS into energy storage eliminates a top utility concern: sudden load drops. ILLUSTRATIVE VOLTAGE RESPONSE Milliseconds A single transmission fault >3GW Of data -center load switched to backup at the same moment >10min Of voltage disturbance, felt acr

Slide 35: Grid-forming creates the grid
Grid -forming creates the grid A grid -forming inverter establishes and regulates AC voltage and frequency, so generation and loads can synchronize to it, rather than simply following the grid. Traditional Grid -forming grid -following ▪ Requires an existing voltage and frequency reference ▪ Creates

Slide 36: A bridge step for today's VAC racks
A bridge step for today’s 480 VAC racks EFFICIENCY SIMPLIFICATION SPEED Axiom Agile 480 consolidates medium -voltage conversion and backup ahead of existing LV distribution TODAY ~92 % PSU BBU IBC VRM 480 → 50V CBU 50 →12V 12→0.6V to the rack MV switchgear Transformer LV switchgear UPS PDU Busway 6

Slide 37: One system replaces the AC power chain
One system replaces the AC power chain EFFICIENCY SIMPLIFICATION SPEED Agile 800R: centralized conversion and backup at 97% efficiency Grid Chip TODAY ~92 % PSU BBU IBC VRM 480 → 50V CBU 50 →12V 12→0.6V to the rack MV switchgear Transformer LV switchgear UPS PDU Busway 6 stages to the rack 480VAC IT

Slide 38: One system replaces the AC power chain
One system replaces the AC power chain EFFICIENCY SIMPLIFICATION SPEED Agile 800R: centralized conversion and backup at 97% efficiency Grid Chip TODAY ~92 % PSU BBU IBC VRM 480 → 50V CBU 50 →12V 12→0.6V to the rack MV switchgear Transformer LV switchgear UPS PDU Busway 6 stages to the rack 480VAC IT

Slide 39: Transition to solid-state transformers
Transition to solid -state transformers EFFICIENCY SIMPLIFICATION Next -gen efficiency, compact footprint, integrated protection and control Grid Chip TODAY ~92 % PSU BBU IBC VRM 480 → 50V CBU 50 →12V 12→0.6V to the rack MV switchgear Transformer LV switchgear UPS PDU Busway 6 stages to the rack 480

Slide 40: Improving efficiency in the rack
Improving efficiency in the rack Transition to 800V native servers and compute IT rack 800V Server PSU Power shelf 480 →50 V BBU BBU battery ride -through 800V PDB CBU CBU capacitive load smoothing VRM 800 →12V 12→0.6V Replaces PSU, BBU, and IBC Inside the server IBC VRM GPU 50 →12 V 12→0.6 V 0.6 V

Slide 41: Improving efficiency in the rack
Improving efficiency in the rack Transition to 800V native servers and compute FIVE EFFICIENCY LEVERS IT rack ■ Regulation Allows fixed ratio converters @ 98% Regulate once, upstream. PSU Power shelf 480 →50 V ■ Isolation Isolate at one point only. Isolating twice costs 1 -2 points. BBU BBU battery

Slide 42: Improving efficiency in the rack: 800V native servers and compute
Improving efficiency in the rack EFFICIENCY 800V native servers and compute TRADITIONAL THE STAGE THAT REPLACES IT 480VAC TO THE RACK 800V POWER DISTRIBUTION BOARD 85.7% 480VAC 95% 50VDC 97% 12V 93% 0.8V AXIOM 800VDC TO THE RACK 90.2% 800VDC Removed 97% 12V 93% 0.8V +4 pts 800VDC in, 12V out. Hot sw

Slide 43: Improved efficiency and simplified architecture deliver real results
Improved efficiency and s implified EFFICIENCY SIMPLIFICATION SPEED architecture deliver real results Grid to rack Rack to chip Total, grid -to-chip × = 98%+ to the rack, from ~92% today 90% rack to chip, from 85.7% today 88% grid -to-chip, from ~80% today more revenue potential per GW per year for

Slide 44: Long track record in modular power
EFFICIENCY SIMPLIFICATION SPEED Long track record in modular power Factory -built power for datacenter and utility customers across the U.S. and Europe MV e -house Hyperscale power skid 4.16–38 kV switchgear, factory -tested Up to 36 kV, Level 3 tested MV and LV power distribution, built, wired and

Slide 45: The AI Module accelerates the build timeline
The AI Module accelerates the build timeline SIMPLIFICATION SPEED Power, cooling and compute built and tested in the factory while the site is prepared Stick -built Design Site and building Power and cooling Racks and integration Commissioning one trade after another AI MODULE Design Site prep site

Slide 46: The Axiom Architecture Lab
The Axiom Architecture Lab Where Axiom builds and validates the full architecture, grid to token, before it reaches a customer site 01 Build 02 Validate 03 Certify 04 Show Complete reference architectures: Power and thermal load testing, FMEA, UL and NVIDIA evaluation, Customers see the whole system

Slide 47: More tokens from every megawatt, sooner
More tokens from every megawatt, sooner One grid -to-token platform built around three outcomes EFFICIENCY SIMPLIFICATION SPEED More compute per megawatt One system, one owner Capacity online sooner ~8 pts One platform Up to 50% efficiency improvement, grid -to-chip conversion and agile backup in th

Slide 48: Winning Across the Architecture
SECTION 03 Winning Across the Architecture Rob Campbell Expected Chief Commercial Officer

Slide 49: Driving growth through efficiency, simplification, and speed
Driving growth through efficiency, simplification, and speed 01 02 03 Engage before the Expand across the Execute and scale architecture is set portfolio, programs and from products to systems generations We architect with customers early, Our portfolio breadth allows a single We deliver standalone

Slide 50: High performance AI demands integrated design engagement
High performance AI demands integrated design engagement Rising power density brings chip, rack, and facility decisions together TRADITIONAL MODEL LEADING HIGH -PERFORMANCE AI DEPLOYMENTS Separate decisions, staggered engagement Coordinated earlier across the architecture Chip power & Chip power & c

Slide 51: The buildout is expanding our opportunity on two fronts
The buildout is expanding our opportunity on two fronts Evolving power architectures increase content per MW, while growing AI deployments drive demand for custom compute POWER TODAY’S ARCHITECTURE CLOUD CUSTOM COMPUTE ~$2.8M / MW ~40 %+ Driven by rising rack densities & COOLING market CAGR through

Slide 52: Our deepest customer relationships span the full portfolio
Our deepest customer relationships span the full portfolio Years of engagement across multiple businesses, programs and technology generations. Board - Rack -level Power Critical Liquid Compute Modular Services power power conversion Power cooling Hyperscaler 1 ● ● ● ● ● ○ ● ○ 30+ active programs Hy

Slide 53: Product Showcase
PRODUCT SHOWCASE Chris Butler, Rob Campbell, Todd Hoover, Mattias Jansson

Slide 54: Unlocking the Power Story
SECTION 04 Unlocking the Power Story Kevin Krumm Expected Chief Financial Officer

Slide 55: Multiple growth drivers underpin 20%+ 3-yr. revenue CAGR
Multiple growth drivers underpin 20%+ 3 -yr. revenue CAGR from CY27E to CY30E Strong end -market demand, secured capacity and next -generation architectures provide visibility to sustained growth 01 02 03 STRUCTURAL MARKET GROWTH SCALED CAPACITY AND EXECUTION CONTENT AND REVENUE VISIBILITY Expanding

Slide 56: Scaling revenue and adjusted EBITDA margin through 2030
Scaling revenue and adjusted EBITDA margin through 2030 Strong growth and operating leverage translate into expanding margins and significant cash generation REVENUE GROWTH ADJUSTED EBITDA 01 REVENUE GROWTH 02 BY SEGMENT 03 MARGIN EXPANSION Drivers Drivers Drivers • Committed program ramps • Power f

Slide 57: Path to 800V expands our power opportunity
Path to 800V expands our power opportunity Existing products provide the foundation; 800V and new solutions drive growth through CY30 ILLUSTRATIVE POWER REVENUE OPPORTUNITY 40%+ 3-Yr. Revenue CAGR CY2 7E to CY30 E $6 – $6.3B ~$3.5B Revenue Revenue CY26E CY27E CY28E CY29E CY30E Existing portfolio 800

Slide 58: Power mix shift supports adjusted EBITDA margin expansion
Power mix shift supports adjusted EBITDA margin expansion A larger contribution from a higher -margin, expanding -margin Power business supports consolidated margin expansion. TOTAL ADJUSTED EBITDA CONTRIBUTION POWER | Adjusted EBITDA Margin Mix by segment CY26E CY27E CY 30 E POWER POWER High Teens

Slide 59: Front-loaded growth investment drives strong cash generation
Front -loaded growth investment drives strong cash generation Capital intensity moderates as capacity comes online, supporting 90%+ FCF conversion by CY2030E CAPITAL EXPENDITURES FREE CASH FLOW CONVERSION % OF REVENUE % OF ADJUSTED NET INCOME ~10% 90%+ ~6% ~40%+ ~3 -4% Negative CY26E CY27E CY2028E C

Slide 60: Disciplined capital allocation prioritizes high-return growth
Disciplined capital allocation prioritizes high -return growth Deploying capital to drive long -term value while targeting investment -grade metrics 01 02 03 ORGANIC GROWTH SELECTIVE M&A BALANCE SHEET FLEXIBILITY First priority for capital Extend products, technology and Target investment -grade met

Slide 61: Strong balance sheet preserves strategic flexibility
Strong balance sheet preserves strategic flexibility Investment -grade metrics and strong liquidity provide capacity to invest through the cycle ~$1.0B+ ~$2.4B ~$1.3B $2.0B CASH TERM DEBT 5 -YEAR REVOLVING PREFERRED CREDIT FACILITY (1) At separation 3- and 5 -yr. 6% cash or SOFR + 137.5 –150 bps 7%

Slide 62: Financial framework and outlook
Financial framework and outlook CY2026 estimate, CY2027 outlook and CY2030 framework: Total Axiom CY26E CY27 OUTLOOK CY30E FRAMEWORK Revenue ~$9.7B $20 – $21B $37B+ (20%+ CY27E – CY30E CAGR) Power ~$3.5B $6 – $6.3B 40%+ CAGR Cloud & Cooling ~$6.2B $14 – $14.7B 10%+ CAGR Adjusted EBITDA Margin ~11% ~

Slide 63: Peer benchmarking
Peer benchmarking POWER CLOUD & COOLING POWER PEERS SPECIALIZED EMS PEERS Peers Power segment Cloud & Cooling segment CY27 Revenue ~76% (1) ~13% median ~131% (1) ~59% median Growth CY27 Adjusted EBITDA Mid-20s ~24% median HSD – LDD ~11% median Margin CY27 revenue growth: CY27E adj. EBITDA margin: CY

Slide 64: Building the capabilities of an independent public company
Building the capabilities of an independent public company IT & FINANCE, TAX & RISK, LEGAL & LEADERSHIP & R&D / CYBERSECURITY CONTROLS COMPLIANCE GOVERNANCE INNOVATION ▪ Standalone ▪ SEC reporting and ▪ Insurance and ▪ Standalone ▪ Standalone applications and technical enterprise risk corporate func

Slide 65: Q&A
Q&A All Speakers Moderated by Michelle Simmons

Slide 66: Axiom is built for the next moment
Axiom is built for the next moment Our portfolio and operating model set us apart and position us to outperform the market. THE RIGHT PRODUCT AND MANUFACTURING DNA + ATTRACTIVE FINANCIAL TECHNOLOGY AI -NATIVE OPERATIONS PROFILE PORTFOLIO ▪ Proven manufacturing and supply ▪ Outgrowing a rapidly expan

Slide 67: Thank You
HANK YOU axiom
Source: company website
More decks from Flex Ltd.
Investor Day (November 2026)46 slides · Nov 10, 2026
Q2 2027 Earnings Presentation21 slides · Oct 28, 2026
Merger or Acquisition (September 2026)8 slides · Sep 4, 2026
Q1 2027 Earnings Presentation22 slides · Jul 29, 2026
Merger or Acquisition (July 2026)39 slides · Jul 20, 2026
Q4 2026 Earnings Presentation30 slides · May 6, 2026