  1. Slide 1: Physical Pipeline Modelling – Inputs and Assumptions

    Slide 1: Physical Pipeline Modelling – Inputs and Assumptions

    Physical Pipeline Modelling – Inputs and Assumptions Pipeline Capacity Consultation Presentation

  2. Slide 2: Forum Agenda

    Slide 2: Forum Agenda

    9:30AM VENUES OPEN Tea, Coffee and Water provided 10:00AM INTRODUCTION Daniel McCarthy 10:15AM CHAIR INTRODUCTION AND HOUSEKEEPING Bruce Girdwood in Wellington Brenda Talacek in Auckland 10:25AM PRESENTATION – Q&A David Innes and Steve Kirkman 12:00PM/12:30PM LUNCH 1:00PM END OF FORMAL FORUM PROCEED

  3. Slide 3: Consultation Process

    Slide 3: Consultation Process

    Consultation Process Informed decision making by Vector 1. Modelling 2. Informed 3. Capacity Inputs and Modelling Determination Assumptions Greater transparency, wider understanding

  4. Slide 4: Modelling Inputs and Assumptions

    Slide 4: Modelling Inputs and Assumptions

    Modelling Inputs and Assumptions Modelling Assumptions Physical behaviour – capacity Simulated pipeline inputs determination (Part A) Model External inputs (Part B) Current Consultation

  5. Slide 5: What do we mean by capacity?

    Slide 5: What do we mean by capacity?

    What do we mean by capacity?  The Model determines physical not commercial capacity  Available capacity allows for:  Forecast peak demand  Maintenance of Systems Security Criteria  Reasonable and Prudent operation of the Transmission System (RPO)

  6. Slide 6: What do we mean by RPO?

    Slide 6: What do we mean by RPO?

    What do we mean by RPO?  Vector is required to operate the Transmission System under the Vector Transmission Code (VTC) as a Reasonable and Prudent Operator (RPO)  RPO means: a standard of performance that is equal to or better than transmission system operating practice as determined by reference

  7. Slide 7: Determining Pipeline Capacity

    Slide 7: Determining Pipeline Capacity

    Determining Pipeline Capacity  The Model determines physical capacity: the ability of a pipeline to meet a specific demand scenario  To find the maximum capacity for a given scenario, load is increased incrementally at one (or more) Delivery Points until the minimum acceptable pressure occurs at s

  8. Slide 8: Determining Pipeline Capacity (2)

    Slide 8: Determining Pipeline Capacity (2)

    Determining Pipeline Capacity (2)  There may be numerous answers to the question of a pipeline’s capacity: eg, the capacity at:  The last Delivery Point on the pipeline  The Delivery Point with the highest daily, or annual, offtake  Any combination of Delivery Points, simultaneously, etc, etc 

  9. Slide 9: Sample Model Output

    Slide 9: Sample Model Output

    Sample Model Output 8500.00 4 . : - - : 8000.00 f---- >e00.00 L-- — Rotowaro Kaui ; — Whangarei H H : : 7000.00 b----- — Westfield j 6500.00 6000.00 f Result Pressure(kPa) 5500.00 5000.00 }---- 4500.00 }---~ 4000.00, 2 0.0 1.00 2.00 3.00 f-===- 4.00 }--- 5.00 }---- 6.00 }---- 7.00 Time (days )

  10. Slide 10: The Model

    Slide 10: The Model

    The Model  The software uses “transient flow” analysis:  Flow at most Delivery Points varies significantly over time, independently of flows at other points  The Model allows scenarios to be analysed:  Scenarios may be any combination of loads and/or physical configurations  If the inputs to a

  11. Slide 11: The Model (2)

    Slide 11: The Model (2)

    The Model (2)  The Model is actually a series of separate and separable “models”:  North (= Rotowaro-north)  Central North (= Rotowaro to Hamilton + Te Kowhai east)  Central South (=Kapuni to Pokuru 2)  Bay of Plenty  Frankley Road to Kapuni  South (= all pipelines south of Kapuni)

  12. Slide 12: Model segments of the pipeline network

    Slide 12: Model segments of the pipeline network

    NORTH BAY OF PLENTY CENTRAL NORTH CENTRAL SOUTH FRANKLEY RD SOUTH

  13. Slide 13: Impact of the Inputs

    Slide 13: Impact of the Inputs

    Impact of the Inputs  These inputs have first order impact on available capacity:  Pipeline diameter and length  Achievable operating pressures  Level and location of demand  Inlet pressure  Delivery pressures  These inputs have second order impact on available capacity:  Gas composition  G

  14. Slide 14: Physical Inputs

    Slide 14: Physical Inputs

    Physical Inputs  Pipeline Sections:  Pipelines are broken down into sections, between “nodes”  Data for each section includes:  Pipe length, outer diameter and wall thickness  Altitude of each end  The pipe roughness and efficiency factor  Examples of nodes include:  Receipt Points and Deliv

  15. Slide 15: Physical Inputs (2)

    Slide 15: Physical Inputs (2)

    Physical Inputs (2)  Receipt Points may be set for flow control or pressure control:  In most cases pressure control is used: flow is the variable  Flow control is used where there is a known limit to the flow of gas (eg maximum output of a gas production station): pressure is the variable  Deli

  16. Slide 16: Physical Inputs (3)

    Slide 16: Physical Inputs (3)

    Physical Inputs (3)  Compression can be modelled in different ways:  By defining the station in full detail, including all suction and discharge piping and valves, the physical parameters of each compressor unit (eg speed range, displaced volume, clearance ratio, capacity/head, rated power of the

  17. Slide 17: External Inputs

    Slide 17: External Inputs

    External Inputs  Gas Composition  Actual compositions at the relevant Receipt Points are used  The Model assumes the same gas composition applies throughout the relevant pipeline during a simulation  This is a simplification, as gas composition varies over time  The effect on capacity of variat

  18. Slide 18: Line Pack

    Slide 18: Line Pack

    Line Pack  Line Pack is the amount of gas in a pipeline at any given time  Line pack is determined by pressures in a pipeline: if a load scenario satisfies minimum pressure requirements then line pack is sufficient

  19. Slide 19: External Inputs: Loads

    Slide 19: External Inputs: Loads

    External Inputs: Loads Selection of the Peak Load  Vector identifies the Monday – Friday period in which aggregate offtake from a pipeline is greatest (5-Day Peak)  The whole week is then modelled to check that pressures recover sufficiently over the weekend

  20. Slide 20: External Inputs: Loads (2)

    Slide 20: External Inputs: Loads (2)

    External Inputs: Loads (2)  The Base Case for modelling peak demand comprises:  Distribution networks: flow profiles for the pipeline’s 5-Day Peak  Plus, adjustment for organic growth and loads not included in the profile (if any)  Direct-feed consumers: flow profiles for the pipeline’s 5-Day Pe

  21. Slide 21: External Inputs: Loads (3)

    Slide 21: External Inputs: Loads (3)

    External Inputs: Loads (3)  Peak demand for distribution networks almost always occurs in winter  Direct-feed consumers can be seasonal  Power stations can ramp up to maximum at any time of year  The 5-Day Peak varies year to year in both timing and size  The peak day does not always occur in t

  22. Slide 22: Example: Greater Auckland

    Slide 22: Example: Greater Auckland

    Example: Greater Auckland Greater Auckland: Average Flow Rate in 5-Day Peak Total Bruce Maclaren Henderson Papakura Westfield Linear (Total) 16 Trend: y = 0.1889x - 366.45 14 12 Flow Rate, scm/s 10 8 6 4 2 0 01 02 03 04 05 06 07 08 09 10 11 20 20 20 20 20 20 20 20 20 20 20

  23. Slide 23: Retail MDQ & Offtake, GJ/day

    Slide 23: Retail MDQ & Offtake, GJ/day

    Retail MDQ & Offtake, GJ/day 1 O - ct ob 10,000 20,000 30,000 40,000 50,000 60,000 70,000 15 O er c 29 to be O r 12 cto N b ov er 26 e m N b ov er 10 e m D b ec er 24 e m D b ec er em 7 b Ja er n 21 uar Ja y nu 4 a Auckland Zone O/T Fe ry br 18 ua Fe ry br ua 4 ry M a 18 rch M ar ch 1 Ap r Auckland

  24. Slide 24: Rotowaro-north Capacity Entitlements

    Slide 24: Rotowaro-north Capacity Entitlements

    Rotowaro-north Capacity Entitlements Rotowaro-north pipeline: Firm Transmission Capacity on 09/09/2011 Retail C apacity (Auckland Zone) 33% Total 176 TJ/day Power Stations 56% Retail C apacity (excl. Auckland) 11%

  25. Slide 25: Minimum Acceptable Pressure

    Slide 25: Minimum Acceptable Pressure

    Minimum Acceptable Pressure  Pressures determined by the Model must satisfy System Security Criteria  Except as otherwise contracted, minimum pipeline pressures must be consistent with Schedule 1 of the Critical Contingency Management (CCM) Regulations  Allowance is made for the time required to

  26. Slide 26: High Contracted Delivery Pressures

    Slide 26: High Contracted Delivery Pressures

    High Contracted Delivery Pressures Consumer Nominal Delivery Pressure (bar g) Otahuhu B Nominal 48 Southdown Minimum 49 Te Rapa Cogeneration Plant Nominal 22.5 Taranaki Combined-Cycle Nominal 31

  27. Slide 27: Sample Model Output

    Slide 27: Sample Model Output

    Sample Model Output 8500.00 4 . : - - : 8000.00 f---- >e00.00 L-- — Rotowaro Kaui ; — Whangarei H H : : 7000.00 b----- — Westfield j 6500.00 6000.00 f Result Pressure(kPa) 5500.00 5000.00 }---- 4500.00 }---~ 4000.00, 2 0.0 1.00 2.00 3.00 f-===- 4.00 }--- 5.00 }---- 6.00 }---- 7.00 Time (days )

  28. Slide 28: Economic Design Standard

    Slide 28: Economic Design Standard

    Economic Design Standard  It is not feasible to provide unlimited capacity  Pipelines need to be designed for some peak load  An economic design standard should be set  Designing for a 1 in 20-year peak demand is not uncommon  An economic design standard could result in peak time rationing in s

  29. Slide 29: Are there any Questions?

    Slide 29: Are there any Questions?

    Vector (7 Are there any Questions?

  30. Slide 30: Consultation Indicative Timelines

    Slide 30: Consultation Indicative Timelines

    Consultation Indicative Timelines WHAT WHEN DISCUSSION PAPERS: RELEASED: 7 NOVEMBER 2011 Physical Modelling Inputs Discussion Paper Vector as a Reasonable and Prudent Operator RESPONSES TO THE SUBMISSIONS: RELEASED: 7 NOVEMBER 2011 On the Pipeline Capacity Consultation Paper FIRST CONSULTATION FORUM

  31. Slide 31: Final House Keeping - Reminders

    Slide 31: Final House Keeping - Reminders

    Final House Keeping - Reminders  Submissions are due as word documents by Close of Business (5PM) Friday 2 December  Any confidential information should be provided in a separately marked copy (in other words please send two clearly marked copies)  All submissions not marked confidential will be

  32. Slide 32: Thank You for Participation

    Slide 32: Thank You for Participation

    Vector 7 THANK YOU FOR PARTICIPATION

  33. Slide 33: Supplementary Slides: Compression

    Slide 33: Supplementary Slides: Compression

    Supplementary Slides Compression

  34. Slide 34: Pressure and Compression

    Slide 34: Pressure and Compression

    Pressure and Compression  Gas flows in a pipeline in response to a pressure gradient  Pressure gradients arise whenever gas is taken at Delivery Points: the more gas taken, the steeper the gradient and the greater the flow  A compressor increases flow by “steepening” the pressure gradient, while

  35. Slide 35: Compression Capacity Checking

    Slide 35: Compression Capacity Checking

    Compression Capacity Checking  If compression is represented by a fixed discharge pressure, “real” compressors are not actually modelled  It may then be necessary to check that the required flow does not exceed the capacity of the relevant compression, ie:  the maximum flow rate at the compressor

  36. Slide 36: Compression Capacity Checking

    Slide 36: Compression Capacity Checking

    Compression Capacity Checking  Vector’s North and BOP pipelines require an inlet pressure much higher than that available from the Maui Pipeline  Maui Pipeline pressure may vary significantly, depending on whether Mokau compressor station is operating or not  Mokau is operated according to the re

  37. Slide 37: Rotowaro: Capacity vs Suction Pressure

    Slide 37: Rotowaro: Capacity vs Suction Pressure

    Rotowaro: Capacity vs Suction Pressure Unit Type Rated Flow/Unit @ Suction Pressure: 30 bar g 35 bar g 40 bar g 45 bar g 50 bar g 3&4 Reciprocating scm/s 8 10 12 15 18 TJ/day 28 35 41 52 62 5&6 Centrifugal scm/s 44 50 58 64 TJ/day 152 173 200 221

  38. Slide 38: Kapuni & Pokuru Compression Capacity

    Slide 38: Kapuni & Pokuru Compression Capacity

    Kapuni & Pokuru Compression Capacity  Compression at Kapuni consists of 3 reciprocating units:  They receive gas from 300 Line and/or the KGTP  Suction pressure is controlled (removing it as a variable)  Deliverability is ~80 TJ/day while preserving n-1 redundancy  Compression at Pokuru consist